Document List by Author

DocDB Home ]  [ Search ] [ Recent Changes ]

Yuta Michimura of Physics Department, The University of Tokyo is listed as an author on the following documents:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
P1707191-v1 The status of KAGRA underground cryogenic gravitational wave telescope (proceedings) Yuta Michimura KAGRA
Conference
Paper
21 Sep 2017
G1707203-v1 Basics of Interferometer Response and Calibration Considerations Yuta Michimura KAGRA
Interferometer
20 Sep 2017
L1707146-v0 Minutes of the 17th KAGRA Face to Face Meeting (Aug 28-30, 2017) Yuta Michimura KAGRA F2F
KAGRA
04 Sep 2017
G1706968-v4 重力波望遠鏡KAGRAの主干渉計高度化 Yuta Michimura Interferometer Sensing and Control
Data Analysis
Interferometer
JPS
13 Sep 2017
D1402986-v20 KAGRA ISC Electrical Components Layout Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
MC
11 Sep 2017
P1707051-v2 Mirror actuation design for the interferometer control of the KAGRA gravitational wave telescope Yuta Michimura Seismic Isolation
KAGRA
Suspensions
Length Sensing and Control
11 Sep 2017
T1707079-v4 MIF Schedule Estimate for bKAGRA Phase 2 Yuta Michimura Interferometer Sensing and Control
KAGRA
06 Sep 2017
G1707134-v1 Summary of KSC Session F2F 2017 Aug Yuta Michimura KAGRA F2F
KAGRA
30 Aug 2017
G1706950-v4 The status of KAGRA underground cryogenic gravitational wave telescope Yuta Michimura KAGRA
Conference
27 Jul 2017
T1706953-v3 Cartoon of the optical layout around IMC, IFI and IMM Yuta Michimura Interferometer Sensing and Control
KAGRA
18 Jul 2017
T1605967-v3 Cartoon of the optical layout around SRs Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
18 Jul 2017
E1605649-v0 Document Tree for KAGRA Status Talks Yuta Michimura KAGRA
18 Jul 2017
G1706791-v2 重力波観測の現状と展望 Yuta Michimura KAGRA
Seminar
15 Jun 2017
T1605692-v9 Commissioning Procedure for bKAGRA Phase 1 Yuta Michimura Cryogenic
KAGRA
Vacuum
Interferometer
12 Jun 2017
T1503453-v16 Actuator Noise Modeling Report Yuta Michimura Seismic Isolation
KAGRA
Suspensions
Length Sensing and Control
12 Jun 2017
G1706755-v5 Possibility of Upgrading KAGRA Yuta Michimura KAGRA meeting
KAGRA
24 May 2017
G1706729-v1 MIFなどの紹介 (KAGRA合同サブグループ説明会) Yuta Michimura Interferometer Sensing and Control
KAGRA
17 May 2017
G1706485-v13 Possible KAGRA Upgrades Yutaro Enomoto et al. GWADW
KAGRA
09 May 2017
L1706435-v1 Minutes of the 16th KAGRA Face to Face Meeting (Mar 28-30, 2017) Yuta Michimura KAGRA F2F
KAGRA
24 Apr 2017
G1706333-v12 重力波望遠鏡KAGRAの低温動作に向けた主干渉計開発 Yuta Michimura KAGRA meeting
KAGRA
JPS
Length Sensing and Control
31 Mar 2017
G1706378-v5 KAGRA MIF Status Report (F2F Mar 29, 2017) Yuta Michimura KAGRA F2F
Interferometer Sensing and Control
KAGRA
31 Mar 2017
G1706398-v3 Proposal to start integrated KAGRA+ planning (F2F March 2017) Yuta Michimura et al. KAGRA F2F
KAGRA
R&D
30 Mar 2017
G1706390-v1 Informal Session for Students and Young Researchers (F2F March 2017) Keiko Kokeyama et al. System Engineering
KAGRA F2F
KAGRA
27 Mar 2017
T1706138-v2 Beam Propagation for bKAGRA Phase 1 with flat ETMs Yuta Michimura Chief meeting
KAGRA
Optics
Interferometer
14 Feb 2017
G1706112-v5 Status of KAGRA (ELiTES 5th general meeting) Yuta Michimura KAGRA
Conference
08 Feb 2017
L1605947-v1 Minutes of the 15th KAGRA Face to Face Meeting (Dec 7-8, 2016) Yuta Michimura KAGRA F2F
KAGRA
01 Feb 2017
S1706073-v1 Axiom Optics Cincam CMOS 1201 S_No.001 Yuta Michimura KAGRA
Laser
26 Jan 2017
T1706077-v1 Basic Idea of iKAGRA Calibration Yuta Michimura Interferometer Sensing and Control
KAGRA
20 Jan 2017
