| T2112858-v4 |
Final design and implementation of the KAGRA green lock system |
Kiwamu Izumi |
KAGRA
Length Sensing and Control
Interferometer
Interferometer Sensing and Control
|
04 Oct 2021 |
| E1807769-v0 |
Document Tree for Arm Length Stabilization System |
Kiwamu Izumi et al. |
Interferometer Sensing and Control
KAGRA
|
30 Jun 2021 |
| E2113026-v1 |
Test report for the phase frequency discriminator unit |
Kiwamu Izumi et al. |
Length Sensing and Control
KAGRA
Alignment Sensing and control
Interferometer Sensing and Control
|
23 Jun 2021 |
| D1808394-v14 |
ISC system circuit diagram (old title: ALS system circuit diagram) |
Kiwamu Izumi et al. |
KAGRA
Interferometer Sensing and Control
|
03 May 2021 |
| T1910582-v1 |
Mode matching without PRM |
Kiwamu Izumi |
Interferometer Sensing and Control
Optics
Interferometer
KAGRA
|
25 Aug 2019 |
| D1909844-v3 |
Rack design schematic for OMC1 |
Yutaro Enomoto et al. |
KAGRA
Calibration
System Engineering
Length Sensing and Control
Data Acquisition
Interferometer
Digital Control
Circuits
Alignment Sensing and control
Interferometer Sensing and Control
|
10 Jul 2019 |
| D1808696-v6 |
Rack design schematic for ALSs 0 and 1 |
Kiwamu Izumi |
Interferometer Sensing and Control
KAGRA
|
10 Jul 2019 |
| T1909661-v0 |
Harmonic Generator Modification Plan |
Yutaro Enomoto et al. |
Circuits
Interferometer Sensing and Control
Modulation
KAGRA
|
06 Feb 2019 |
| G1909593-v2 |
Commissioning Status of KAGRA (talk for KIW5) |
Kiwamu Izumi |
Alignment Sensing and control
Interferometer Sensing and Control
Digital Control
Workshop
Length Sensing and Control
Suspensions
KAGRA
|
14 Feb 2019 |
| T1809211-v12 |
EOM RF Amplifier Plan |
Kiwamu Izumi et al. |
Circuits
KAGRA
Modulation
|
07 Feb 2019 |
| T1707586-v12 |
List of RF Cables to Purchase for bKAGRA |
Yutaro Enomoto et al. |
KAGRA
Interferometer Sensing and Control
Circuits
|
31 Jan 2019 |
| T1909573-v2 |
Definitions for the DRMI commissioning |
Yutaro Enomoto et al. |
KAGRA
Interferometer Sensing and Control
|
23 Jan 2019 |
| T1808750-v1 |
[confidential] Data sheets for the green fibers for the ALS |
Kiwamu Izumi |
KAGRA
Interferometer Sensing and Control
|
21 Aug 2018 |
| E1808724-v1 |
A list of MIF electronics |
Kiwamu Izumi |
KAGRA
Interferometer Sensing and Control
|
20 Aug 2018 |
| G1808706-v1 |
Estimation of the cable length from PSL to ALS rack |
Kiwamu Izumi |
Interferometer Sensing and Control
KAGRA
|
15 Aug 2018 |
| T1808460-v2 |
Estimation of clipping losses in a Fabry-Perot cavity |
Kiwamu Izumi |
KAGRA
Interferometer Sensing and Control
|
07 Aug 2018 |
| G1808463-v1 |
Chief meeting material: ALS schedule |
Kiwamu Izumi |
KAGRA
KAGRA meeting
Scheduling
Interferometer Sensing and Control
|
06 Jul 2018 |
| G1808441-v1 |
Thoughts on daily alignment procedure |
Yutaro Enomoto et al. |
Alignment Sensing and control
