| G2214165-v7 |
purpose_of_PAB2022 |
Masatake Ohashi |
KAGRA
Detector
PAB
|
06 Jul 2022 |
| L2113224-v2 |
Minutes for External Review for KAGRA Interferometer Alignment Controls |
Haoyu Wang et al. |
External Review
KAGRA
Alignment Sensing and control
|
26 Aug 2021 |
| G2113198-v4 |
External Review for KAGRA Interferometer Alignment Controls |
Yuta Michimura |
Interferometer
External Review
KAGRA
|
24 Aug 2021 |
| G2113188-v5 |
Improvement of Type-A tower |
Yoichi Aso et al. |
KAGRA
External Review
Seismic Isolation
|
16 Aug 2021 |
| G2113118-v2 |
Slides for KGAR external review |
Nobuhiro Kimura |
External Review
KAGRA
Cryogenic
|
20 Jul 2021 |
| G2012099-v1 |
VIS upgrade plan toward O4 |
Ayaka Shoda et al. |
Seismic Isolation
PAB
KAGRA
|
03 Oct 2020 |
| G1910190-v14 |
O3 simulation (N=2, 3, 4 cases) |
Sadakazu Haino |
KAGRA
External Review
Data Analysis
|
21 Jun 2019 |
| G1808501-v3 |
IOO report for PAB 2018/07/26 |
Keiko Kokeyama |
PAB
KAGRA
|
16 Oct 2018 |
| L1707441-v2 |
Report of the ISS review on Nov. 21, 2017 |
Yoichi Aso et al. |
Reviews
Laser
|
22 Nov 2017 |
| G1503843-v1 |
Control system and DAQ system using Real time computers and Analog electronics |
Osamu Miyakawa |
PAB
Digital Control
KAGRA
Circuits
|
17 Jul 2015 |
| G1503759-v4 |
Cryogenic Payload/Cryogenics |
Kazuhiro Yamamoto |
KAGRA
Cryogenic
External Review
|
01 Jul 2015 |
| G1503737-v6 |
Vibration Isolation System for KAGRA |
Ryutaro Takahashi |
KAGRA
Seismic Isolation
External Review
|
30 Jun 2015 |
| G1503753-v1 |
Goal and target sensitivity of bKAGRA |
Kentaro Somiya |
External Review
|
29 Jun 2015 |
| G1503747-v2 |
Installation Plan of VIS |
Ryutaro Takahashi |
Seismic Isolation
External Review
KAGRA
|
29 Jun 2015 |
| G1503735-v1 |
Control and tuning of suspension |
Takanori Sekiguchi |
External Review
Suspensions
Seismic Isolation
KAGRA
|
26 Jun 2015 |
| G1402356-v1 |
Report of cryogenic payload for PAB 20140423 |
Toshikazu Suzuki |
Reviews
Cryogenic
KAGRA
|
22 Apr 2014 |
| G1402312-v6 |
Status of KAGRA detector characterization |
Kazuhiro Hayama |
Data Analysis
Interferometer
KAGRA
Reviews
|
03 Apr 2014 |
| G1402279-v2 |
KAGRA 3rd External review for Analog ELectronics subgroup |
Osamu Miyakawa |
Reviews
Circuits
KAGRA
|
01 Apr 2014 |
| G1402278-v3 |
KAGRA 3rd External review for DiGital System subgroup |
Osamu Miyakawa |
Digital Control
Reviews
KAGRA
|
01 Apr 2014 |
| T1200947-v2 |
External review (KAGRA detector characterization) on April 2012 |
Kazuhiro Hayama |
KAGRA
Reviews
Data Analysis
|
17 Jan 2014 |
| G1201425-v2 |
KAGRAに関する宇宙線研共同研究 |
Kazuaki Kuroda |
Detector
Reviews
KAGRA
|
12 Dec 2012 |
| T1200929-v2 |
