Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G2415980-v3 Future Strategy of KAGRA (FSC report for KAGRA F2F Aug 2024) Yuta Michimura Interferometer
KAGRA F2F
KAGRA
23 Aug 2024
T1503729-v4 SUMCON 1.5.0: Suspension Modeling Constructor in Mathematica Perry Forsyth et al. Suspensions
KAGRA
Seismic Isolation
07 Mar 2024
P2214296-v3 Optimizing Active Vibration Isolation Systems in Ground-Based Interferometric Gravitational-Wave detectors Tak Lun Terrence Tsang KAGRA
Suspensions
Seismic Isolation
Thesis
30 Sep 2022
G2214185-v5 KAGRAにおける微気圧・低周波音響雑音モニター [JPS2022Sep.] Tatsuki Washimi KAGRA
PEM
JPS
26 Sep 2022
D1503615-v2 PR3 Suspension Cabling (bKAGRA) Mark Barton KAGRA
Suspensions
25 May 2022
D1503614-v4 PR2 Suspension Cabling Mark Barton Suspensions
KAGRA
25 May 2022
G2213752-v3 KAGRA Environmental data for the Tonga Eruption (2022-01-15) / トンガ噴火(2022年1月15日)によるKAGRAの環境データ Tatsuki Washimi PEM
KAGRA
08 Feb 2022
G1910447-v1 PEM meeting (2019/7/16, washimi) Tatsuki Washimi KAGRA
PEM
16 Jul 2019
G1910551-v1 Update of reverberation time measurement (8/20 VK PEM meeting) Tatsuki Washimi PEM
KAGRA
18 Aug 2019
G2113456-v1 KAGRAにおける環境雑音 (第2回新学術「地下宇宙」若手研究会) Tatsuki Washimi Workshop
PEM
KAGRA
26 Nov 2021
G2112918-v3 [Amaldi14] Optimal Sensor Fusion using H-infinity Methods - Synthesizing Complementary Filters for Active Seismic Noise Isolation Systems in KAGRA Tak Lun Terrence Tsang Suspensions
KAGRA
Seismic Isolation
16 Nov 2021
G2113120-v6 神岡地上・地下におけるシューマン共振磁場の測定 (JPS 2021Sep) Tatsuki Washimi PEM
KAGRA
JPS
27 Sep 2021
G2113243-v2 [KAGRA 27th F2F poster] Optimal Sensor Fusion using H-infinity Synthesis Tak Lun Terrence Tsang Seismic Isolation
KAGRA
Suspensions
KAGRA F2F
27 Aug 2021
G2113070-v1 Effects of Lightning Strokes on KAGRA Observatory (KIW8, poster) Tatsuki Washimi Workshop
PEM
KAGRA
05 Jul 2021
E1605111-v1 BS Suspension Electronic Items List Mark Barton Circuits
KAGRA
Suspensions
Data Acquisition
18 May 2021
T1808963-v2 Diagonalization of Optical Lever signals for Type B suspensions Tak Lun Terrence Tsang KAGRA
Suspensions
Seismic Isolation
03 May 2021
D1402607-v2 KAGRA用光学定盤の高さ Yuta Michimura KAGRA meeting
Optics
KAGRA
Interferometer Sensing and Control
06 Apr 2021
P2012122-v5 Method for environmental noise estimation via injection tests for ground-based gravitational wave detectors Tatsuki Washimi et al. Paper
PEM
KAGRA
29 Dec 2020
G2012212-v3 Status of KAGRA: Expectations for O4 Sensitivity Yuta Michimura Interferometer
KAGRA
09 Nov 2020
G2011889-v4 Optimal Control and Optimization for KAGRA Vibration Isolation system Tak Lun Terrence Tsang Suspensions
KAGRA
Management
04 Sep 2020
T2011764-v4 Kontrol: KAGRA Control Python Library for VIS Control Systems Tak Lun Terrence Tsang Management
Suspensions
KAGRA
20 Jun 2020
T2011661-v3 Actuator modification for cryopayload Yuta Michimura Cryogenic
KAGRA
Suspensions
Interferometer Sensing and Control
27 May 2020
G2011694-v1 KAGRA observation run: performance of the Type A suspensions Trozzo Lucia Others
Seismic Isolation
KAGRA
26 May 2020
P1910218-v8 Application of the independent component analysis to the iKAGRA data Junya Kume et al. KAGRA
Data Analysis
Paper
11 Mar 2020
G1809364-v5 Final Draft of bKAGRA Phase 1 Paper (F2F Dec 5, 2018) Sadakazu Haino et al. KAGRA
Paper
KAGRA F2F
04 Feb 2020
G1808902-v2 bKAGRA Phase 1 Paper Status (F2F Aug 25, 2018) Sadakazu Haino et al. KAGRA F2F
Paper
KAGRA
04 Feb 2020
E1706046-v0 SR3 Suspension Electronic Items List Enzo Tapia KAGRA
Suspensions
Data Acquisition
Circuits
08 Aug 2019
G1910445-v1 Commissioning and performance of the Signal Recycling suspensions of KAGRA Enzo Tapia Suspensions
KAGRA
Workshop
16 Jul 2019
G1910367-v1 Status of Frequency Dependent Squeezing Experiment at TAMA Yuhang Zhao Others
Conference
R&D
21 Jun 2019
G1910284-v5 Status of KAGRA Physical Environmental Monitors toward the O3 (KIW6) Tatsuki Washimi Workshop
PEM
KAGRA
20 Jun 2019
D1503600-v16 Type B Suspension Cabling Mark Barton et al. Circuits
Suspensions
KAGRA
16 Jun 2019
G1910262-v1 Status of the frequency dependent squeezing experiment at TAMA Yuhang Zhao TAMA
GWADW
Detector
28 May 2019
T1910142-v2 Noise and range calculations for using High Power Coil Driver for the test mass stage of cryopayload Yuta Michimura KAGRA
Suspensions
Interferometer Sensing and Control
24 Apr 2019
G1910124-v1 KAGALI PE development Chunglee Kim et al. Data Analysis
KAGRA F2F
Data Analysis
20 Apr 2019
G1910070-v1 Resubmission of bKAGRA Phase 1 Paper (F2F Apr 20, 2019) Yuta Michimura Paper
KAGRA F2F
KAGRA
17 Apr 2019
E1706047-v0 SRM Suspension Electronic Items List Mark Barton Circuits
KAGRA
Data Acquisition
Suspensions
20 Mar 2019
G1909954-v1 Commissioning of the typeA suspension control of KAGRA Trozzo Lucia KAGRA
Seismic Isolation
JPS
14 Mar 2019
M1909820-v3 Letter of Intent, between Einstein Telescope and KAGRA collaborations Takaaki Kajita KAGRA
MOU
20 Feb 2019
G1909831-v2 Characterization and commissioning of the SR suspensions of KAGRA Enzo Tapia Workshop
KAGRA
Suspensions
19 Feb 2019
G1909624-v1 Status of KAGRA Type B Suspensions (KIW, 2019-02) Mark Barton et al. KAGRA
Suspensions
15 Feb 2019
E1605886-v0 SR2 Suspension Electronic Items List Mark Barton Circuits
KAGRA
Suspensions
Data Acquisition
05 Feb 2019
G1809406-v1 Summary of KAGALI PE code Chunglee Kim et al. Data Analysis
KAGRA F2F
Data Analysis
06 Dec 2018
T1807588-v10 Assembly Procedure for WAB Simon Zeidler Suspensions
KAGRA
Others
30 Nov 2018
G1809006-v1 JPS Presentation. Status of the Signal Recycling Mirror Suspensions of KAGRA. Enzo Tapia Enzo Tapia JPS
KAGRA
Suspensions
14 Sep 2018
G1808551-v2 Basic lecture for students 1: VIS Suspensions and digital system. Enzo Tapia Suspensions
KAGRA
Seminar
16 Aug 2018
T1808460-v2 Estimation of clipping losses in a Fabry-Perot cavity Kiwamu Izumi Interferometer Sensing and Control
KAGRA
07 Aug 2018
G1808166-v1 Minimizing the mechanical cross-couplings in a KAGRA suspension system Ryohei Kozu Suspensions
KAGRA
17 Apr 2018
G1807772-v1 Material for the commissioning meeting on Feb 6 Kiwamu Izumi Alignment Sensing and control
Interferometer
Suspensions
KAGRA
Seismic Isolation
06 Feb 2018
G1807653-v1 Proposal for changing the BS real time model for hierarchical optical lever control Kiwamu Izumi KAGRA
Interferometer
Alignment Sensing and control
15 Jan 2018
G1707541-v2 KAGALI telecon 11 Dec 2017 Hyung Won Lee Data Analysis
Data Analysis
Others
11 Dec 2017
G1707449-v1 KAGALI PE telecon 20171120 Chunglee Kim et al. Others
Data Analysis
Data Analysis
25 Nov 2017
G1707422-v1 Review of initial alignment from the point of view of Type-C Naoko Ohishi KAGRA
Suspensions
15 Nov 2017
G1707302-v1 GPU-searches for broadband extended emission in gravitational waves in nearby core-collapse supernovae Maurice H.P.M van Putten Collaboration meeting
Data Analysis
Data Analysis
18 Oct 2017
G1707136-v1 Development of frequency dependent squeezing for future upgrades of Kagra Koji Arai et al. R&D
30 Aug 2017
E1504235-v2 BS Installation Procedure Mark Barton Suspensions
KAGRA
13 Aug 2017
T1402512-v3 Operation manual about stepper motor driver TMCM-6110 Takanori Sekiguchi Suspensions
KAGRA
Seismic Isolation
03 Mar 2017
G1706054-v1 Modal analysis report on the cryo-payload assembly frame Yoshiyuki Obuchi KAGRA
12 Jan 2017
G1605903-v1 Results of the performance test of the Y-end cryostat Nobuhiro Kimura Cryogenic
KAGRA
Chief meeting
05 Dec 2016
E1503830-v11 Procedure for hanging the test and recoil masses Fabian E Pena Arellano Suspensions
KAGRA
02 Dec 2016
T1605630-v1 BS Rotation Mark Barton KAGRA
Suspensions
08 Sep 2016
G1605594-v1 MCMC PE for eccentric CBC inspirals Jeongcho Kim et al. Data Analysis
27 Aug 2016
G1605546-v1 Type B Installation Status, f2f Meeting, 8/25/16 Mark Barton KAGRA
Suspensions
25 Aug 2016
T1503547-v5 bKAGRA PSL Design Study Yuta Michimura Laser
KAGRA
Modulation
Interferometer Sensing and Control
22 Jul 2016
G1605348-v2 Type B Installation Plan Mark Barton KAGRA
Suspensions
04 Jul 2016
T1605106-v0 Wire selection for the optic suspensions of Type B and Type Bp payloads Fabian E Pena Arellano KAGRA
Suspensions
08 Apr 2016
G1605016-v1 KAGRA低温系の現状 Toshikazu Suzuki Cryogenic
KAGRA
JPS
20 Mar 2016
G1604856-v1 Directed searches for broadband extended gravitational-wave emission in nearby energetic core-collapse supernovae Maurice H.P.M van Putten Theory
Data Analysis
KAGRA F2F
23 Feb 2016
D1503619-v0 VIS Document and Drawing Tree - iKAGRA Cabling Mark Barton Suspensions
KAGRA
05 Feb 2016
E1504443-v1 PR Suspension Part and Fastener List Mark Barton Suspensions
KAGRA
27 Oct 2015
T1504420-v1 BS Assembly Frame Concept Mark Barton Suspensions
KAGRA
22 Oct 2015
D1503617-v2 EXA Suspension Cabling Mark Barton KAGRA
Suspensions
08 Oct 2015
D1504338-v1 Assembly and hanging frames for the PR suspensions (production drawings) Yoichi Aso KAGRA
08 Oct 2015
T1504271-v1 BS Standoffs Mark Barton KAGRA
Suspensions
24 Sep 2015
E1503840-v2 PR2/PR3/PRM Suspension Final Assembly and Installation Procedure Mark Barton Suspensions
KAGRA
11 Aug 2015
E1503922-v1 VIS Cable Summary Mark Barton Circuits
Suspensions
KAGRA
04 Aug 2015
G1503768-v1 Suspension Dynamics Modeling for LIGO and KAGRA Mark Barton Suspensions
KAGRA
24 Jul 2015
D1503415-v4 Summary of Suspension Configurations Yuta Michimura Suspensions
KAGRA
Seismic Isolation
24 Jul 2015
D1503618-v0 EYA Suspension Cabling Mark Barton KAGRA
Suspensions
08 Jun 2015
D1503382-v2 Type B Prototype Cabling Mark Barton et al. KAGRA
Suspensions
31 May 2015
T1402332-v3 Beam Jitter Requirements for PSL Beam Yuta Michimura KAGRA
MC
Interferometer Sensing and Control
12 Mar 2015
T1403040-v0 Procedure for Installation of Type B Prototype at TAMA Mark Barton KAGRA
Suspensions
04 Dec 2014
G1402356-v1 Report of cryogenic payload for PAB 20140423 Toshikazu Suzuki Reviews
KAGRA
Cryogenic
22 Apr 2014
T1402265-v1 Design features of the KAGRA seismic attenuation system. Riccardo DeSalvo KAGRA
Seismic Isolation
19 Mar 2014
T1402264-v1 Mirror suspensions hierarchy for beam splitter and recyclers Riccardo DeSalvo Suspensions
KAGRA
19 Mar 2014
G1301941-v1 The latest status of KAGRA cryogenics v.2 Nobuhiro Kimura KAGRA
Cryogenic
Conference
23 Oct 2013
G1301899-v1 Status of Cryogenics for domestic f2f 20131009 Toshikazu Suzuki Cryogenic
KAGRA
KAGRA meeting
09 Oct 2013
T1301703-v1 Seismic Spectra in Kamioka Mine (6 days from 28/5/2010) Takanori Sekiguchi Seismic Isolation
KAGRA
19 Jun 2013
G1301683-v1 Neutron Star Mass Distribution in Binaries Chang-Hwan Lee Theory
Workshop
11 Jun 2013
D1201181-v4 type-B suspension drawings Riccardo DeSalvo Suspensions
KAGRA
08 Apr 2013
T1301588-v1 Construction of Type-B seismic attenuation chain and Mirror assembly tooling Riccardo DeSalvo Suspensions
KAGRA
27 Mar 2013
G1301555-v2 Mirror quality and interferometer performance Hiroaki Yamamoto Optics
KAGRA
07 Mar 2013
D1301485-v1 assembly and transport toolings for type a and B SAS Riccardo DeSalvo Seismic Isolation
KAGRA
17 Jan 2013
T1201320-v1 Minutes of discussion following on cryogenic suspensions meeting of Oct. 10th Riccardo DeSalvo KAGRA
System Engineering
12 Oct 2012
T1201317-v1 Summary of Oct. 11th meeting on cryogenic suspensions. Riccardo DeSalvo Suspensions
KAGRA
12 Oct 2012
G1201302-v3 Simulation for KAGRA cryogenic payload: vibration via heat links and thermal noise Takanori Sekiguchi KAGRA
Suspensions
Workshop
02 Oct 2012
G1201247-v2 Cryogenic Suspension for KAGRA and Suspension Thermal Noise Issues Takanori Sekiguchi KAGRA
Suspensions
Workshop
21 Aug 2012
G1201101-v5 Proposal: Composite mirror suspensions Riccardo DeSalvo Cryogenic
KAGRA
KAGRA meeting
31 Jul 2012
G1201180-v1 photos of assembly of type-B suspensions Riccardo DeSalvo Suspensions
KAGRA
27 Jul 2012
T1201108-v1 Transmission Monitoring Telescope Strawman design; Discussion of June 14-2012 Riccardo DeSalvo Interferometer Sensing and Control
KAGRA
15 Jun 2012
T1201013-v3 Strawman design Riccardo DeSalvo KAGRA
Interferometer
26 Apr 2012
T1201016-v1 AOS telescope design on KAGRA-ATC collaboration meeting Shigeo Nagano KAGRA
23 Apr 2012
T1100750-v1 CSIROでの打ち合わせ(議事録) Eiichi Hirose KAGRA
Optics
15 Dec 2011
G1100716-v2 Thermal Noise in the Test Mass Suspension with Variable-Thickness Fibers Takanori Sekiguchi KAGRA
Suspensions
29 Nov 2011
T1100637-v5 Recycler and Beam Splitter mirror suspension assembly sequence Riccardo DeSalvo Suspensions
KAGRA
11 Nov 2011
D1100673-v1 Recycler mirror 3D models Riccardo DeSalvo KAGRA
Suspensions
08 Nov 2011
T1100638-v1 Inverted Pendulum levelling Hydraulic piston tests and procedures Riccardo DeSalvo Seismic Isolation
KAGRA
26 Oct 2011
G1100547-v1 LCGT cryogenics Toshikazu Suzuki KAGRA F2F
KAGRA
Cryogenic
04 Aug 2011
D1100444-v1 redlines of the top filter prototypes Riccardo DeSalvo Seismic Isolation
KAGRA
06 Jun 2011
G1100442-v1 Refrigerator and Cryostat Design for LCGT Nobuhiro Kimura GWADW
KAGRA
Cryogenic
27 May 2011
G1100437-v4 Present Design of LCGT Cryogenics Payload Nobuhiro Kimura Cryogenic
KAGRA
GWADW
24 May 2011
G1000113-v1 LCGTにおけるシリコンミラー検討 Yoichi Aso KAGRA
KAGRA F2F
Optics
14 Jun 2010
P1000087-v1 Study of pendulum thermal noise in gravitational wave detectors Kazuhiro Agatsuma Thesis
CLIO
Interferometer
13 Apr 2010
G1000062-v1 Study of pendulum thermal noise in gravitational wave detectors Kazuhiro Agatsuma Others
Suspensions
CLIO
24 Jan 2010
G0900051-v1 低温レーザー干渉計CLIO(22) Kazuhiro Agatsuma CLIO
Conference
Suspensions
13 Sep 2009
D0900050-v1 低温レーザー干渉計CLIO(22) Kazuhiro Agatsuma Suspensions
CLIO
Conference
12 Sep 2009
G0800046-v1 Thermal Noise of Pendulum from Coil-Magnet Actuator in CLIO Kazuhiro Agatsuma Conference
CLIO
Suspensions
06 Sep 2009
T0800045-v1 Thermal Noise of Coil-Magnet Actuator Kazuhiro Agatsuma Suspensions
CLIO
06 Sep 2009
Number of documents found: 117

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 3 wallclock secs ( 1.24 usr + 0.17 sys = 1.41 CPU)