Document List by Topic

DocDB Home ]  [ Search ] [ Recent Changes ]

These documents on Chief meeting (subtopic of Collaboration meeting) are available:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G1605201-v0 iKAGRAの教訓 MIFの視点から Yuta Michimura System Engineering
Interferometer
Chief meeting
Scheduling
Safety
KAGRA
Suspensions
17 May 2016
G2112472-v3 MIF Report for the bKAGRA Phase 2,3 Evaluation Meeting 2021 Yuta Michimura KAGRA
Chief meeting
Interferometer
25 Jan 2021
D1605823-v5 IMMT2 modification Naoko Ohishi KAGRA
Suspensions
Chief meeting
21 May 2020
G1910807-v3 Report on Simulation Studies on Interferometer Configuration for O3 Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Chief meeting
18 Sep 2019
G1910497-v1 Duct Cryocooler maintenance Nobuhiro Kimura KAGRA
Cryogenic
Chief meeting
29 Jul 2019
G1910388-v1 Polarization issue in the central IFO Yutaro Enomoto KAGRA
Chief meeting
05 Jul 2019
G1909840-v2 Current commissioning status Osamu Miyakawa Interferometer
KAGRA
Chief meeting
18 Feb 2019
G1909657-v3 Report of commissioning tasks Osamu Miyakawa Interferometer
Chief meeting
KAGRA
04 Feb 2019
G1809428-v2 Report of recent commissioning work. Osamu Miyakawa KAGRA
Chief meeting
10 Dec 2018
G1809358-v1 Current status of OMMT/OSTM Naoko Ohishi KAGRA
Suspensions
Chief meeting
03 Dec 2018
E1808952-v4 Present condition of the EXC, IXC and others Nobuhiro Kimura KAGRA
Cryogenic
Chief meeting
03 Sep 2018
G1808317-v1 Material for Extended Chief meeting: Thoughts on inviting foreign experts Kiwamu Izumi KAGRA
Chief meeting
28 May 2018
G1707060-v2 Green systemの現状@拡大チーフ会議 Shogo Kambara Chief meeting
KAGRA
Optics
21 Aug 2017
G1707059-v1 グリーンシステムの現状@拡大チーフ会議 Shogo Kambara Optics
KAGRA
Chief meeting
21 Aug 2017
T1706138-v2 Beam Propagation for bKAGRA Phase 1 with flat ETMs Yuta Michimura Interferometer
Optics
KAGRA
Chief meeting
14 Feb 2017
G1605903-v1 Results of the performance test of the Y-end cryostat Nobuhiro Kimura Cryogenic
KAGRA
Chief meeting
05 Dec 2016
G1605824-v2 20161107-拡大チーフ会議資料(低温-CRY) Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
07 Nov 2016
G1705759-v1 坑口キーボックス Yoshio Saito Chief meeting
KAGRA
Others
21 Oct 2016
T1605694-v1 steps in Y-end approach to the 2nd story Yoshio Saito Chief meeting
KAGRA
Infrastructure
22 Sep 2016
G1605417-v7 Report of the KAGRA-Virgo(-LIGO) joint measurement of Schumann resonance Kazuhiro Hayama Others
Chief meeting
KAGRA
01 Aug 2016
T1605385-v1 2nd stories chamber position_July2016 Yoshio Saito KAGRA
Chief meeting
Vacuum
18 Jul 2016
G1605351-v1 CRY_bKAGRA_schedule_meeting_20160704 Takayuki Tomaru Chief meeting
KAGRA
Cryogenic
04 Jul 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura Interferometer
Interferometer Sensing and Control
KAGRA
Chief meeting
MC
13 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura Interferometer Sensing and Control
Vacuum
KAGRA
Suspensions
MC
Laser
Chief meeting
22 Apr 2016
G1504438-v2 OMCsuspension Kentaro Somiya Chief meeting
26 Oct 2015
T1503724-v2 MCe mirror installation procedure Naoko Ohishi Chief meeting
MC
KAGRA
22 Jun 2015
G1503250-v1 seismicVibrationYend Takayuki Tomaru KAGRA
Seismic Isolation
Chief meeting
19 Jan 2015
G1403084-v1 SeismicVibration Takayuki Tomaru Seismic Isolation
KAGRA
Chief meeting
08 Dec 2014
D1402973-v1 corrugated pipe assembly Takayuki Tomaru KAGRA
Chief meeting
Vacuum
10 Nov 2014
G1402932-v1 X&Y-end cryostat construction schedule Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
27 Oct 2014
G1402786-v2 140916-Sokuryoh-KIzyun-Kekka.pdf Takayuki Tomaru Chief meeting
KAGRA
Cryogenic
16 Sep 2014
T1402784-v2 20140916-Sokuryohki-no-tukaikata Takayuki Tomaru Chief meeting
Cryogenic
KAGRA
16 Sep 2014
T1402783-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
16 Sep 2014
T1402782-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura KAGRA
Cryogenic
Chief meeting
16 Sep 2014
T1402781-v1 クライオスタット組立手順案(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura KAGRA
Cryogenic
Chief meeting
16 Sep 2014
T1402780-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.pdf Nobuhiro Kimura Chief meeting
Cryogenic
KAGRA
16 Sep 2014
T1402779-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.mpp Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
16 Sep 2014
T1402778-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02-2007.mpp Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
16 Sep 2014
G1301657-v2 Sapphire mirror suspension Kazuhiro Yamamoto Cryogenic
KAGRA
Chief meeting
27 Nov 2013
G1301798-v1 透過光モニター用テレスコープ(bBRT)について Shigeo Nagano KAGRA
Chief meeting
Auxiliary IFO
13 Aug 2013

Number of documents found: 40

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 3 wallclock secs ( 1.29 usr + 0.17 sys = 1.46 CPU)