T1605986-v2 Request for circuit: Optical Lever QPD Amplifier Yuta Michimura KAGRA
Circuits
26 Dec 2016
T1605839-v2 Request for circuit: Universal Whitening Filter with DC Power Yuta Michimura KAGRA
Circuits
26 Dec 2016
S1605990-v0 Agilent N5181B MXG X-Series RF Analog Signal Generator Yuta Michimura KAGRA
Modulation
Circuits
26 Dec 2016
T1605353-v12 Arm Length Stabilizaton Conceptual Design Yuta Michimura Interferometer Sensing and Control
KAGRA
Length Sensing and Control
16 Dec 2016
G1605906-v4 KAGRA MIF Status Report (F2F Dec 7, 2016) Yuta Michimura KAGRA F2F
KAGRA
07 Dec 2016
T1605846-v0 Installation Procedure for IMC REFL Optical Table Yuta Michimura KAGRA
Optics
Infrastructure
16 Nov 2016
D1504268-v4 RF Patch Panel for KAGRA Yuta Michimura Interferometer Sensing and Control
KAGRA
14 Nov 2016
D1504460-v5 RF Distribution Amplifier Top Assembly Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
Circuits
14 Nov 2016
L1605744-v1 Acceptance for PRM transmission 10.35 % Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
Optics
Length Sensing and Control
14 Oct 2016
T1605595-v12 Interferometer design for bKAGRA Phase 1 and Beyond Yuta Michimura Interferometer Sensing and Control
KAGRA
26 Sep 2016
G1605545-v2 Summary of iKAGRA Run Yuta Michimura KAGRA F2F
KAGRA
Interferometer
21 Sep 2016
G1605389-v3 大型低温重力波望遠鏡KAGRAプロジェクトの現状 Yuta Michimura KAGRA
JPS
20 Sep 2016
T1605274-v5 MIF Commissioning Schedule Estimate for bKAGRA Phase 1 Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
Interferometer
13 Sep 2016
T1605492-v2 Request for circuit: Frequency Doubler Yuta Michimura KAGRA
Circuits
08 Sep 2016
T1605626-v2 ALS Sideband Frequency Yuta Michimura Interferometer Sensing and Control
KAGRA
05 Sep 2016
T1605493-v2 bKAGRA IMC sideband frequency Yuta Michimura KAGRA
Modulation
MC
Length Sensing and Control
31 Aug 2016
G1605563-v4 KAGRA MIF Status Report (F2F Aug 26, 2016) Yuta Michimura KAGRA F2F
KAGRA
Interferometer
26 Aug 2016
E1605517-v0 MIF Documents and Drawings Tree Yuta Michimura Management
System Engineering
KAGRA
16 Aug 2016
T1605491-v1 Request for circuit: Common Mode Servo Board Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605489-v1 Request for circuit: High Power Coil Driver Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605490-v1 Request for circuit: RF Distribution Amplifier Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605488-v1 Request for circuit: Quad IQ Demodulator ASC Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605487-v1 Request for circuit: Quad IQ Demodulator LSC Yuta Michimura KAGRA
Circuits
09 Aug 2016
M1605401-v1 MIF Schedule for bKAGRA Phase 1 Yuta Michimura System Engineering
Interferometer Sensing and Control
KAGRA
25 Jul 2016
T1503547-v5 bKAGRA PSL Design Study Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
Laser
22 Jul 2016
D1503189-v3 bKAGRA PSL EOM Layout Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
18 Jul 2016
G1605195-v4 Recent news and status of the KAGRA gravitational wave telescope Yuta Michimura KAGRA
Conference
Interferometer
12 Jul 2016
L1605334-v2 List of drivers for IMC, OFI, OMMT, OMC, OSM Yuta Michimura KAGRA
Suspensions
29 Jun 2016
G1605308-v5 重力波望遠鏡KAGRAで聞く! ブラックホール誕生の声 Yuta Michimura KAGRA
25 Jun 2016
T1504450-v7 BS Actuator Design (including design for SRs and PRs) Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
Suspensions
Circuits
16 Jun 2016
G1605201-v5 iKAGRAの教訓 MIFコミッショニング現場の視点から Yuta Michimura Scheduling
System Engineering
Chief meeting
KAGRA
Safety
Suspensions
Interferometer
14 Jun 2016
T1605261-v1 Cartoon of the optical layout around PRs Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
