Documents from Last 30 Days

DocDB Home ]  [ Search ] [ Recent Changes ]

These documents have been modified in the last 30 days.

modified in the last days.

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
T1707208-v3 TEM00 loss of clipped beam and requirements for baffle radii at PR2/SR2 Tomofumi Shimoda KAGRA
Auxiliary IFO
19 Feb 2019
D1909844-v0 Rack design schematic for OMC1 Yutaro Enomoto et al. Digital Control
Interferometer Sensing and Control
KAGRA
Length Sensing and Control
System Engineering
Data Acquisition
Calibration
Circuits
Alignment Sensing and control
Interferometer
19 Feb 2019
G1909831-v2 Characterization and commissioning of the SR suspensions of KAGRA Enzo Tapia KAGRA
Workshop
Suspensions
19 Feb 2019
G1909840-v2 Current commissioning status Osamu Miyakawa Chief meeting
KAGRA
Interferometer
18 Feb 2019
G1909662-v4 2.5+G and KAGRA: bridging between 2G and 3G Sadakazu Haino Others
KAGRA
KAGRA meeting
16 Feb 2019
G1909832-v3 presentation in 5th KIW (Type B status and master thesis) Ryohei Kozu KAGRA
Workshop
Suspensions
16 Feb 2019
G1605034-v3 SUMCON user's manual Yoshinori Fujii KAGRA
Suspensions
15 Feb 2019
T1503729-v2 Suspension rigid-body modeling tool in Mathematica Takanori Sekiguchi Seismic Isolation
KAGRA
Suspensions
15 Feb 2019
G1909624-v1 Status of KAGRA Type B Suspensions (KIW, 2019-02) Mark Barton et al. KAGRA
Suspensions
15 Feb 2019
G1909827-v4 [Talk for the KIW5] Status of the input optics for the O3 Masayuki Nakano KAGRA
Optics
Workshop
15 Feb 2019
G1909825-v3 [Talk for 5thKIW] Status of Type-A suspensions for KAGRA Yoshinori Fujii Seismic Isolation
KAGRA
Suspensions
14 Feb 2019
G1909593-v2 Commissioning Status of KAGRA (talk for KIW5) Kiwamu Izumi Digital Control
Interferometer Sensing and Control
KAGRA
Length Sensing and Control
Workshop
Suspensions
Alignment Sensing and control
14 Feb 2019
S1909724-v1 Wenzel Harmonic Generator 500-31450 Chassis S_No.001 Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
Circuits
14 Feb 2019
E1605649-v0 Document Tree for KAGRA Status Talks Yuta Michimura KAGRA
12 Feb 2019
G1909824-v1 hveto Report for PCal Injection Data with Locked status Piljong Jung Others
Seminar
Other Groups
11 Feb 2019
T1809537-v4 Example sensitivity curves for the KAGRA upgrade Yutaro Enomoto et al. KAGRA
R&D
10 Feb 2019
T1909618-v6 Cartoon of AS Port Yuta Michimura et al. Interferometer Sensing and Control
KAGRA
08 Feb 2019
M1909820-v0 Letter of Intent, between Einstein Telescope and KAGRA collaborations Takaaki Kajita KAGRA
MOU
08 Feb 2019
S1909725-v1 Wenzel Harmonic Generator 500-31450 Chassis S_No.002 Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
Circuits
08 Feb 2019
M1909818-v1 KAGRA Collaboration Agreement, sample format Hisaaki Shinkai KAGRA
MOU
07 Feb 2019
T1809211-v12 EOM RF Amplifier Plan Kiwamu Izumi et al. KAGRA
Modulation
Circuits
07 Feb 2019
T1909661-v0 Harmonic Generator Modification Plan Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
Modulation
Circuits
06 Feb 2019
M1909631-v2 Observation Run 3 (O3) Commitment Form: Agreement on the joint activities with LIGO/Virgo Hisaaki Shinkai Management
KAGRA
05 Feb 2019
E1706047-v0 SRM Suspension Electronic Items List Mark Barton KAGRA
Data Acquisition
Suspensions
Circuits
05 Feb 2019
E1706046-v0 SR3 Suspension Electronic Items List Enzo Tapia KAGRA
Data Acquisition
Suspensions
Circuits
05 Feb 2019
E1605886-v0 SR2 Suspension Electronic Items List Mark Barton KAGRA
Data Acquisition
Suspensions
Circuits
05 Feb 2019
T1809078-v8 *APPROVED* KAGRA Sensitivity for Observation Scenario Paper 2018 Sadakazu Haino et al. KAGRA
04 Feb 2019
P1809347-v9 [Thesis] Development of 13.5-meter-tall Vibration Isolation System for the Main Mirrors in KAGRA Koki Okutomi Seismic Isolation
KAGRA
Thesis
Suspensions
04 Feb 2019
G1909657-v3 Report of commissioning tasks Osamu Miyakawa Chief meeting
KAGRA
Interferometer
04 Feb 2019
D1808394-v13 ISC system circuit diagram (old title: ALS system circuit diagram) Kiwamu Izumi et al. Interferometer Sensing and Control
KAGRA
01 Feb 2019
D1909596-v2 Sketch of OpLev setup for PRM Simon Zeidler KAGRA
Optics
Others
01 Feb 2019
G1909627-v1 Coherence Check from PCal Injection Data with Locked status Piljong Jung Others
KAGRA
Seminar
01 Feb 2019
T1707586-v12 List of RF Cables to Purchase for bKAGRA Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
Circuits
31 Jan 2019
P1909567-v2 Master Thesis (Ryohei Kozu) Ryohei Kozu Theory
Thesis
Suspensions
31 Jan 2019
D1808696-v5 Rack design schematic for ALSs 0 and 1 Kiwamu Izumi Interferometer Sensing and Control
KAGRA
31 Jan 2019
S1807794-v0 Newfocus8742 picomotor driver Yuta Michimura Digital Control
KAGRA
28 Jan 2019
T1605967-v6 Cartoon of the optical layout around SRs Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
26 Jan 2019
L1909582-v3 Request for tuning RF PD and RF QPD Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
24 Jan 2019
T1909573-v2 Definitions for the DRMI commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
23 Jan 2019
D1909579-v8 Obelisk Post and Its Attachment for POS Yuta Michimura Data Analysis
Auxiliary IFO
22 Jan 2019

Number of documents found: 40

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.45 usr + 0.07 sys = 0.52 CPU)