| T1503729-v4 |
SUMCON 1.5.0: Suspension Modeling Constructor in Mathematica |
Perry Forsyth et al. |
Seismic Isolation
Suspensions
KAGRA
|
07 Mar 2024 |
| G1605201-v0 |
iKAGRAの教訓 MIFの視点から |
Yuta Michimura |
Chief meeting
Suspensions
Interferometer
System Engineering
KAGRA
Scheduling
Safety
|
17 May 2016 |
| P2214296-v3 |
Optimizing Active Vibration Isolation Systems in Ground-Based Interferometric Gravitational-Wave detectors |
Tak Lun Terrence Tsang |
KAGRA
Seismic Isolation
Suspensions
Thesis
|
30 Sep 2022 |
| P2213991-v2 |
Optimal sensor fusion method for active vibration isolation systems in ground-based gravitational-wave detectors |
Tak Lun Terrence Tsang |
Suspensions
Seismic Isolation
Paper
KAGRA
|
08 Aug 2022 |
| D1503615-v2 |
PR3 Suspension Cabling (bKAGRA) |
Mark Barton |
KAGRA
Suspensions
|
25 May 2022 |
| D1503614-v4 |
PR2 Suspension Cabling |
Mark Barton |
KAGRA
Suspensions
|
25 May 2022 |
| G2112918-v3 |
[Amaldi14] Optimal Sensor Fusion using H-infinity Methods - Synthesizing Complementary Filters for Active Seismic Noise Isolation Systems in KAGRA |
Tak Lun Terrence Tsang |
KAGRA
Suspensions
Seismic Isolation
|
16 Nov 2021 |
| G2113243-v2 |
[KAGRA 27th F2F poster] Optimal Sensor Fusion using H-infinity Synthesis |
Tak Lun Terrence Tsang |
KAGRA
KAGRA F2F
Seismic Isolation
Suspensions
|
27 Aug 2021 |
| S1808744-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
Suspensions
KAGRA
|
02 Aug 2021 |
| S1808743-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
Suspensions
KAGRA
|
02 Aug 2021 |
| S1808742-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
KAGRA
Suspensions
|
30 Jun 2021 |
| S1808145-v0 |
Newfocus8742 picomotor driver |
Kouseki Miyo |
Suspensions
KAGRA
|
18 Jun 2021 |
| S1808144-v0 |
Newfocus8742 picomotor driver |
Kouseki Miyo |
Suspensions
KAGRA
|
18 Jun 2021 |
| G1706740-v4 |
Introduction to VIS |
Ayaka Shoda |
Seismic Isolation
Suspensions
KAGRA
|
27 May 2021 |
| E1605111-v1 |
BS Suspension Electronic Items List |
Mark Barton |
Suspensions
Circuits
KAGRA
Data Acquisition
|
18 May 2021 |
| T1808963-v2 |
Diagonalization of Optical Lever signals for Type B suspensions |
Tak Lun Terrence Tsang |
Seismic Isolation
Suspensions
KAGRA
|
03 May 2021 |
| G1910095-v2 |
Type B local control systems and displacement sensing of the suspended optic - 22nd F2F |
Tak Lun Terrence Tsang |
KAGRA F2F
KAGRA
Suspensions
|
03 May 2021 |
| T1910189-v3 |
BS and SR TM optical lever (oplev) diagonalization matrix |
Tak Lun Terrence Tsang |
Suspensions
KAGRA
|
03 May 2021 |
| G2011889-v4 |
Optimal Control and Optimization for KAGRA Vibration Isolation system |
Tak Lun Terrence Tsang |
Suspensions
KAGRA
Management
|
04 Sep 2020 |
| T2011755-v10 |
Estimated sensitivity for auxiliary degrees of freedom of the KAGRA interferometer |
Yuta Michimura et al. |
KAGRA
Interferometer
Suspensions
Interferometer Sensing and Control
|
12 Aug 2020 |
| T2011764-v4 |
Kontrol: KAGRA Control Python Library for VIS Control Systems |
Tak Lun Terrence Tsang |
Suspensions
Management
KAGRA
|
20 Jun 2020 |
| P1911137-v6 |
[Thesis] Fast localization of coalescing binaries with gravitational wave detectors and low frequency vibration isolation for KAGRA |
Yoshinori Fujii |
Suspensions
Thesis
Seismic Isolation
KAGRA
|
05 May 2020 |
| T2011661-v3 |
Actuator modification for cryopayload |
Yuta Michimura |
Interferometer Sensing and Control
Cryogenic
Suspensions
KAGRA
|
27 May 2020 |
| D1605823-v5 |
IMMT2 modification |
Naoko Ohishi |
KAGRA
Suspensions
Chief meeting
|
21 May 2020 |
| T2011622-v1 |
Frequency Dependent Diagonalization Matrices of Payload Actuation for Local Feedback Control |
Tak Lun Terrence Tsang |
KAGRA
Management
Suspensions
|
18 Apr 2020 |
| G1911084-v2 |
[F2F] Performance test of local control for KAGRA Type-A suspension |
Yoshinori Fujii |
KAGRA F2F
KAGRA
Suspensions
Seismic Isolation
|
05 Dec 2019 |
| G1911004-v1 |
Adaptive Robust Control Systems for KAGRA Vibration Isolation System |
Tak Lun Terrence Tsang |
Management
KAGRA
Suspensions
|
22 Nov 2019 |
| G1910809-v2 |
KAGRA腕共振器鏡のための9段防振懸架システムの制御 |
Koki Okutomi |
Seismic Isolation
Suspensions
KAGRA
JPS
|
17 Sep 2019 |
| G1910300-v3 |
大型低温重力波望遠鏡KAGRA における防振装置のための制御系の開発II |
Yoshinori Fujii |
KAGRA
Suspensions
Seismic Isolation
|
11 Sep 2019 |
| G1910793-v1 |
Vibration Isolation System for the Cryogenic Mirrors in KAGRA |
Koki Okutomi |
Suspensions
Seismic Isolation
KAGRA
Conference
|
08 Sep 2019 |
| D1402555-v5 |
Drawing of fishing rod for working-point tuning of GAS filter |
Takanori Sekiguchi |
KAGRA
Suspensions
Seismic Isolation
|
05 Sep 2019 |
| G1910552-v2 |