03 Jun 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura Chief meeting
Interferometer Sensing and Control
KAGRA
Interferometer
MC
13 May 2016
G1605155-v2 iKAGRA反省会 Yuta Michimura Scheduling
Management
KAGRA
Seminar
Safety
Suspensions
Interferometer
11 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura Chief meeting
Interferometer Sensing and Control
KAGRA
Vacuum
Suspensions
Laser
MC
22 Apr 2016
T1402346-v3 Noise Requirement for QPDs on TMS Yuta Michimura KAGRA
Alignment Sensing and control
19 Apr 2016
T1605109-v1 iKAGRA online calibration for April test run 2016 Yuta Michimura Interferometer Sensing and Control
KAGRA
09 Apr 2016
G1605000-v5 重力波望遠鏡KAGRAにおける主干渉計制御 Yuta Michimura Interferometer Sensing and Control
KAGRA
JPS
22 Mar 2016
T1604823-v10 Initial Alignment Procedure for iKAGRA Yuta Michimura KAGRA
Vacuum
Interferometer
01 Mar 2016
T1503190-v8 RF and AF Cabling Policy for KAGRA ISC Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
12 Jan 2016
D1402984-v13 iKAGRA ISC Cabling Diagram Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
MC
12 Jan 2016
D1403028-v12 Cable Lengths for iKAGRA ISC Yuta Michimura KAGRA
Circuits
06 Nov 2015
D1504240-v9 Breakout Cable for TTFSS Interface Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
16 Oct 2015
S1504391-v0 Power Box for TTFSS Interface Breakout Cable S_No.(B_No.001) Yuta Michimura KAGRA
Laser
16 Oct 2015
S1504389-v0 TTFSS Interface Breakout Cable S_No.(B_No.001) Yuta Michimura KAGRA
Laser
16 Oct 2015
S1504390-v0 TTFSS Interface Breakout Cable S_No.(B_No.002) Yuta Michimura KAGRA
Laser
16 Oct 2015
G1504275-v3 重力波望遠鏡KAGRAの主干渉計制御設計II Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
JPS
27 Sep 2015
G1504270-v1 計算機を利用したKAGRAの制御(Ⅶ) Kyosuke Awai et al. Digital Control
KAGRA
JPS
25 Sep 2015
G1504215-v2 iKAGRA ISC Analog Electronics Readiness Status Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
Circuits
07 Sep 2015
S1503423-v0 DAC board Yuta Michimura Digital Control
Data Acquisition
KAGRA
03 Sep 2015
G1504030-v3 KAGRA MIF Status Report (F2F Aug 27, 2015) Yuta Michimura KAGRA F2F
Interferometer Sensing and Control
KAGRA
27 Aug 2015
D1503415-v4 Summary of Suspension Configurations Yuta Michimura Seismic Isolation
KAGRA
Suspensions
24 Jul 2015
T1503330-v1 KAGRA Frequency Stabilization Servo Modeling Report (preliminary) Yuta Michimura Interferometer Sensing and Control
KAGRA
Laser
MC
Length Sensing and Control
03 Jun 2015
G1503582-v3 KAGRA MIF Status Report (May 26, 2015) Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
Suspensions
26 May 2015
G1503555-v1 KAGRA Lock Acquisition in One Slide Yuta Michimura GWADW
Interferometer Sensing and Control
KAGRA
20 May 2015
T1503387-v4 Production request for RF QPD Interface Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Circuits
30 Mar 2015
T1503388-v1 Production request for RF PD Interface Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Circuits
30 Mar 2015
D1503389-v6 Intensity Stabilization Servo Plan Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
27 Mar 2015
G1503433-v2 重力波望遠鏡KAGRAの主干渉計制御設計 Yuta Michimura Interferometer Sensing and Control
KAGRA
JPS
22 Mar 2015
T1503395-v6 Noise Requirement for IMC QPDs Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
MC
13 Mar 2015
T1402332-v3 Beam Jitter Requirements for PSL Beam Yuta Michimura Interferometer Sensing and Control
KAGRA
MC
12 Mar 2015
T1503386-v2 Production request for DC QPD Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Circuits
09 Mar 2015
T1503327-v7 Positive-g bKAGRA Arm Cavity: ASC Point of View Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
