Document List by Author

DocDB Home ]  [ Search ] [ Recent Changes ]

Yutaro Enomoto of Department of Applied Physics, The University of Tokyo is listed as an author on the following documents:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G2113262-v3 Study of birefringence effects with realistic mirror maps Haoyu Wang et al. Optics
KAGRA
KAGRA F2F
02 Dec 2021
T2011633-v4 Arm cavity round-trip loss measurement with ITM inhomogeneity and birefringence Yutaro Enomoto et al. Interferometer
KAGRA
25 Jun 2021
T1809537-v6 Example sensitivity curves for the KAGRA upgrade Yutaro Enomoto et al. KAGRA
R&D
16 Jun 2020
P1911103-v12 [Thesis] Interferometer Locking Scheme for Advanced Gravitational-Wave Detectors and Beyond Yutaro Enomoto Interferometer Sensing and Control
Thesis
KAGRA
R&D
17 Feb 2020
P1910539-v7 [Draft] An arm length stabilization system for KAGRA and future gravitational-wave detectors Yutaro Enomoto Interferometer Sensing and Control
KAGRA
14 Jan 2020
G1911057-v2 [F2F thesis presentation] Interferometer Locking Scheme for Advanced Gravitational-Wave Detectors and Beyond Yutaro Enomoto R&D
Interferometer Sensing and Control
KAGRA
KAGRA F2F
03 Dec 2019
T1909952-v6 KAGRA sensitivity in pyGWINC style Yutaro Enomoto et al. Others
KAGRA
Interferometer
24 Aug 2019
D1909844-v3 Rack design schematic for OMC1 Yutaro Enomoto et al. Interferometer Sensing and Control
Alignment Sensing and control
Digital Control
KAGRA
Data Acquisition
Calibration
Interferometer
System Engineering
Circuits
Length Sensing and Control
10 Jul 2019
G1910388-v1 Polarization issue in the central IFO Yutaro Enomoto KAGRA
Chief meeting
05 Jul 2019
T1910396-v1 Proposal to put polarizers inside PRC and SRC Yutaro Enomoto et al. Interferometer
Interferometer Sensing and Control
KAGRA
03 Jul 2019
T1910352-v6 On the effect of arm cavity finesse asymmetry to O3 sensitivity Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
25 Jun 2019
G1910211-v3 Topics on Commissioning of KAGRA Yutaro Enomoto Modulation
GWADW
KAGRA
Interferometer Sensing and Control
22 May 2019
T1909661-v0 Harmonic Generator Modification Plan Yutaro Enomoto et al. Circuits
Modulation
Interferometer Sensing and Control
KAGRA
06 Feb 2019
T1707586-v12 List of RF Cables to Purchase for bKAGRA Yutaro Enomoto et al. Circuits
KAGRA
Interferometer Sensing and Control
31 Jan 2019
T1909573-v2 Definitions for the DRMI commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
23 Jan 2019
T1707038-v9 Latest estimated sensitivity of KAGRA (v201708) *APPROVED* Yutaro Enomoto et al. KSC
Interferometer Sensing and Control
KAGRA
07 Jan 2019
G1808838-v2 Background image for ALS_OVERVIEW medm screen Yutaro Enomoto KAGRA
Interferometer Sensing and Control
13 Nov 2018
T1809210-v2 Request for circuit: Common Mode Servo Board Yutaro Enomoto et al. KAGRA
Interferometer
MC
Modulation
Circuits
29 Oct 2018
L1808444-v1 Memo on delivery of IR/GR beams Yutaro Enomoto Interferometer
KAGRA
04 Jul 2018
G1808441-v1 Thoughts on daily alignment procedure Yutaro Enomoto et al. Alignment Sensing and control
KAGRA
03 Jul 2018
G1808357-v2 ALS用ファイバーの位相雑音測定 Yutaro Enomoto KAGRA
Length Sensing and Control
12 Jun 2018
T1808343-v2 Definitions for the X arm commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
10 Jun 2018
G1808217-v7 KAGRA: Status and Near Term Plans Yutaro Enomoto et al. GWADW
KAGRA
17 May 2018
T1808243-v1 Note on filter cavity part of KAGRA+ sensitivity calculation code Yutaro Enomoto Interferometer Sensing and Control
KAGRA
Length Sensing and Control
16 May 2018
T1808172-v9 O3 Estimated Sensivitiy for FPMI, PRFPMI and RSE Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
02 May 2018
D1808129-v4 bKAGRA phase 1 LSC cabling Yutaro Enomoto et al. Length Sensing and Control
Interferometer Sensing and Control
KAGRA
01 May 2018
G1807857-v1 Proposal for organizing the VIS measurements Yutaro Enomoto et al. Others
Suspensions
System Engineering
Seismic Isolation
Organization
KAGRA
14 Feb 2018
L1807726-v1 ALS: where to add offset Yutaro Enomoto KAGRA
Length Sensing and Control
29 Jan 2018
T1707334-v5 Main Interferometer Configuration for Early Phase of bKAGRA Yutaro Enomoto et al. KAGRA
Interferometer
06 Dec 2017
T1706748-v5 Re-considering bKAGRA EOM layout Yutaro Enomoto Interferometer Sensing and Control
KAGRA
Modulation
02 Jun 2017
G1706485-v13 Possible KAGRA Upgrades Yutaro Enomoto et al. GWADW
KAGRA
09 May 2017
T1605362-v4 bKAGRA phase1のPRMIとそのASCについて Yutaro Enomoto KAGRA
Alignment Sensing and control
01 Sep 2016

Number of documents found: 32

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.60 usr + 0.08 sys = 0.68 CPU)