VIS tools for commissioning |
Ayaka Shoda |
KAGRA
KAGRA F2F
Seismic Isolation
Suspensions
|
20 Aug 2019 |
| E1706046-v0 |
SR3 Suspension Electronic Items List |
Enzo Tapia |
Circuits
Suspensions
KAGRA
Data Acquisition
|
08 Aug 2019 |
| G1910445-v1 |
Commissioning and performance of the Signal Recycling suspensions of KAGRA |
Enzo Tapia |
Workshop
KAGRA
Suspensions
|
16 Jul 2019 |
| G1910406-v1 |
[Amaldi13] Controls for Type-A seismic attenuation system for KAGRA |
Yoshinori Fujii |
Suspensions
Seismic Isolation
KAGRA
|
05 Jul 2019 |
| G1910319-v2 |
Vibration Isolation System for the Cryogenic Test Masses in KAGRA |
Koki Okutomi |
Suspensions
Seismic Isolation
Workshop
KAGRA
|
24 Jun 2019 |
| G1910343-v1 |
Stutas on ITMY-tower part for chief meeiting 20190617 |
Yoshinori Fujii |
KAGRA
Suspensions
|
17 Jun 2019 |
| D1503600-v16 |
Type B Suspension Cabling |
Mark Barton et al. |
KAGRA
Suspensions
Circuits
|
16 Jun 2019 |
| E1605036-v0 |
VIS Document and Drawing Tree (SR) |
Mark Barton |
KAGRA
Suspensions
|
11 May 2019 |
| T1910142-v2 |
Noise and range calculations for using High Power Coil Driver for the test mass stage of cryopayload |
Yuta Michimura |
Interferometer Sensing and Control
Suspensions
KAGRA
|
24 Apr 2019 |
| G1910097-v1 |
Commissioning of The typeA suspension control: tower part |
Trozzo Lucia |
Suspensions
KAGRA
KAGRA F2F
|
19 Apr 2019 |
| E1504006-v0 |
VIS Document and Drawing Tree (Type-B) |
Keiko Kokeyama |
Management
KAGRA
Suspensions
|
12 Apr 2019 |
| G1809265-v3 |
Commissioning and performance of the beam splitter and signal recycling suspensions for the KAGRA gravitational wave detector. |
Enzo Tapia |
Suspensions
JPS
KAGRA
|
22 Mar 2019 |
| E1706047-v0 |
SRM Suspension Electronic Items List |
Mark Barton |
Data Acquisition
KAGRA
Suspensions
Circuits
|
20 Mar 2019 |
| G1909373-v3 |
大型低温重力波望遠鏡KAGRA における防振装置のための制御系の開発 |
Yoshinori Fujii |
Suspensions
Seismic Isolation
KAGRA
|
15 Mar 2019 |
| G1909831-v2 |
Characterization and commissioning of the SR suspensions of KAGRA |
Enzo Tapia |
Suspensions
Workshop
KAGRA
|
19 Feb 2019 |
| G1909832-v3 |
presentation in 5th KIW (Type B status and master thesis) |
Ryohei Kozu |
KAGRA
Workshop
Suspensions
|
16 Feb 2019 |
| G1605034-v3 |
SUMCON user's manual |
Yoshinori Fujii |
KAGRA
Suspensions
|
15 Feb 2019 |
| G1909624-v1 |
Status of KAGRA Type B Suspensions (KIW, 2019-02) |
Mark Barton et al. |
KAGRA
Suspensions
|
15 Feb 2019 |
| G1909825-v3 |
[Talk for 5thKIW] Status of Type-A suspensions for KAGRA |
Yoshinori Fujii |
Suspensions
Seismic Isolation
KAGRA
|
14 Feb 2019 |
| G1909593-v2 |
Commissioning Status of KAGRA (talk for KIW5) |
Kiwamu Izumi |
Length Sensing and Control
Workshop
KAGRA
Alignment Sensing and control
Interferometer Sensing and Control
Suspensions
Digital Control
|
14 Feb 2019 |
| E1605886-v0 |
SR2 Suspension Electronic Items List |
Mark Barton |
Circuits
Suspensions
Data Acquisition
KAGRA
|
05 Feb 2019 |
| P1809347-v9 |
[Thesis] Development of 13.5-meter-tall Vibration Isolation System for the Main Mirrors in KAGRA |
Koki Okutomi |
Suspensions
Thesis
Seismic Isolation
KAGRA
|
04 Feb 2019 |
| P1909567-v2 |
Master Thesis (Ryohei Kozu) |
Ryohei Kozu |
Suspensions
Thesis
Theory
|
31 Jan 2019 |
| G1809346-v2 |
[F2F] Development of 13.5-meter-tall Vibration Isolation System for the Main Mirrors in KAGRA |
Koki Okutomi |
KAGRA F2F
KAGRA
Suspensions
Seismic Isolation
|
06 Dec 2018 |
| G1809358-v1 |
Current status of OMMT/OSTM |
Naoko Ohishi |
Chief meeting
Suspensions
KAGRA
|
03 Dec 2018 |
| T1807588-v10 |
Assembly Procedure for WAB |
Simon Zeidler |
KAGRA
Others
Suspensions
|
30 Nov 2018 |
| T1707205-v6 |
BS Suspension Diagonalization Matrices |
Enzo Tapia |
Suspensions
KAGRA
|
27 Nov 2018 |
| T1807663-v3 |
SR Suspension Diagonalization Matrices |
Mark Barton |
Suspensions
KAGRA
|
27 Nov 2018 |
| G1809257-v1 |
OMMT/OSTM current status report |
Naoko Ohishi |
KAGRA
Suspensions
|
12 Nov 2018 |
| P1809044-v2 |
MultiSAS, a six degrees of freedom vibration isolation system for Advanced Virgo |
Kazuhiro Agatsuma et al. |
R&D
Paper
Suspensions
|
25 Sep 2018 |
| E1809013-v2 |
OMMT/OSTM schedule |
Naoko Ohishi |
Scheduling
KAGRA
Suspensions
|
18 Sep 2018 |
| G1809006-v1 |
JPS Presentation. Status of the Signal Recycling Mirror Suspensions of KAGRA. Enzo Tapia |
Enzo Tapia |
Suspensions
JPS
KAGRA
|
14 Sep 2018 |
| G1808307-v5 |
KAGRA腕共振器鏡のための13.5m防振懸架系の開発(II) |
Koki Okutomi |
Suspensions
Seismic Isolation
JPS
KAGRA
|
13 Sep 2018 |
| T1808916-v1 |
Notes of ETMX P/Y damping controls |
Yoshinori Fujii |
KAGRA
Suspensions
|
26 Aug 2018 |
| G1808835-v3 |