25 Feb 2015
G1503331-v7 Optomechanical Instability in the KAGRA Gravitational Wave Telescope Yuta Michimura KAGRA
Workshop
Alignment Sensing and control
20 Feb 2015
D1402607-v1 KAGRA用光学定盤の高さ Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
Optics
09 Feb 2015
G1503267-v3 New iKAGRA Configuration Yuta Michimura KAGRA F2F
Interferometer Sensing and Control
KAGRA
06 Feb 2015
T1503255-v5 Modification Plan for Common Mode Servo Board Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
MC
23 Jan 2015
G1403127-v1 iKAGRA Michelson Yoichi Aso et al. KAGRA
22 Dec 2014
D1403111-v2 Differential or Single-Ended, Which Should We Use for FSS Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
16 Dec 2014
D1403033-v5 Extra Cable Racks We Need for IOO+MIF+VIS+AOS Yuta Michimura KAGRA
Circuits
Infrastructure
04 Dec 2014
D1403017-v3 Optical Levers: Layout and Cabling Yuya Kuwahara et al. KAGRA
Circuits
25 Nov 2014
T1402913-v7 Requirements for IMC Mirror Placement Yuta Michimura Interferometer Sensing and Control
KAGRA
20 Nov 2014
T1402941-v3 Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Interferometer Sensing and Control
KAGRA
MC
31 Oct 2014
D1402908-v3 IMC Servo Topology Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
KAGRA
MC
30 Oct 2014
D1402519-v8 Optical/Electrical Components Needed for iKAGRA IMC Servo Yuta Michimura Seismic Isolation
Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
MC
Length Sensing and Control
04 Aug 2014
T1202403-v1 KAGRAでは光てこをどうするか Yuta Michimura KAGRA meeting
KAGRA
Alignment Sensing and control
19 May 2014
T1402349-v3 Study on iKAGRA PMC Yuta Michimura KAGRA
Laser
MC
19 Apr 2014
G1402319-v3 新潟大学IMC WFS打ち合せ資料 Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
MC
18 Apr 2014
G1402327-v3 Hafordに行ってきました~2014冬~ Yuta Michimura Interferometer Sensing and Control
KAGRA
Seminar
Other Groups
11 Apr 2014
T1200913-v6 KAGRA Main Interferometer Design Document Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
Others
Interferometer
Length Sensing and Control
19 Feb 2014
G1402171-v1 Some calculations for BRT design Yuta Michimura KAGRA
Alignment Sensing and control
30 Jan 2014
G1301802-v1 Alignment Sensing and Control for KAGRA Interferometer Yuta Michimura Interferometer Sensing and Control
KAGRA
Workshop
Alignment Sensing and control
16 Aug 2013
G1301779-v2 WFS Shot Noise Requirement Yuta Michimura KAGRA F2F
KAGRA
Alignment Sensing and control
02 Aug 2013
G1301664-v1 WFS信号への要求値 Yuta Michimura Data Analysis
Alignment Sensing and control
28 May 2013
G1301633-v2 Alignment Sensing and Control for KAGRA Yuta Michimura KAGRA
Workshop
Alignment Sensing and control
19 Apr 2013
G1301556-v1 量子論からみた検出限界について Yuta Michimura Theory
Seminar
01 Mar 2013
G1101303-v1 Alignment Sensing and Control for LCGT Yuta Michimura KAGRA
Conference
Alignment Sensing and control
02 Oct 2012
G1201242-v2 BS Thermal Lensing in KAGRA Yuta Michimura KAGRA
Workshop
Interferometer
17 Aug 2012
G1200808-v1 LCGT ASC Recap Yuta Michimura KAGRA
Alignment Sensing and control
Special Working Group
26 Jan 2012
G1100608-v1 LCGTのアラインメント制御 Yuta Michimura KAGRA
Alignment Sensing and control
JPS
21 Sep 2011
G1100606-v3 Three-dimensional Rigid-Body Models of the Vibration Isolation Systems for LCGT Riccardo DeSalvo et al. Seismic Isolation
KAGRA
JPS
20 Sep 2011
G1100533-v1 Current Status of ASC Design for LCGT Yuta Michimura KAGRA F2F
KAGRA
Alignment Sensing and control
03 Aug 2011

Number of documents found: 120

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.44 usr + 0.04 sys = 0.48 CPU)