External review document for vibration isolation subsystem |
Ryutaro Takahashi |
Seismic Isolation
KAGRA
Reviews
|
26 Nov 2012 |
| G1201287-v5 |
DGS and DAS for the external review |
Masaki Ando |
Reviews
|
25 Sep 2012 |
| G1201288-v3 |
Answers for 2nd External Reviewers (CRY) |
Kazuhiro Yamamoto |
Reviews
Cryogenic
KAGRA
|
25 Sep 2012 |
| G1201196-v1 |
Internal and External Reviews |
Seiji Kawamura |
Reviews
KAGRA
System Engineering
|
15 Sep 2012 |
| G1201009-v1 |
Main Interferometer External Review 2012 |
Yoichi Aso |
Interferometer
KAGRA
Reviews
|
18 Apr 2012 |
| G1201002-v1 |
KAGRA Cryogenics |
Toshikazu Suzuki |
Reviews
Cryogenic
KAGRA
|
18 Apr 2012 |
| G1200954-v4 |
KAGRA external review (Cryogenic payload) on April 2012 |
Kazuhiro Yamamoto |
Reviews
KAGRA
Cryogenic
|
17 Apr 2012 |
| G1200989-v1 |
KAGRA 2nd External review for digital system subgroup |
Osamu Miyakawa |
Digital Control
KAGRA
Reviews
|
17 Apr 2012 |
| G1200988-v1 |
Vacuum (external review on April 2012) |
Yoshio Saito |
KAGRA
Reviews
Vacuum
|
17 Apr 2012 |
| G1200970-v1 |
External review |
Seiji Kawamura |
KAGRA
Reviews
|
16 Apr 2012 |
| G1200958-v1 |
Seismic attenuation chains concept, design and advancement status |
Riccardo DeSalvo |
Seismic Isolation
Reviews
KAGRA
|
16 Apr 2012 |
| T1200946-v1 |
External review (KAGRA Cryogenics) on April 2012 |
Toshikazu Suzuki |
Reviews
KAGRA
Cryogenic
|
09 Apr 2012 |
| T1200921-v2 |
External Review Document of KAGRA Main Interferometer |
Yoichi Aso |
Interferometer
KAGRA
Reviews
|
09 Apr 2012 |
| T1200931-v4 |
Transport features of the KAGRA type-B seismic attenuation chains and vacuum tanks. |
Riccardo DeSalvo |
Seismic Isolation
Reviews
KAGRA
|
30 Mar 2012 |
| T1200910-v3 |
Document of Digital System Subgroup for 2nd External Review |
Osamu Miyakawa |
KAGRA
Reviews
Digital Control
|
21 Mar 2012 |
| G1200792-v2 |
Internal Review for Digital system subgroup |
Osamu Miyakawa |
KAGRA
Reviews
Digital Control
|
13 Mar 2012 |
| G1200886-v2 |
Construction status and plan-2 |
Masaki Ando |
Reviews
KAGRA
|
22 Feb 2012 |
| G1200885-v1 |
What should be improved in the KAGRA construction? |
Seiji Kawamura |
KAGRA
Reviews
|
20 Feb 2012 |
| G1200807-v3 |
Internal review of detector characterization |
Kazuhiro Hayama |
KAGRA
Reviews
Data Acquisition
|
09 Feb 2012 |
| G1200814-v1 |
KAGRA Cryogenics |
Toshikazu Suzuki |
Reviews
KAGRA
Cryogenic
|
30 Jan 2012 |
| G1200810-v4 |
LCGT internal review (Cryogenic payload) |
Kazuhiro Yamamoto |
Reviews
Cryogenic
KAGRA
|
29 Jan 2012 |
| G1200809-v1 |
MIF Internal Review 2012/1/27 |
Yoichi Aso |
Interferometer
KAGRA
Reviews
Interferometer Sensing and Control
|
26 Jan 2012 |