VIS Type B SUSs status report in F2F(Aug. 2018) |
Ryohei Kozu |
Suspensions
KAGRA
KAGRA F2F
|
25 Aug 2018 |
| G1808874-v1 |
Lecture 4_b: OPLEV setup for SRM suspensions. |
Enzo Tapia |
Seminar
Suspensions
KAGRA
|
24 Aug 2018 |
| G1808873-v1 |
Lecture 4: Use of OSEMs for VIS |
Enzo Tapia |
KAGRA
Seminar
Suspensions
|
24 Aug 2018 |
| E1808836-v3 |
SR3 Oplev setup, calibration and diagonalization |
Enzo Tapia |
KAGRA
Others
Suspensions
|
22 Aug 2018 |
| G1808717-v1 |
Lecture 3: Concepts of DSP (Digital Signal Processing) and use of DTT (diaggui) for TF measurements |
Enzo Tapia |
Suspensions
Seminar
KAGRA
|
18 Aug 2018 |
| G1808551-v2 |
Basic lecture for students 1: VIS Suspensions and digital system. |
Enzo Tapia |
Seminar
Suspensions
KAGRA
|
16 Aug 2018 |
| G1808697-v1 |
Basic lecture for students 2: GAS filters and LVDTs |
Enzo Tapia |
KAGRA
Seminar
Suspensions
|
16 Aug 2018 |
| D1808487-v2 |
OMMT/OSTM cabling |
Naoko Ohishi |
KAGRA
Suspensions
|
13 Jul 2018 |
| G1708423-v1 |
accelerometer properties for ITMX/ITMY |
Yoshinori Fujii et al. |
KAGRA
Seismic Isolation
Suspensions
|
28 Jun 2018 |
| E1707276-v0 |
VIS Document and Drawing Tree (Type-B Electronics) |
Mark Barton |
KAGRA
Suspensions
Circuits
|
21 Jun 2018 |
| T1808397-v1 |
Request for modifying the satellite amplifier boards |
Kiwamu Izumi |
KAGRA
Seismic Isolation
Suspensions
|
19 Jun 2018 |
| T1808388-v1 |
Notes on capacitor precision for satellite amplifier board |
Kiwamu Izumi |
Cryogenic
Interferometer Sensing and Control
Suspensions
Seismic Isolation
Circuits
KAGRA
|
15 Jun 2018 |
| E1707293-v0 |
VIS Document and Drawing Tree (SR3) |
Mark Barton |
Suspensions
KAGRA
|
20 May 2018 |
| G1708229-v1 |
ITMX-BFLVDT report |
Yoshinori Fujii |
KAGRA
Suspensions
|
11 May 2018 |
| G1808166-v1 |
Minimizing the mechanical cross-couplings in a KAGRA suspension system |
Ryohei Kozu |
KAGRA
Suspensions
|
17 Apr 2018 |
| T1808154-v3 |
Rough estimation of the effect of extra static magnetism of LIGO OSEM for OMMT suspension |
Naoko Ohishi |
KAGRA
Suspensions
|
13 Apr 2018 |
| P1707051-v2 |
Mirror actuation design for the interferometer control of the KAGRA gravitational wave telescope |
Yuta Michimura |
Length Sensing and Control
KAGRA
Suspensions
Seismic Isolation
|
12 Apr 2018 |
| G1808121-v1 |
GAS-blade assembly procedure |
Yoshinori Fujii |
KAGRA
Suspensions
|
30 Mar 2018 |
| G1808119-v1 |
How to tune the GAS-blade compression. |
Yoshinori Fujii |
KAGRA
Suspensions
|
26 Mar 2018 |
| G1808118-v0 |
GAS-blade tuning procedure |
Yasunori Fujii |
KAGRA
Suspensions
|
26 Mar 2018 |
| E1808045-v1 |
Geophone Pod Assembly Procedure |
Mark Barton et al. |
KAGRA
Circuits
Suspensions
|
25 Mar 2018 |
| G1707432-v5 |
KAGRA腕共振器鏡のための13.5 m防振懸架系の開発 |
Koki Okutomi |
Suspensions
Seismic Isolation
JPS
KAGRA
|
22 Mar 2018 |
| G1807682-v3 |
KAGRAにおけるPower Recycling鏡の防振懸架系システムの開発IV |
Yuya Arai |
KAGRA
JPS
Suspensions
|
22 Mar 2018 |
| E1706105-v0 |
Revised geophone cabling |
Mark Barton |
Suspensions
Circuits
KAGRA
|
30 Jan 2017 |
| P1807985-v1 |
Turn up the bass! Low-frequency performance improvement of seismic attenuation systems and vibration sensors for next generation gravitational wave detector |
Joris van Heijningen |
Suspensions
Thesis
KAGRA
|
05 Mar 2018 |
| E1807869-v0 |
Type B Boxes and Cards and Modules |
Mark Barton |
Circuits
Suspensions
KAGRA
|
21 Feb 2018 |
| G1807857-v1 |
Proposal for organizing the VIS measurements |
Yutaro Enomoto et al. |
System Engineering
KAGRA
Organization
Seismic Isolation
Suspensions
Others
|
14 Feb 2018 |
| G1807772-v1 |
Material for the commissioning meeting on Feb 6 |
Kiwamu Izumi |
KAGRA
Interferometer
Seismic Isolation
Suspensions
Alignment Sensing and control
|
06 Feb 2018 |
| T1807770-v1 |
Systematic error in an optical lever due to air/vacuum refractive index |
Kiwamu Izumi |
Optics
KAGRA
Interferometer
Suspensions
Alignment Sensing and control
|
03 Feb 2018 |
| D1503901-v2 |
In-Vacuum Cable Detail |
Mark Barton |
KAGRA
Suspensions
Circuits
|
10 Jun 2016 |
| T1807704-v1 |
Screw list for Type-C hanging jig |
Naoko Ohishi |
KAGRA
Suspensions
|
24 Jan 2018 |
| E1807703-v1 |
Proposal for updating the test mass realtime control library |
Kiwamu Izumi |
Suspensions
Digital Control
Seismic Isolation
KAGRA
Interferometer
|
24 Jan 2018 |
| E1807672-v9 |
Type-C suspension parts list |
Naoko Ohishi |
Suspensions
KAGRA
|
23 Jan 2018 |
| E1707294-v0 |
VIS Document and Drawing Tree (SR2) |
Mark Barton |
Suspensions
KAGRA
|
17 Jan 2018 |
| E1807666-v0 |
Type B Common Tasks |
Mark Barton |
KAGRA
Suspensions
|
16 Jan 2018 |
| E1707548-v0 |
SR Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
14 Jan 2018 |
| T1807651-v1 |
OMMT/OSTM_OSEM_test |
Hideaki Kitazawa |
KAGRA
Suspensions
|
12 Jan 2018 |
| T1707436-v0 |
SR Swap Plan |
Mark Barton |
KAGRA
Suspensions
|
21 Nov 2017 |
| G1707422-v1 |
Review of initial alignment from the point of view of Type-C |
Naoko Ohishi |
Suspensions
KAGRA
|
15 Nov 2017 |
| E1605505-v1 |
BS Gluing Procedure |
Mark Barton et al. |
Suspensions
KAGRA
Optics
|
09 Nov 2017 |
| E1707295-v0 |
VIS Document and Drawing Tree (SRM) |
Mark Barton |
Suspensions
KAGRA
|
13 Oct 2017 |
| G1707168-v4 |
大型低温重力波望遠鏡 KAGRA の防振系 |
Naoko Ohishi |
KAGRA
Conference
Suspensions
|
15 Sep 2017 |
| G1707169-v2 |
KAGRAにおけるPower Recycling鏡の防振懸架系システムの開発 III |
Ayaka Shoda |
Suspensions
Seismic Isolation
KAGRA
JPS
|
12 Sep 2017 |
| G1707173-v0 |
Status of the Type B optics suspensions for the KAGRA gravitational wave detector |
Mark Barton |
KAGRA
Suspensions
|
12 Sep 2017 |
| T1503941-v1 |
PR2/PR3/PRM First Contact Pattern |
Mark Barton |
KAGRA
Optics
Suspensions
|
03 Sep 2017 |
| G1707113-v0 |
Type B Installation Status, f2f Meeting, 2017-09-29 |
Mark Barton |
KAGRA
Suspensions
|
29 Aug 2017 |
| E1504235-v2 |
BS Installation Procedure |
Mark Barton |
KAGRA
Suspensions
|
13 Aug 2017 |
| D1707018-v1 |
BS First Contact Pattern |
Mark Barton |
Optics
KAGRA
Suspensions
|
30 Jul 2017 |
| G1706978-v1 |
Status of the Type B optics suspensions for the KAGRA gravitational wave detector (JPS Meeting, 9/2017) |
Mark Barton |
KAGRA
Suspensions
|
24 Jul 2017 |
| T1504459-v9 |
Magnetic noise calculation for BS (and ETM/ITM, PRM/SRM) |
Tomofumi Shimoda |
KAGRA
Suspensions
Interferometer Sensing and Control
|
02 Jul 2017 |
| G1706858-v1 |
Mechanical Q factor of bKAGRA-PR3 SAS |
Yoshinori Fujii |
Suspensions
KAGRA
|
28 Jun 2017 |
| G1706857-v1 |
Control Optimization for KAGRA VIS |
Koki Okutomi |
KAGRA
Seismic Isolation
Suspensions
|
28 Jun 2017 |
| G1706821-v1 |
大型低温重力波望遠鏡KAGRAの防振系 |
Naoko Ohishi |
KAGRA
Others
Suspensions
|
12 Jun 2017 |
| T1503453-v16 |
Actuator Noise Modeling Report |
Yuta Michimura |
KAGRA
Length Sensing and Control
Seismic Isolation
Suspensions
|
12 Jun 2017 |
| T1706786-v1 |
Type-C magnet fixture jig retrofit memo |
Naoko Ohishi |
Suspensions
Others
KAGRA
|
02 Jun 2017 |
| G1706746-v1 |
Control of the KAGRA cryogenic vibration isolation system |
Koki Okutomi |
KAGRA
GWADW
Suspensions
Seismic Isolation
|
20 May 2017 |
| G1706717-v1 |
Type B Installation Status, EC Meeting, 5/15/17 |
Mark Barton |
KAGRA
Suspensions
|
15 May 2017 |
| G1706384-v1 |
Type B Installation Status, f2f Meeting, 3/29/17 |
Mark Barton |
Suspensions
KAGRA
|
29 Mar 2017 |
| G1706285-v1 |
Quick manual for operating suspensions |
Yoshinori Fujii |
Seismic Isolation
Suspensions
KAGRA
|
11 Mar 2017 |
| T1706060-v17 |
Development of a low frequency vibration isolation system for KAGRA and study of the localization with a hierarchical network |
Yoshinori Fujii |
KAGRA
Data Analysis
Seismic Isolation
Suspensions
|
10 Mar 2017 |
| G1605876-v3 |
KAGRAにおける腕共振器鏡の低周波防振装置の開発 |
Koki Okutomi |
JPS
KAGRA
Suspensions
|
09 Mar 2017 |
| T1402512-v3 |
Operation manual about stepper motor driver TMCM-6110 |
Takanori Sekiguchi |
KAGRA
Suspensions
Seismic Isolation
|
03 Mar 2017 |
| G1706284-v1 |
Quick manual for suspension control modeling tools |
Yoshinori Fujii |
KAGRA
Seismic Isolation
Suspensions
|
24 Feb 2017 |
| T1706050-v2 |
Frequency responses of iKAGRA-PR3 SAS |
Yoshinori Fujii |
KAGRA
Suspensions
|
09 Jan 2017 |
| T1605996-v2 |
Active control system for type-Bp SAS |
Yoshinori Fujii |
KAGRA
Suspensions
Seismic Isolation
|
27 Dec 2016 |
| G1605970-v1 |
Type B Installation Status, Extended Chiefs Meeting, 12/19/16 |
Mark Barton |
Suspensions
KAGRA
|
19 Dec 2016 |
| E1605107-v1 |
Screw policy for vibration isolation system |
Fabian E Pena Arellano |
Suspensions
KAGRA
|
09 Dec 2016 |
| G1605917-v3 |
Development of PR SAS for KAGRA |
Yoshinori Fujii |
Suspensions
KAGRA
|
08 Dec 2016 |
| E1503830-v11 |
Procedure for hanging the test and recoil masses |
Fabian E Pena Arellano |
KAGRA
Suspensions
|
02 Dec 2016 |
| T1605741-v1 |
LISO manual (Japanese) |
Junko Kasuya |
KAGRA
Others
Suspensions
Seismic Isolation
|
13 Oct 2016 |
| G1605232-v7 |
KAGRAにおける腕共振器鏡の大型防振装置の開発 |
Koki Okutomi |
Suspensions
JPS
KAGRA
|
22 Sep 2016 |
| T1503239-v4 |
OSEM Coil/Magnet/Flag Calculation |
Mark Barton |
KAGRA
Suspensions
|
12 Sep 2016 |
| T1605630-v1 |
BS Rotation |
Mark Barton |
KAGRA
Suspensions
|
08 Sep 2016 |
| G1605560-v3 |
Status Report of Type-A SAS |
Koki Okutomi |
Suspensions
KAGRA
KAGRA F2F
|
25 Aug 2016 |
| G1605546-v1 |
Type B Installation Status, f2f Meeting, 8/25/16 |
Mark Barton |
KAGRA
Suspensions
|
25 Aug 2016 |
| E1504508-v0 |
VIS Document and Drawing Tree (Type-Bp Short) |
Mark Barton |
KAGRA
Management
Suspensions
|
02 Aug 2016 |
| T1605413-v0 |
BS/SR2 Rack Location |
Mark Barton |
Suspensions
Digital Control
Data Acquisition
KAGRA
|
29 Jul 2016 |
| T1605382-v1 |
Performance test of iKAGRA PR3 SAS |
Yoshinori Fujii |
KAGRA
Suspensions
|
15 Jul 2016 |
| E1605364-v1 |
Minutes of meeting about the safety net for Type-A installation |
Koki Okutomi |
KAGRA
Suspensions
|
11 Jul 2016 |
| G1605348-v2 |
Type B Installation Plan |
Mark Barton |
Suspensions
KAGRA
|
04 Jul 2016 |
| L1605334-v2 |
List of drivers for IMC, OFI, OMMT, OMC, OSM |
Yuta Michimura |
Suspensions
KAGRA
|
29 Jun 2016 |
| T1605316-v1 |
Mechanical Q factor of iKAGRA PR3 |
Yoshinori Fujii |
Suspensions
KAGRA
|
24 Jun 2016 |
| G1605149-v4 |
OSEM DoF coupling investigation |
Yoshinori Fujii |
Suspensions
KAGRA
|
24 Jun 2016 |
| T1504450-v7 |
BS Actuator Design (including design for SRs and PRs) |
Yuta Michimura |
KAGRA
KAGRA meeting
Circuits
Suspensions
Interferometer Sensing and Control
|
16 Jun 2016 |
| G1605271-v1 |
VIS meeting memo on 10th June, 2016 |
Yoshinori Fujii |
Suspensions
KAGRA
|
10 Jun 2016 |
| G1605262-v1 |
Monolithic accelerometer test updates |
Yoshinori Fujii |
Suspensions
KAGRA
|
03 Jun 2016 |
| G1605192-v2 |
Status report memo on monolithic accelerometer test |
Yoshinori Fujii |
KAGRA
Suspensions
|
15 May 2016 |
| G1605191-v1 |
Monthly report memo on April 2016 |
Yoshinori Fujii |
KAGRA
Suspensions
|
13 May 2016 |
| E1604817-v1 |
BS Payload Assembly Procedure |
Mark Barton et al. |
Suspensions
KAGRA
|
13 May 2016 |
| T1605101-v12 |
Summary of iKAGRA Test Run March 2016 |
Yuta Michimura |
Vacuum
Suspensions
Interferometer Sensing and Control
Chief meeting
Laser
KAGRA
MC
|
22 Apr 2016 |
| G1605152-v1 |
ATC meeting memo on 20160422 |
Yoshinori Fujii |
Suspensions
KAGRA
|
22 Apr 2016 |
| G1605128-v3 |
A draft of a pre-isolator installation procedure |
Yoshinori Fujii |
KAGRA
Suspensions
|
22 Apr 2016 |
| G1605148-v2 |
Seminar slide on monolithic accelerometer |
Joris van Heijningen |
Suspensions
KAGRA
|
21 Apr 2016 |
| G1605129-v2 |
ATC meeting memo on 8th Apr. |
Yoshinori Fujii |
Suspensions
KAGRA
|
16 Apr 2016 |
| T1605123-v1 |
BS Cleanbag Design |
Mark Barton |
Suspensions
KAGRA
|
13 Apr 2016 |
| G1605100-v2 |
Simulated suspension response |
Yoshinori Fujii |
KAGRA
Suspensions
|
12 Apr 2016 |
| T1605106-v0 |
Wire selection for the optic suspensions of Type B and Type Bp payloads |
Fabian E Pena Arellano |
KAGRA
Suspensions
|
08 Apr 2016 |
| G1605096-v1 |
VIS meeting memo |
Yoshinori Fujii |
Suspensions
KAGRA
|
01 Apr 2016 |
| E1605037-v1 |
BS Assembly Frame Requirements |
Mark Barton |
KAGRA
Suspensions
|
01 Apr 2016 |
| T1605033-v0 |
BS Flag Tips Issue |
Mark Barton |
Suspensions
KAGRA
|
25 Mar 2016 |
| G1604993-v3 |
KAGRA用防振装置の開発XVIII(制御系) |
Koki Okutomi |
Suspensions
KAGRA
JPS
|
21 Mar 2016 |
| G1504543-v6 |
KAGRA用防振装置の開発XVII (インストール) |
Yoshinori Fujii |
Suspensions
KAGRA
|
20 Mar 2016 |
| E1604966-v1 |
BS Mass Budget |
Mark Barton et al. |
Suspensions
KAGRA
|
10 Mar 2016 |
| D1604795-v2 |
PR3 Suspension Cabling - iKAGRA Configuration |
Mark Barton |
KAGRA
Suspensions
|
04 Mar 2016 |
| D1604939-v4 |
Spec sheet for D-Sub and D-Micro connectors as used for VIS in-vacuum cables |
Mark Barton |
Circuits
Suspensions
Vacuum
KAGRA
|
03 Mar 2016 |
| D1604938-v1 |
Spec sheet for Gore Cable as used for VIS in-vacuum signal cables |
Mark Barton |
Vacuum
Suspensions
Circuits
KAGRA
|
03 Mar 2016 |
| D1604936-v1 |
Spec sheet for MWS Cable as used for VIS in-vacuum motor cables |
Mark Barton |
KAGRA
Circuits
Suspensions
Vacuum
|
03 Mar 2016 |
| T1604911-v2 |
Suspension and the control model |
Yoshinori Fujii |
KAGRA
Suspensions
|
28 Feb 2016 |
| P1504155-v15 |
A Study of Low Frequency Vibration Isolation System for Large Scale Gravitational Wave Detectors |
Takanori Sekiguchi |
KAGRA
Suspensions
Thesis
Seismic Isolation
|
28 Feb 2016 |
| G91604910-v1 |
Modal test of PR inner frame |
Yoshinori Fujii |
KAGRA
Suspensions
|
26 Feb 2016 |
| T1604860-v1 |
SapphirePrism |
Akitoshi Ueda |
Suspensions
Quality Assurance
KAGRA
|
24 Feb 2016 |
| G1604843-v2 |
Type B Installation Status, f2f Meeting, 2/22/16 |
Mark Barton |
KAGRA
Suspensions
|
22 Feb 2016 |
| G1604824-v2 |
ATC meeting memo on 19th Feb. |
Yoshinori Fujii |
Suspensions
KAGRA
|
19 Feb 2016 |
| D1503619-v0 |
VIS Document and Drawing Tree - iKAGRA Cabling |
Mark Barton |
Suspensions
KAGRA
|
05 Feb 2016 |
| E1604779-v0 |
VIS Document and Drawing Tree (Type Bpp) |