KAGRA
|
03 Jul 2018 |
| T1808397-v1 |
Request for modifying the satellite amplifier boards |
Kiwamu Izumi |
Suspensions
KAGRA
Seismic Isolation
|
19 Jun 2018 |
| G1808352-v2 |
Proposal for modification of the satellite box |
Kiwamu Izumi |
Interferometer Sensing and Control
Seismic Isolation
KAGRA
Cryogenic
|
15 Jun 2018 |
| T1808388-v1 |
Notes on capacitor precision for satellite amplifier board |
Kiwamu Izumi |
Cryogenic
KAGRA
Suspensions
Seismic Isolation
Interferometer Sensing and Control
Circuits
|
15 Jun 2018 |
| G1808369-v1 |
Material for subgroup briefing 2018; toward observing runs |
Kiwamu Izumi |
Others
Seminar
KAGRA
|
13 Jun 2018 |
| T1808343-v2 |
Definitions for the X arm commissioning |
Yutaro Enomoto et al. |
Interferometer Sensing and Control
KAGRA
|
10 Jun 2018 |
| G1808317-v1 |
Material for Extended Chief meeting: Thoughts on inviting foreign experts |
Kiwamu Izumi |
Chief meeting
KAGRA
|
28 May 2018 |
| G1808254-v3 |
Commissioning of bKAGRA phase-I : Details |
Kiwamu Izumi |
Interferometer Sensing and Control
KAGRA F2F
KAGRA
|
23 May 2018 |
| G1808253-v1 |
Introduction of Institute of Space and Astronautical Science (ISAS) |
Kiwamu Izumi |
KAGRA F2F
|
17 May 2018 |
| G1808217-v7 |
KAGRA: Status and Near Term Plans |
Yutaro Enomoto et al. |
KAGRA
GWADW
|
17 May 2018 |
| D1808129-v4 |
bKAGRA phase 1 LSC cabling |
Yutaro Enomoto et al. |
KAGRA
Interferometer Sensing and Control
Length Sensing and Control
|
01 May 2018 |
| T1808093-v1 |
Measuring the Schnupp asymmetry in a simple Michelson interferometer |
Kiwamu Izumi et al. |
KAGRA
Interferometer Sensing and Control
Interferometer
Length Sensing and Control
|
20 Mar 2018 |
| G1807857-v1 |
Proposal for organizing the VIS measurements |
Yutaro Enomoto et al. |
KAGRA
Suspensions
System Engineering
Others
Seismic Isolation
Organization
|
14 Feb 2018 |
| G1807772-v1 |
Material for the commissioning meeting on Feb 6 |
Kiwamu Izumi |
Interferometer
Alignment Sensing and control
Seismic Isolation
KAGRA
Suspensions
|
06 Feb 2018 |
| T1807770-v1 |
Systematic error in an optical lever due to air/vacuum refractive index |
Kiwamu Izumi |
Interferometer
Alignment Sensing and control
KAGRA
Optics
Suspensions
|
03 Feb 2018 |
| T1807753-v1 |
Minutes of ALS meeting (2018.Jan.30) |
Kohei Doi et al. |
Interferometer Sensing and Control
Interferometer
Length Sensing and Control
KAGRA
|
31 Jan 2018 |
| E1807703-v1 |
Proposal for updating the test mass realtime control library |
Kiwamu Izumi |
Suspensions
KAGRA
Digital Control
Seismic Isolation
Interferometer
|
24 Jan 2018 |
| G1807659-v2 |
Summary of the beam position measurement |
Kiwamu Izumi |
Vacuum
Interferometer
Optics
KAGRA
|
16 Jan 2018 |
| G1807653-v1 |
Proposal for changing the BS real time model for hierarchical optical lever control |
Kiwamu Izumi |
KAGRA
Interferometer