| G1200784-v3 |
LCGT vacuum system (internal review on 23rd of Jan. 2012) |
Yoshio Saito |
Vacuum
Reviews
KAGRA
|
25 Jan 2012 |
| M1200801-v1 |
Internal Review IOO on 24th Jan. 2012 |
Souichi Telada |
Reviews
KAGRA
MC
|
24 Jan 2012 |
| T1100758-v21 |
Report on detector characterization |
Kazuhiro Hayama |
KAGRA
Reviews
|
23 Jan 2012 |
| T0100798-v2 |
vacuum2001 |
Yoshio Saito |
Reviews
KAGRA
Vacuum
|
23 Jan 2012 |
| G1200796-v1 |
3D design for LCGT |
Utako Iwasaki |
Vacuum
Reviews
KAGRA
|
23 Jan 2012 |
| G1100484-v2 |
LCGT Interferometer at PAB |
Masaki Ando |
Interferometer
KAGRA
Reviews
|
18 Jun 2011 |
| G1100390-v1 |
R&D of CLIO |
Takashi Uchiyama |
Reviews
CLIO
Cryogenic
GWADW
|
02 Mar 2011 |
| G1100388-v2 |
Review document for Digital subgroup |
Osamu Miyakawa |
Digital Control
Reviews
KAGRA
|
02 Mar 2011 |
| G1100385-v1 |
LCGT - SAS development status |
Riccardo DeSalvo |
KAGRA
Reviews
Seismic Isolation
|
02 Mar 2011 |
| G1100379-v3 |
Main Interferometer Subsystem Type B Review |
Yoichi Aso |
Length Sensing and Control
Interferometer
Alignment Sensing and control
KAGRA
Reviews
Interferometer Sensing and Control
|
28 Feb 2011 |
| T1100363-v1 |
LCGT Main Interferometer Design |
Yoichi Aso |
KAGRA
Alignment Sensing and control
Reviews
Interferometer Sensing and Control
Length Sensing and Control
Interferometer
Optics
|
21 Feb 2011 |
| T1100359-v2 |
External review for digital system |
Osamu Miyakawa |
Reviews
KAGRA
Digital Control
|
21 Feb 2011 |
| G1000283-v1 |
A-Review of vibration isolation system 2 |
Riccardo DeSalvo et al. |
Seismic Isolation
Reviews
KAGRA
|
20 Dec 2010 |
| G1000268-v1 |
LCGT ISC Review 2010/12/7 |
Yoichi Aso |
Reviews
Interferometer Sensing and Control
KAGRA
Length Sensing and Control
|
07 Dec 2010 |
| G1000257-v1 |
A-Review of vibration isolation system |
Riccardo DeSalvo et al. |
Seismic Isolation
KAGRA
Reviews
|
29 Nov 2010 |
| G1000235-v2 |
Review A for digital system subgroup |
Osamu Miyakawa |
Reviews
KAGRA
Digital Control
|
06 Nov 2010 |
| T1000209-v2 |
デジタルシステムの各サブグループへの配布 |
Osamu Miyakawa |
Digital Control
KAGRA
Reviews
|
28 Oct 2010 |
| T1000208-v2 |
LCGT digital system -システム全体- |
Osamu Miyakawa |
Digital Control
Reviews
KAGRA
|
28 Oct 2010 |
| G1000069-v3 |
PLUS-2009年度の活動状況 |
Masaki Ando et al. |
KAGRA meeting
Seismic Isolation
Interferometer
Optics
Auxiliary IFO
CLIO meeting
Suspensions
Laser
TAMA
Reviews
Infrastructure
CLIO
Interferometer Sensing and Control
R&D
Cryogenic
KAGRA
|
25 Feb 2010 |
| T1000065-v1 |
Study report on LCGT interferometer observation band |
collaboration LCGT |
Policies
KAGRA
Executive Office
Reviews
Management
Detector
|
06 Feb 2010 |