Mark Barton |
Suspensions
KAGRA
|
31 Jan 2016 |
| E1604778-v0 |
VIS Document and Drawing Tree - bKAGRA |
Mark Barton |
KAGRA
Suspensions
|
31 Jan 2016 |
| E1604777-v0 |
VIS Document and Drawing Tree - iKAGRA |
Mark Barton |
Suspensions
KAGRA
|
31 Jan 2016 |
| G1604739-v4 |
大型重力波検出器のための低周波防振装置に関する研究 |
Takanori Sekiguchi |
Data Analysis
Suspensions
Seismic Isolation
|
30 Jan 2016 |
| G1604760-v4 |
TypeBp SAS Study |
Yoshinori Fujii |
KAGRA
Suspensions
|
28 Jan 2016 |
| G1604772-v1 |
KAGRA用防振装置の開発 XVIII(制御系) |
Koki Okutomi |
Seismic Isolation
Suspensions
JPS
KAGRA
|
27 Jan 2016 |
| G1504702-v1 |
Scheme for removing cracked prism on PR2 |
Mark Barton |
Suspensions
Optics
KAGRA
|
22 Dec 2015 |
| G1504550-v3 |
Modelling tools for seismic and payload mechanical systems |
Yoshinori Fujii |
KAGRA
Suspensions
|
02 Dec 2015 |
| E1504481-v0 |
BS Suspension Part and Fastener List |
Mark Barton |
Suspensions
KAGRA
|
06 Nov 2015 |
| E1504443-v1 |
PR Suspension Part and Fastener List |
Mark Barton |
Suspensions
KAGRA
|
27 Oct 2015 |
| T1504420-v1 |
BS Assembly Frame Concept |
Mark Barton |
Suspensions
KAGRA
|
22 Oct 2015 |
| D1503617-v2 |
EXA Suspension Cabling |
Mark Barton |
Suspensions
KAGRA
|
08 Oct 2015 |
| T1504316-v1 |
VIS Tool List |
Mark Barton |
Suspensions
KAGRA
|
02 Oct 2015 |
| G1504277-v1 |
KAGRAにおける懸架系制御 II |
Takanori Sekiguchi |
KAGRA
Workshop
Seismic Isolation
Suspensions
|
25 Sep 2015 |
| T1504271-v1 |
BS Standoffs |
Mark Barton |
KAGRA
Suspensions
|
24 Sep 2015 |
| T1504218-v1 |
Optical Lever for Setting Pitch of Optic |
Mark Barton |
KAGRA
Suspensions
|
09 Sep 2015 |
| T1503467-v2 |
Possible fixes for Type Bp suspension damping issue (PR2/PR3/PRM) |
Mark Barton |
KAGRA
Suspensions
|
19 Aug 2015 |
| E1503840-v2 |
PR2/PR3/PRM Suspension Final Assembly and Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
11 Aug 2015 |
| G1503926-v1 |
Alignment control for type-B and type-Bp with oplev/WFS |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
05 Aug 2015 |
| E1503922-v1 |
VIS Cable Summary |
Mark Barton |
Suspensions
Circuits
KAGRA
|
04 Aug 2015 |
| G1503768-v1 |
Suspension Dynamics Modeling for LIGO and KAGRA |
Mark Barton |
KAGRA
Suspensions
|
24 Jul 2015 |
| D1503415-v4 |
Summary of Suspension Configurations |
Yuta Michimura |
Seismic Isolation
Suspensions
KAGRA
|
24 Jul 2015 |
| G1503829-v1 |
Local control for type-B SAS |
Takanori Sekiguchi |
KAGRA
Seismic Isolation
Suspensions
|
13 Jul 2015 |
| G1503735-v1 |
Control and tuning of suspension |
Takanori Sekiguchi |
KAGRA
Suspensions
External Review
Seismic Isolation
|
26 Jun 2015 |
| T1503606-v2 |
Suspension control modeling tools |
Takanori Sekiguchi |
KAGRA
Suspensions
Seismic Isolation
|
17 Jun 2015 |
| D1503618-v0 |
EYA Suspension Cabling |
Mark Barton |
KAGRA
Suspensions
|
08 Jun 2015 |
| T1403037-v3 |
OSEM to Sat Amp Cabling |
Mark Barton et al. |
Suspensions
KAGRA
|
08 Jun 2015 |
| D1503382-v2 |
Type B Prototype Cabling |
Mark Barton et al. |
Suspensions
KAGRA
|
31 May 2015 |
| T1503578-v2 |
Installation procedure for type-B SAS prototype inside TAMA vacuum chamber |
Yoshinori Fujii et al. |
Seismic Isolation
Suspensions
KAGRA
|
27 May 2015 |
| G1503585-v2 |
Type-B SASPrototype Test |
Takanori Sekiguchi |
KAGRA
Seismic Isolation
Suspensions
|
26 May 2015 |
| G1503582-v3 |
KAGRA MIF Status Report (May 26, 2015) |
Yuta Michimura |
KAGRA
KAGRA meeting
Suspensions
Interferometer Sensing and Control
|
26 May 2015 |
| T1503469-v1 |
Evaluation of BS and RM noise arisen from the AC component of geomagnetism field |
Kenji Ono |
Suspensions
KAGRA
|
09 Apr 2015 |
| G1503292-v1 |
Prototype Test of Type-B |
Takanori Sekiguchi |
KAGRA
KAGRA F2F
Suspensions
Seismic Isolation
|
06 Feb 2015 |
| D1503264-v1 |
Drawing of interface plate for geophone vacuum pod |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
29 Jan 2015 |
| D1503263-v1 |
Revised drawing of bottom filter assembly for type-B payload |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
29 Jan 2015 |
| D1503261-v1 |
Drawing of assembly frame for the prototype test of type-B system in TAMA |
Takanori Sekiguchi |
Suspensions
Seismic Isolation
KAGRA
|
28 Jan 2015 |
| T1403040-v0 |
Procedure for Installation of Type B Prototype at TAMA |
Mark Barton |
KAGRA
Suspensions
|
04 Dec 2014 |
| G1202785-v1 |
Suspension thermal noise in KAGRA (without vertical spring in TM suspension) |
Takanori Sekiguchi |
KAGRA
Suspensions
|
16 Sep 2014 |
| T1402723-v1 |
Noise Budget of Optical Lever with Position Sensitive Detector |
Takanori Sekiguchi |
KAGRA
Suspensions
|
08 Sep 2014 |
| G1402699-v1 |
FEA modelling of cryogenic suspension system |
