Document List by Topic

DocDB Home ]  [ Search ] [ Recent Changes ]

These documents on Chief meeting (subtopic of Collaboration meeting) are available:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G1707060-v2 Green systemの現状@拡大チーフ会議 Shogo Kambara Optics
Chief meeting
KAGRA
21 Aug 2017
G1707059-v1 グリーンシステムの現状@拡大チーフ会議 Shogo Kambara Optics
Chief meeting
KAGRA
21 Aug 2017
T1706138-v2 Beam Propagation for bKAGRA Phase 1 with flat ETMs Yuta Michimura Interferometer
Optics
Chief meeting
KAGRA
14 Feb 2017
G1605903-v1 Results of the performance test of the Y-end cryostat Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
05 Dec 2016
D1605823-v4 IMMT2 modification Naoko Ohishi Suspensions
Chief meeting
KAGRA
07 Nov 2016
G1605824-v2 20161107-拡大チーフ会議資料(低温-CRY) Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
07 Nov 2016
G1705759-v1 坑口キーボックス Yoshio Saito Others
Chief meeting
KAGRA
21 Oct 2016
T1605694-v1 steps in Y-end approach to the 2nd story Yoshio Saito Infrastructure
Chief meeting
KAGRA
22 Sep 2016
G1605417-v7 Report of the KAGRA-Virgo(-LIGO) joint measurement of Schumann resonance Kazuhiro Hayama Others
Chief meeting
KAGRA
01 Aug 2016
T1605385-v1 2nd stories chamber position_July2016 Yoshio Saito Chief meeting
Vacuum
KAGRA
18 Jul 2016
G1605351-v1 CRY_bKAGRA_schedule_meeting_20160704 Takayuki Tomaru Cryogenic
Chief meeting
KAGRA
04 Jul 2016
G1605201-v5 iKAGRAの教訓 MIFコミッショニング現場の視点から Yuta Michimura Interferometer
Scheduling
Safety
Suspensions
Chief meeting
KAGRA
System Engineering
14 Jun 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura Interferometer
MC
Chief meeting
Interferometer Sensing and Control
KAGRA
13 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura MC
Suspensions
Chief meeting
Vacuum
Interferometer Sensing and Control
KAGRA
Laser
22 Apr 2016
G1504438-v2 OMCsuspension Kentaro Somiya Chief meeting
26 Oct 2015
T1503724-v2 MCe mirror installation procedure Naoko Ohishi MC
Chief meeting
KAGRA
22 Jun 2015
G1503250-v1 seismicVibrationYend Takayuki Tomaru Seismic Isolation
Chief meeting
KAGRA
19 Jan 2015
G1403084-v1 SeismicVibration Takayuki Tomaru Seismic Isolation
Chief meeting
KAGRA
08 Dec 2014
D1402973-v1 corrugated pipe assembly Takayuki Tomaru Chief meeting
Vacuum
KAGRA
10 Nov 2014
G1402932-v1 X&Y-end cryostat construction schedule Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
27 Oct 2014
G1402786-v2 140916-Sokuryoh-KIzyun-Kekka.pdf Takayuki Tomaru Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402784-v2 20140916-Sokuryohki-no-tukaikata Takayuki Tomaru Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402783-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402782-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402781-v1 クライオスタット組立手順案(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402780-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402779-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.mpp Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402778-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02-2007.mpp Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
G1301657-v2 Sapphire mirror suspension Kazuhiro Yamamoto Cryogenic
Chief meeting
KAGRA
27 Nov 2013
G1301798-v1 透過光モニター用テレスコープ(bBRT)について Shigeo Nagano Auxiliary IFO
Chief meeting
KAGRA
13 Aug 2013

Number of documents found: 30

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.37 usr + 0.05 sys = 0.42 CPU)