JGW-T1605595-v12

DocDB Home ]  [ Search ] [ Recent Changes ]

Interferometer design for bKAGRA Phase 1 and Beyond

Document #:
JGW-T1605595-v12
Document type:
T
Submitted by:
Yuta Michimura
Updated by:
Yuta Michimura
Document Created:
27 Aug 2016, 11:49
Contents Revised:
26 Sep 2016, 16:54
DB Info Revised:
26 Sep 2016, 16:54
Viewable by:
Modifiable by:
Other Versions:
JGW-T1605595-v11
20 Sep 2016, 20:57
JGW-T1605595-v10
14 Sep 2016, 14:00
JGW-T1605595-v9
14 Sep 2016, 13:06
JGW-T1605595-v8
13 Sep 2016, 19:48
JGW-T1605595-v7
13 Sep 2016, 16:22
JGW-T1605595-v6
13 Sep 2016, 15:54
JGW-T1605595-v5
07 Sep 2016, 15:53
JGW-T1605595-v4
07 Sep 2016, 15:51
JGW-T1605595-v3
06 Sep 2016, 12:17
JGW-T1605595-v2
05 Sep 2016, 16:38
JGW-T1605595-v1
31 Aug 2016, 11:33
JGW-T1605595-v0
27 Aug 2016, 13:30
Abstract:
This document summarizes the interferometer design for bKAGRA Phase 1 (3-km (power-recycled) Michelson).
We will focus on Michelson operation before the deadline (2018.3.31), but we will try PRMI after we meet the deadline until the end of June 2018 (before ITM cryopayload installation starts).

It also includes summarized commissioning schedule with a flow chart.
Files in Document:
Keywords:
ISC MIF IOO design PRMI
Notes and Changes:
-v11: Revised from discussion with T. Uchiyama, T. Akutsu. Presented at ISC meeting on Sept 20, 2016. MIF agreed.
Related Documents:
Referenced by:
DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators