Document List by Author
Mark Barton of National Astronomical Observatory
is listed as an author on the following documents:
JGW-Number
|
Title
|
Author(s)
|
Topic(s)
|
Last Updated
|
P2011860-v3 |
Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector |
Mark Barton et al. |
Seismic Isolation
KAGRA
Paper
|
18 Sep 2022 |
D1503615-v2 |
PR3 Suspension Cabling (bKAGRA) |
Mark Barton |
Suspensions
KAGRA
|
25 May 2022 |
D1503614-v4 |
PR2 Suspension Cabling |
Mark Barton |
Suspensions
KAGRA
|
25 May 2022 |
S1808744-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
KAGRA
Suspensions
|
02 Aug 2021 |
S1808743-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
Suspensions
KAGRA
|
02 Aug 2021 |
S1808742-v0 |
Newfocus8742 picomotor driver |
Mark Barton |
Suspensions
KAGRA
|
30 Jun 2021 |
E1605111-v1 |
BS Suspension Electronic Items List |
Mark Barton |
KAGRA
Circuits
Data Acquisition
Suspensions
|
18 May 2021 |
D1707077-v8 |
SR3 assy in vacuum chamber |
Yoichi Aso et al. |
Seismic Isolation
Others
KAGRA
|
20 Jan 2021 |
D1503600-v16 |
Type B Suspension Cabling |
Mark Barton et al. |
Suspensions
KAGRA
Circuits
|
16 Jun 2019 |
E1605036-v0 |
VIS Document and Drawing Tree (SR) |
Mark Barton |
Suspensions
KAGRA
|
11 May 2019 |
E1706047-v0 |
SRM Suspension Electronic Items List |
Mark Barton |
Data Acquisition
Circuits
KAGRA
Suspensions
|
20 Mar 2019 |
G1909624-v1 |
Status of KAGRA Type B Suspensions (KIW, 2019-02) |
Mark Barton et al. |
KAGRA
Suspensions
|
15 Feb 2019 |
E1605886-v0 |
SR2 Suspension Electronic Items List |
Mark Barton |
Data Acquisition
KAGRA
Circuits
Suspensions
|
05 Feb 2019 |
E1808404-v0 |
Type B Spare Electronic Items List |
Mark Barton et al. |
None
|
13 Dec 2018 |
T1707205-v6 |
BS Suspension Diagonalization Matrices |
Enzo Tapia |
Suspensions
KAGRA
|
27 Nov 2018 |
T1807663-v3 |
SR Suspension Diagonalization Matrices |
Mark Barton |
KAGRA
Suspensions
|
27 Nov 2018 |
E1605035-v0 |
VIS Document and Drawing Tree (BS) |
Mark Barton |
None
|
28 Jul 2018 |
E1707276-v0 |
VIS Document and Drawing Tree (Type-B Electronics) |
Mark Barton |
Circuits
KAGRA
Suspensions
|
21 Jun 2018 |
D1707397-v3 |
Chain SR3 |
Mark Barton et al. |
Others
Seismic Isolation
KAGRA
|
20 May 2018 |
E1707293-v0 |
VIS Document and Drawing Tree (SR3) |
Mark Barton |
Suspensions
KAGRA
|
20 May 2018 |
E1808045-v1 |
Geophone Pod Assembly Procedure |
Mark Barton et al. |
Suspensions
KAGRA
Circuits
|
25 Mar 2018 |
E1706105-v0 |
Revised geophone cabling |
Mark Barton |
Suspensions
Circuits
KAGRA
|
30 Jan 2017 |
E1807869-v0 |
Type B Boxes and Cards and Modules |
Mark Barton |
Circuits
KAGRA
Suspensions
|
21 Feb 2018 |
D1503901-v2 |
In-Vacuum Cable Detail |
Mark Barton |
KAGRA
Circuits
Suspensions
|
10 Jun 2016 |
E1707294-v0 |
VIS Document and Drawing Tree (SR2) |
Mark Barton |
KAGRA
Suspensions
|
17 Jan 2018 |
E1807666-v0 |
Type B Common Tasks |
Mark Barton |
KAGRA
Suspensions
|
16 Jan 2018 |
E1707548-v0 |
SR Installation Procedure |
Mark Barton |
KAGRA
Suspensions
|
14 Jan 2018 |
G1807453-v0 |
Status of KAGRA (ASJ Spring 2018) |
Mark Barton |
KAGRA
|
28 Nov 2017 |
T1707436-v0 |
SR Swap Plan |
Mark Barton |
Suspensions
KAGRA
|
21 Nov 2017 |
E1605505-v1 |
BS Gluing Procedure |
Mark Barton et al. |
Suspensions
KAGRA
Optics
|
09 Nov 2017 |
E1707295-v0 |
VIS Document and Drawing Tree (SRM) |
Mark Barton |
Suspensions
KAGRA
|
13 Oct 2017 |
G1707173-v0 |
Status of the Type B optics suspensions for the KAGRA gravitational wave detector |
Mark Barton |
Suspensions
KAGRA
|
12 Sep 2017 |
T1503941-v1 |
PR2/PR3/PRM First Contact Pattern |
Mark Barton |
Suspensions
Optics
KAGRA
|
03 Sep 2017 |
G1707113-v0 |
Type B Installation Status, f2f Meeting, 2017-09-29 |
Mark Barton |
KAGRA
Suspensions
|
29 Aug 2017 |
E1504235-v2 |
BS Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
13 Aug 2017 |
D1707018-v1 |
BS First Contact Pattern |
Mark Barton |
Optics
KAGRA
Suspensions
|
30 Jul 2017 |
E1604937-v0 |
VIS Document and Drawing Tree (Electronics) |
Mark Barton |
None
|
25 Jul 2017 |
G1706978-v1 |
Status of the Type B optics suspensions for the KAGRA gravitational wave detector (JPS Meeting, 9/2017) |
Mark Barton |
Suspensions
KAGRA
|
24 Jul 2017 |
G1706717-v1 |
Type B Installation Status, EC Meeting, 5/15/17 |
Mark Barton |
Suspensions
KAGRA
|
15 May 2017 |
G1706384-v1 |
Type B Installation Status, f2f Meeting, 3/29/17 |
Mark Barton |
Suspensions
KAGRA
|
29 Mar 2017 |
G1605970-v1 |
Type B Installation Status, Extended Chiefs Meeting, 12/19/16 |
Mark Barton |
Suspensions
KAGRA
|
19 Dec 2016 |
T1503239-v4 |
OSEM Coil/Magnet/Flag Calculation |
Mark Barton |
KAGRA
Suspensions
|
12 Sep 2016 |
T1605630-v1 |
BS Rotation |
Mark Barton |
KAGRA
Suspensions
|
08 Sep 2016 |
G1605546-v1 |
Type B Installation Status, f2f Meeting, 8/25/16 |
Mark Barton |
KAGRA
Suspensions
|
25 Aug 2016 |
E1504508-v0 |
VIS Document and Drawing Tree (Type-Bp Short) |
Mark Barton |
Management
Suspensions
KAGRA
|
02 Aug 2016 |
T1605413-v0 |
BS/SR2 Rack Location |
Mark Barton |
Digital Control
Suspensions
KAGRA
Data Acquisition
|
29 Jul 2016 |
G1605348-v2 |
Type B Installation Plan |
Mark Barton |
Suspensions
KAGRA
|
04 Jul 2016 |
E1604817-v1 |
BS Payload Assembly Procedure |
Mark Barton et al. |
Suspensions
KAGRA
|
13 May 2016 |
T1605123-v1 |
BS Cleanbag Design |
Mark Barton |
Suspensions
KAGRA
|
13 Apr 2016 |
E1605037-v1 |
BS Assembly Frame Requirements |
Mark Barton |
KAGRA
Suspensions
|
01 Apr 2016 |
T1605033-v0 |
BS Flag Tips Issue |
Mark Barton |
KAGRA
Suspensions
|
25 Mar 2016 |
E1604966-v1 |
BS Mass Budget |
Mark Barton et al. |
Suspensions
KAGRA
|
10 Mar 2016 |
D1604795-v2 |
PR3 Suspension Cabling - iKAGRA Configuration |
Mark Barton |
Suspensions
KAGRA
|
04 Mar 2016 |
L1604941-v1 |
How to explain the name "KAGRA" |
Mark Barton |
Paper
KAGRA
|
04 Mar 2016 |
D1604939-v4 |
Spec sheet for D-Sub and D-Micro connectors as used for VIS in-vacuum cables |
Mark Barton |
KAGRA
Circuits
Vacuum
Suspensions
|
03 Mar 2016 |
D1604938-v1 |
Spec sheet for Gore Cable as used for VIS in-vacuum signal cables |
Mark Barton |
Suspensions
Vacuum
KAGRA
Circuits
|
03 Mar 2016 |
D1604936-v1 |
Spec sheet for MWS Cable as used for VIS in-vacuum motor cables |
Mark Barton |
Vacuum
Suspensions
KAGRA
Circuits
|
03 Mar 2016 |
G1604843-v2 |
Type B Installation Status, f2f Meeting, 2/22/16 |
Mark Barton |
Suspensions
KAGRA
|
22 Feb 2016 |
D1503619-v0 |
VIS Document and Drawing Tree - iKAGRA Cabling |
Mark Barton |
Suspensions
KAGRA
|
05 Feb 2016 |
E1604779-v0 |
VIS Document and Drawing Tree (Type Bpp) |
Mark Barton |
Suspensions
KAGRA
|
31 Jan 2016 |
E1604778-v0 |
VIS Document and Drawing Tree - bKAGRA |
Mark Barton |
KAGRA
Suspensions
|
31 Jan 2016 |
E1604777-v0 |
VIS Document and Drawing Tree - iKAGRA |
Mark Barton |
KAGRA
Suspensions
|
31 Jan 2016 |
G1504702-v1 |
Scheme for removing cracked prism on PR2 |
Mark Barton |
Suspensions
Optics
KAGRA
|
22 Dec 2015 |
E1504481-v0 |
BS Suspension Part and Fastener List |
Mark Barton |
Suspensions
KAGRA
|
06 Nov 2015 |
E1504443-v1 |
PR Suspension Part and Fastener List |
Mark Barton |
KAGRA
Suspensions
|
27 Oct 2015 |
T1504420-v1 |
BS Assembly Frame Concept |
Mark Barton |
Suspensions
KAGRA
|
22 Oct 2015 |
D1503617-v2 |
EXA Suspension Cabling |
Mark Barton |
KAGRA
Suspensions
|
08 Oct 2015 |
T1504316-v1 |
VIS Tool List |
Mark Barton |
Suspensions
KAGRA
|
02 Oct 2015 |
T1504271-v1 |
BS Standoffs |
Mark Barton |
KAGRA
Suspensions
|
24 Sep 2015 |
T1504218-v1 |
Optical Lever for Setting Pitch of Optic |
Mark Barton |
KAGRA
Suspensions
|
09 Sep 2015 |
T1503467-v2 |
Possible fixes for Type Bp suspension damping issue (PR2/PR3/PRM) |
Mark Barton |
Suspensions
KAGRA
|
19 Aug 2015 |
E1503840-v2 |
PR2/PR3/PRM Suspension Final Assembly and Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
11 Aug 2015 |
E1503922-v1 |
VIS Cable Summary |
Mark Barton |
Suspensions
KAGRA
Circuits
|
04 Aug 2015 |
G1503768-v1 |
Suspension Dynamics Modeling for LIGO and KAGRA |
Mark Barton |
KAGRA
Suspensions
|
24 Jul 2015 |
D1503618-v0 |
EYA Suspension Cabling |
Mark Barton |
KAGRA
Suspensions
|
08 Jun 2015 |
T1403037-v3 |
OSEM to Sat Amp Cabling |
Mark Barton et al. |
Suspensions
KAGRA
|
08 Jun 2015 |
D1503382-v2 |
Type B Prototype Cabling |
Mark Barton et al. |
Suspensions
KAGRA
|
31 May 2015 |
T1403040-v0 |
Procedure for Installation of Type B Prototype at TAMA |
Mark Barton |
KAGRA
Suspensions
|
04 Dec 2014 |
Number of documents found: 78
DocDB Version 8.7.10, contact
Document Database Administrators
Execution time: 2 wallclock secs ( 0.72 usr + 0.09 sys = 0.81 CPU)