Rahul Kumar |
R&D
KAGRA meeting
Suspensions
|
04 Sep 2014 |
| T1402698-v1 |
Estimation of thermal noise contribution from Indium bonds |
Rahul Kumar |
Suspensions
R&D
KAGRA meeting
|
04 Sep 2014 |
| T1402448-v1 |
Minute of NAOJ-VIS Meeting on May 21st, 2014 |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
04 Jun 2014 |
| G1402399-v1 |
Monthly Report about Type-B Payload |
Others Others |
KAGRA
Suspensions
Seismic Isolation
|
16 May 2014 |
| G1402398-v1 |
OSEM LED Selection Measurements |
Others Others |
KAGRA
Suspensions
Seismic Isolation
|
16 May 2014 |
| T1402264-v1 |
Mirror suspensions hierarchy for beam splitter and recyclers |
Riccardo DeSalvo |
KAGRA
Suspensions
|
19 Mar 2014 |
| G1402200-v1 |
Type-A SAS Local Control Simulation [Current Status] |
Takanori Sekiguchi |
Suspensions
Seismic Isolation
KAGRA
|
13 Feb 2014 |
| T1402170-v1 |
Disposition of Sensors and Actuators in Type-A Vibration Isolation System |
Takanori Sekiguchi |
KAGRA
Suspensions
Seismic Isolation
|
30 Jan 2014 |
| T1402160-v1 |
Actuator Response of Cryogenic Payload with Different Suspension Points of Sapphire Fibers |
Takanori Sekiguchi |
KAGRA
Suspensions
|
29 Jan 2014 |
| T1402159-v1 |
Requirement for Actuator Noise in Type-A Vibration Isolation System |
Takanori Sekiguchi |
Suspensions
KAGRA
|
28 Jan 2014 |
| G1402127-v5 |
10Hz-30Hzの影響 |
Kazuhiro Hayama |
Suspensions
Collaboration meeting
Data Analysis
KAGRA
|
22 Jan 2014 |
| G1402136-v3 |
10ー30Hz帯の影響:中間質量ブラックホール関連 |
Hiroyuki Nakano |
Cryogenic
Suspensions
Seismic Isolation
Collaboration meeting
Data Analysis
KAGRA
|
21 Jan 2014 |
| T1402131-v1 |
Suspension Thermal Noise of Test Mass Suspension With Metal Wires + Heat Links |
Takanori Sekiguchi |
KAGRA
Suspensions
Cryogenic
|
13 Jan 2014 |
| T1402106-v1 |
Preliminary design of Type-A suspension system (cryogenic seismic attenuation system) for KAGRA sapphire mirrors |
Eiichi Hirose et al. |
Seismic Isolation
Suspensions
Cryogenic
KAGRA
|
06 Jan 2014 |
| G1302072-v2 |
Status of Cryogenic Payload Overall Design |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
25 Dec 2013 |
| T1302090-v1 |
Type-A SAS Mechanical Model Parameters |
Takanori Sekiguchi |
Suspensions
Seismic Isolation
KAGRA
|
20 Dec 2013 |
| G1302026-v3 |
Cryogenic Payload Modeling Status: Vibration via Heat Links |
Takanori Sekiguchi |
KAGRA
Suspensions
|
03 Dec 2013 |
| T1301998-v0 |
Status Report on Nov.19th, Modeling of Type-A Vibration Isolation System |
Takanori Sekiguchi |
KAGRA
Cryogenic
Suspensions
Seismic Isolation
|
19 Nov 2013 |
| T1301996-v1 |
Finite Element Analysis of Heat Links and Optimization Study |
Takanori Sekiguchi |
Cryogenic
Suspensions
KAGRA
|
19 Nov 2013 |
| T1301987-v2 |
Finite Element Analysis of Heat Links Using COMSOL Multiphysics |
Takanori Sekiguchi |
Cryogenic
Suspensions
KAGRA
|
15 Nov 2013 |
| T1301966-v2 |
Type-B SAS Test Plan |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
09 Nov 2013 |
| T1301972-v1 |
Minute of Type-B SAS Prototype Test Kick-off Meeting |
Takanori Sekiguchi |
Seismic Isolation
Suspensions
KAGRA
|
06 Nov 2013 |
| T1301921-v1 |
Cryopayload Modeling Current Status |
Takanori Sekiguchi |
Cryogenic
Suspensions
KAGRA
|
16 Oct 2013 |
| G1301863-v2 |
Cryopayload Design Consideration |
Takanori Sekiguchi |
Cryogenic
Suspensions
KAGRA
|
20 Sep 2013 |
| T9601820-v1 |
外部磁場変動による鏡の変動量の計算 |
Masaki Ando |
TAMA
Suspensions
|
08 Sep 2013 |
| G1301697-v2 |
Effect of violin modes to the search for GWs |
Kazuhiro Hayama |
KAGRA
Data Analysis
Suspensions
Others
|
18 Jun 2013 |
| D1201181-v4 |
type-B suspension drawings |
Riccardo DeSalvo |
KAGRA
Suspensions
|
08 Apr 2013 |
| G1201312-v1 |
dimentioning the cryo suspensions |
Riccardo DeSalvo |
Suspensions
KAGRA
|
30 Mar 2013 |
| T1301588-v1 |
Construction of Type-B seismic attenuation chain and Mirror assembly tooling |
Riccardo DeSalvo |
Suspensions
KAGRA
|
27 Mar 2013 |
| T1100571-v2 |
Recycler and Beam Splitter suspension structure |
Riccardo DeSalvo |
KAGRA
Suspensions
|
27 Mar 2013 |
| G1201424-v1 |
Thermal_Boundary_Resistance |
Warren Johnson |
KAGRA
Suspensions
|
12 Dec 2012 |
| T1201317-v1 |
Summary of Oct. 11th meeting on cryogenic suspensions. |
Riccardo DeSalvo |
Suspensions
KAGRA
|
12 Oct 2012 |
| G1201302-v3 |
Simulation for KAGRA cryogenic payload: vibration via heat links and thermal noise |
Takanori Sekiguchi |
Workshop
KAGRA
Suspensions
|
02 Oct 2012 |
| G1201247-v2 |
Cryogenic Suspension for KAGRA and Suspension Thermal Noise Issues |
Takanori Sekiguchi |
Suspensions
KAGRA
Workshop
|
21 Aug 2012 |
| G1201037-v4 |
External forces from heat links in cryogenic suspensions |