Alignment Sensing and control
|
15 Jan 2018 |
| T1807652-v1 |
Notes on the beam layout without the ITMs |
Kiwamu Izumi |
Interferometer
KAGRA
|
13 Jan 2018 |
| G1707573-v2 |
Material for beam centering brainstorm v2 |
Kiwamu Izumi |
Alignment Sensing and control
KAGRA
|
27 Dec 2017 |
| G1707572-v0 |
Material for beam centering brainstorm |
Kiwamu Izumi |
Alignment Sensing and control
KAGRA
|
27 Dec 2017 |
| T1707429-v2 |
Summary of the initial alignment closeout meeting |
Kiwamu Izumi |
Interferometer
KAGRA
|
16 Nov 2017 |
| G1707417-v1 |
Meeting material: initial alignment closeout meeting, setting the stage |
Kiwamu Izumi |
Interferometer
KAGRA
|
14 Nov 2017 |
| E1707416-v1 |
ALS meeting material (2017.Nov.13) |
Kohei Doi et al. |
KAGRA
Length Sensing and Control
|
14 Nov 2017 |
| G1707104-v3 |
Selected Commissioning Topics |
Kiwamu Izumi |
Digital Control
Interferometer Sensing and Control
Alignment Sensing and control
Interferometer
Length Sensing and Control
Optics
Other Groups
KAGRA F2F
|
30 Aug 2017 |
| T1201121-v2 |
Response from cavity displacements to transmitted light frequency |
Kiwamu Izumi |
KAGRA
Laser
Interferometer
|
20 Apr 2017 |
| G1706301-v1 |
重力波検出器KAGRAのための高出力レーザー光源の高度化 |
Kiwamu Izumi |
Other Groups
|
03 Mar 2017 |
| G1706299-v1 |
遺伝的アルゴリズムを用いた波面補正によるビーム品質改善法の研究 |
Kiwamu Izumi |
Other Groups
|
02 Mar 2017 |
| G1706298-v1 |
Photothermal Common-path Interferometryを用いたMoth eye構造の吸収率測定 |
Kiwamu Izumi |
Management
Detector
Other Groups
|
02 Mar 2017 |
| G1706264-v1 |
J-GEM: Japanese GW-EM Follow-up Group in Optical, Near-Infrared, and Radio Wavelengths |
Kiwamu Izumi |
Other Groups
|
17 Feb 2017 |
| G1706103-v2 |
地上望遠鏡による太陽系外惑星 撮像観測のための極限補償光学系開発 |
Kiwamu Izumi |
Other Groups
|
17 Feb 2017 |
| G1706102-v1 |
絶対重力計の開発と最近の動向 |
Kiwamu Izumi |
Other Groups
|
27 Jan 2017 |
| G1301595-v6 |
研究交流会世話人会議資料 |
Kiwamu Izumi |
Seminar
|
02 Dec 2016 |
| T1301745-v2 |
重力波研究交流会世話人の仕事リスト |
Kiwamu Izumi |
Activity
Seminar
|
02 Dec 2016 |
| G1402839-v1 |
Loss Dependence on Beam Position in the Arm Cavities of aLIGO |
Kiwamu Izumi |
Seminar
|
10 Oct 2014 |
| G1402548-v2 |
全地球測位システム(GPS)の 重力波観測への応用とその先の展望 |
Kiwamu Izumi |
Other Groups
Seminar
Detector
|
03 Aug 2014 |
| G1301895-v1 |
LIGOハンフォード観測所での片腕共振器実験報告 |
Kiwamu Izumi |
Other Groups
|
11 Oct 2013 |
| M1101594-v1 |
重力波研究交流会引き継ぎのお願い |
Kiwamu Izumi |
Others
|
01 Apr 2013 |
| T1201358-v1 |
Insrtuctions on how to build a realtime model on the TAMA Linux machines |
Kiwamu Izumi |
KAGRA
Digital Control
|
26 Oct 2012 |
| G1201046-v1 |
グリーンロック実験報告 |
Kiwamu Izumi |
Other Groups
Length Sensing and Control
Seminar
|
25 May 2012 |
| G1100398-v1 |
Arm Length Stabilization at the 40m prototype |
Kiwamu Izumi |
R&D
Others
Length Sensing and Control
|
19 Mar 2011 |
| G1000081-v2 |
低温レーザー干渉計CLIO(28)デジタルシステムの導入III |
Koji Arai et al. |
JPS
CLIO
Digital Control
|
22 Mar 2010 |