Document List by Author

DocDB Home ]  [ Search ] [ Recent Changes ]

Nobuhiro Kimura of High Energy Accelerator Research Organization is listed as an author on the following documents:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G2214440-v1 The KAGRA Vacuum and Cryogenic and its upgrades Nobuhiro Kimura KAGRA
Workshop
Vacuum
03 Oct 2022
G2113118-v2 Slides for KGAR external review Nobuhiro Kimura External Review
Cryogenic
KAGRA
20 Jul 2021
G2112930-v2 The cooling scenario for O4 without frosting  on the surface of the KAGRA Test Mass and …. Nobuhiro Kimura GWADW
Cryogenic
KAGRA
20 May 2021
G1911077-v2 For cooling down; the risk and process Nobuhiro Kimura Cryogenic
KAGRA F2F
KAGRA
04 Dec 2019
G1910497-v1 Duct Cryocooler maintenance Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
29 Jul 2019
E1808952-v4 Present condition of the EXC, IXC and others Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
03 Sep 2018
G1808321-v1 20180528-Chife-meeting-VAC Nobuhiro Kimura KAGRA
Vacuum
KAGRA meeting
28 May 2018
G1605903-v1 Results of the performance test of the Y-end cryostat Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
05 Dec 2016
G1605824-v2 20161107-拡大チーフ会議資料(低温-CRY) Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
07 Nov 2016
E1104670-v1 Toshiba-Clean-room-specification Nobuhiro Kimura JGWC
Others
KAGRA
10 Dec 2015
E1504667-v1 Results of the water quality test at KAGRA tunnel Nobuhiro Kimura Others
KAGRA
JGWC
09 Dec 2015
G1504029-v2 Progress of Cryogenic System Assemble at KAGRA site Nobuhiro Kimura Cryogenic
KAGRA F2F
KAGRA
27 Aug 2015
G1504039-v1 Progress status of Cryogenic System at KAGRA site Nobuhiro Kimura KAGRA
Cryogenic
KAGRA F2F
27 Aug 2015
G1402932-v1 X&Y-end cryostat construction schedule Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
27 Oct 2014
T1402783-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402782-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402781-v1 クライオスタット組立手順案(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402780-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.pdf Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
16 Sep 2014
T1402779-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02.mpp Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
16 Sep 2014
T1402778-v1 KAGRA16-Cryostat-Construction-plan-140914-Rev02-2007.mpp Nobuhiro Kimura Chief meeting
KAGRA
Cryogenic
16 Sep 2014
G1301941-v1 The latest status of KAGRA cryogenics v.2 Nobuhiro Kimura KAGRA
Conference
Cryogenic
23 Oct 2013
G1301938-v1 The latest status of KAGRA cryogenics Nobuhiro Kimura Conference
KAGRA
Cryogenic
21 Oct 2013
G1301908-v2 Cryogenic system for the interferometric cryogenic gravitational wave telescope, KAGRA Nobuhiro Kimura Cryogenic
KAGRA
Seminar
09 Oct 2013
G1301906-v1 Status of the cryogenic system for the interferometric cryogenic gravitational wave telescope, KAGRA Nobuhiro Kimura Cryogenic
KAGRA
Seminar
09 Oct 2013
G1301880-v1 Status of KAGRA Nobuhiro Kimura KAGRA
LVC
02 Oct 2013
G1301726-v2 Progress on the cryogenic system for the interferometric cryogenic gravitational wave telescope, KAGRA Nobuhiro Kimura Cryogenic
KAGRA
Conference
10 Jul 2013
D1201362-v1 figure of cryostat and cryoduct Nobuhiro Kimura Cryogenic
KAGRA
27 Oct 2012
T1201235-v1 F70-He-compressor-manual-E Nobuhiro Kimura Others
KAGRA
Cryogenic
10 Aug 2012
T1201234-v1 F70-He-compressor-manual-J Nobuhiro Kimura Cryogenic
Others
KAGRA
10 Aug 2012
G1100535-v1 Status of the Cryogenics Design Nobuhiro Kimura KAGRA
KAGRA F2F
Cryogenic
03 Aug 2011
D1100462-v1 LCGTクライオスタット総合組立図(参考用) Nobuhiro Kimura Cryogenic
KAGRA
Others
13 Jun 2011
G1100442-v1 Refrigerator and Cryostat Design for LCGT Nobuhiro Kimura GWADW
Cryogenic
KAGRA
27 May 2011
G1100437-v4 Present Design of LCGT Cryogenics Payload Nobuhiro Kimura KAGRA
GWADW
Cryogenic
24 May 2011
M1000091-v1 ICD of Cryostat Subsystem Nobuhiro Kimura et al. Cryogenic
ICD
KAGRA
19 Apr 2010

Number of documents found: 34

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.47 usr + 0.05 sys = 0.52 CPU)