Takanori Sekiguchi |
KAGRA
Suspensions
GWADW
Seismic Isolation
Cryogenic
|
21 Aug 2012 |
| G1201180-v1 |
photos of assembly of type-B suspensions |
Riccardo DeSalvo |
Suspensions
KAGRA
|
27 Jul 2012 |
| G1201174-v1 |
Composite mirror suspensions development, status and directions |
Riccardo DeSalvo |
Suspensions
KAGRA
|
20 Jul 2012 |
| T1201112-v1 |
宇宙線の干渉計型検出器への影響III (momentum deposit による励起) |
Kazuhiro Yamamoto |
KAGRA
Suspensions
Others
|
20 Jun 2012 |
| T1100689-v2 |
Channel numbers for VIS |
Osamu Miyakawa et al. |
Data Acquisition
KAGRA
Suspensions
Circuits
Seismic Isolation
Digital Control
|
08 Jun 2012 |
| D1200894-v1 |
Standalone Digital System for VIS Rack Layout |
Osamu Miyakawa |
KAGRA
Suspensions
Digital Control
Seismic Isolation
|
06 Mar 2012 |
| G1200859-v2 |
Suspension Thermal Noise of a Non-Uniform Fiber |
Takanori Sekiguchi |
KAGRA F2F
KAGRA
Suspensions
|
04 Feb 2012 |
| P1200770-v2 |
Modeling and Simulation of Vibration Isolation System for Large-scale Cryogenic Gravitational-wave Telescope (LCGT) |
Takanori Sekiguchi |
Suspensions
Thesis
Seismic Isolation
KAGRA
|
02 Feb 2012 |
| G1200817-v1 |
Lecture of Standalone Digital system for VIS |
Osamu Miyakawa |
KAGRA
Suspensions
Seismic Isolation
Digital Control
|
31 Jan 2012 |
| G1200797-v1 |
LCGT用防振装置のモデリングとシミュレーション |
Takanori Sekiguchi |
KAGRA
Thesis
Suspensions
Seismic Isolation
|
23 Jan 2012 |
| G1100716-v2 |
Thermal Noisein the Test Mass Suspensionwith Variable-Thickness Fibers |
Takanori Sekiguchi |
Suspensions
KAGRA
|
29 Nov 2011 |
| T1100569-v3 |
Data of Parameters of cryogenic payload in LCGT |
Kazuhiro Yamamoto |
Suspensions
Special Working Group
KAGRA
|
21 Nov 2011 |
| T1100637-v5 |
Recycler and Beam Splitter mirror suspension assembly sequence |
Riccardo DeSalvo |
KAGRA
Suspensions
|
11 Nov 2011 |
| D1100673-v1 |
Recycler mirror 3D models |
Riccardo DeSalvo |
Suspensions
KAGRA
|
08 Nov 2011 |
| G1100639-v2 |
並木精密宝石との打ち合わせ及び今後の方針 |
Kazuhiro Yamamoto |
KAGRA meeting
KAGRA
Suspensions
|
26 Oct 2011 |
| G1100619-v1 |
低温懸架装置ミーティング(細かいこと) |
Kazuhiro Yamamoto |
KAGRA meeting
KAGRA
Suspensions
|
27 Sep 2011 |
| G1100593-v3 |
Development of vibration isolation systems for LCGT VI |
Kazuhiro Yamamoto |
Suspensions
KAGRA
JPS
|
20 Sep 2011 |
| G1100586-v1 |
Thermal noise History from Brownian motion until interferometer |
Kazuhiro Yamamoto |
KAGRA
Seminar
Suspensions
|
06 Sep 2011 |
| G1100587-v1 |
Thermal noise History from Brownian motion until interferometer |
Kazuhiro Yamamoto |
KAGRA
Seminar
Suspensions
|
06 Sep 2011 |
| G1100582-v1 |
小池さんのANSYSによる熱解析 |
Kazuhiro Yamamoto |
Special Working Group
KAGRA
Suspensions
|
30 Aug 2011 |
| G1100581-v1 |
低温懸架装置ミーティング(2011 Aug 31) |
Kazuhiro Yamamoto |
Suspensions
Special Working Group
KAGRA
|
30 Aug 2011 |
| G1100558-v5 |
New suspension study for LCGT |
Erina Nishida |
Suspensions
KAGRA F2F
KAGRA
|
26 Aug 2011 |
| D1100542-v2 |
Recycler mirror design |
Riccardo DeSalvo |
KAGRA
Suspensions
|
06 Aug 2011 |
| G1100497-v1 |
Informal meeting of cryogenic payload |
Kazuhiro Yamamoto |
Suspensions
KAGRA meeting
KAGRA
|
11 Jul 2011 |
| G1000108-v4 |
有限要素解析によるLCGTヒートリンクの防振性能評価 |
Yoichi Aso |
KAGRA
KAGRA F2F
Suspensions
Cryogenic
|
12 Jun 2011 |
| G1100441-v1 |
Issues and approaches for LCGT GWDAW 2011 |
Erina Nishida |
KAGRA
Suspensions
GWADW
|
29 May 2011 |
| G1000077-v5 |
低温レーザー干渉計CLIO(29) LSPIの導入(II) |
collaboration CLIO et al. |
Suspensions
R&D
CLIO
JPS
|
10 May 2010 |
| T1000088-v1 |
ICD of Vibration Isolation Subsystem |
Shinji Miyoki et al. |
KAGRA
ICD
Seismic Isolation
Suspensions
|
15 Apr 2010 |
| G1000069-v3 |
PLUS-2009年度の活動状況 |
Masaki Ando et al. |
Interferometer Sensing and Control
Cryogenic
TAMA
Reviews
CLIO meeting
Seismic Isolation
Suspensions
Auxiliary IFO
Infrastructure
CLIO
R&D
Interferometer
Optics
Laser
KAGRA
KAGRA meeting
|
25 Feb 2010 |
| G1000062-v1 |
Study of pendulum thermal noise in gravitational wave detectors |
Kazuhiro Agatsuma |
Others
Suspensions
CLIO
|
24 Jan 2010 |
| T0900056-v1 |
Study report on the LCGT Suspension Point Interferometer |
Masaki Ando et al. |
Seismic Isolation
Suspensions
Interferometer
KAGRA
|
19 Nov 2009 |
| G0900051-v1 |
低温レーザー干渉計CLIO(22) |
Kazuhiro Agatsuma |
Conference
CLIO
Suspensions
|
13 Sep 2009 |
| D0900050-v1 |
低温レーザー干渉計CLIO(22) |
Kazuhiro Agatsuma |
Suspensions
Conference
CLIO
|
12 Sep 2009 |
| G0800046-v1 |
Thermal Noise of Pendulum from Coil-Magnet Actuator in CLIO |
Kazuhiro Agatsuma |
Suspensions
CLIO
Conference
|
06 Sep 2009 |
| T0800045-v1 |
Thermal Noise of Coil-Magnet Actuator |
Kazuhiro Agatsuma |
CLIO
Suspensions
|
06 Sep 2009 |