Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
T2416103-v3 In-vac PD/QPD Layout Brainstorming Oct 24, 2024 Yuta Michimura Vacuum
Auxiliary IFO
KAGRA meeting
KAGRA
Interferometer Sensing and Control
30 Oct 2024
G2011555-v4 PRFPMI Noise Budget Report for Commissioning Meeting on Mar 17, 2020 Yuta Michimura KAGRA
Interferometer
23 Jul 2020
G2011694-v1 KAGRA observation run: performance of the Type A suspensions Trozzo Lucia KAGRA
Seismic Isolation
Others
26 May 2020
G1910445-v1 Commissioning and performance of the Signal Recycling suspensions of KAGRA Enzo Tapia Suspensions
KAGRA
Workshop
16 Jul 2019
D1909844-v3 Rack design schematic for OMC1 Yutaro Enomoto et al. Interferometer
Digital Control
Length Sensing and Control
Interferometer Sensing and Control
Circuits
KAGRA
Alignment Sensing and control
System Engineering
Data Acquisition
Calibration
10 Jul 2019
T1809078-v10 *APPROVED* KAGRA Sensitivity for Observation Scenario Paper 2018 Sadakazu Haino et al. KAGRA
30 May 2019
G1909593-v2 Commissioning Status of KAGRA (talk for KIW5) Kiwamu Izumi Alignment Sensing and control
Suspensions
Digital Control
Workshop
KAGRA
Interferometer Sensing and Control
Length Sensing and Control
14 Feb 2019
T1707586-v12 List of RF Cables to Purchase for bKAGRA Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
Circuits
31 Jan 2019
L1909582-v3 Request for tuning RF PD and RF QPD Yuta Michimura Interferometer Sensing and Control
Circuits
KAGRA
24 Jan 2019
T1909573-v2 Definitions for the DRMI commissioning Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
23 Jan 2019
T1809260-v1 Request for circuit: EOM RF Amplifier Yuta Michimura Modulation
Circuits
KAGRA
Interferometer Sensing and Control
13 Nov 2018
D1504460-v5 Handmade RF Distribution Amplifier Top Assembly Yuta Michimura Modulation
Circuits
KAGRA
Interferometer Sensing and Control
27 Oct 2018
T1808343-v2 Definitions for the X arm commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
10 Jun 2018
G1808254-v3 Commissioning of bKAGRA phase-I : Details Kiwamu Izumi KAGRA F2F
Interferometer Sensing and Control
KAGRA
23 May 2018
T1808172-v9 O3 Estimated Sensivitiy for FPMI, PRFPMI and RSE Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
02 May 2018
D1808129-v4 bKAGRA phase 1 LSC cabling Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
Length Sensing and Control
01 May 2018
G1807772-v1 Material for the commissioning meeting on Feb 6 Kiwamu Izumi Seismic Isolation
KAGRA
Interferometer
Suspensions
Alignment Sensing and control
06 Feb 2018
T1807753-v1 Minutes of ALS meeting (2018.Jan.30) Kohei Doi et al. Interferometer
Interferometer Sensing and Control
Length Sensing and Control
KAGRA
31 Jan 2018
G1807659-v2 Summary of the beam position measurement Kiwamu Izumi Vacuum
Optics
KAGRA
Interferometer
16 Jan 2018
T1807652-v1 Notes on the beam layout without the ITMs Kiwamu Izumi KAGRA
Interferometer
13 Jan 2018
G1707573-v2 Material for beam centering brainstorm v2 Kiwamu Izumi Alignment Sensing and control
KAGRA
27 Dec 2017
G1707572-v0 Material for beam centering brainstorm Kiwamu Izumi KAGRA
Alignment Sensing and control
27 Dec 2017
T1707334-v5 Main Interferometer Configuration for Early Phase of bKAGRA Yutaro Enomoto et al. Interferometer
KAGRA
06 Dec 2017
T1706748-v5 Re-considering bKAGRA EOM layout Yutaro Enomoto Interferometer Sensing and Control
KAGRA
Modulation
02 Jun 2017
S1605990-v0 Agilent N5181B MXG X-Series RF Analog Signal Generator Yuta Michimura KAGRA
Circuits
Modulation
26 Dec 2016
G1605903-v1 Results of the performance test of the Y-end cryostat Nobuhiro Kimura Cryogenic
KAGRA
Chief meeting
05 Dec 2016
D1504268-v4 RF Patch Panel for KAGRA Yuta Michimura Interferometer Sensing and Control
KAGRA
14 Nov 2016
T1605493-v2 bKAGRA IMC sideband frequency Yuta Michimura KAGRA
Length Sensing and Control
MC
Modulation
31 Aug 2016
T1503190-v8 RF and AF Cabling Policy for KAGRA ISC Yuta Michimura Interferometer Sensing and Control
Circuits
KAGRA
12 Jan 2016
D1504461-v7 RF Distribution Amplifier Front Panel Kentaro Komori Interferometer Sensing and Control
Circuits
KAGRA
Modulation
05 Nov 2015
E1504464-v1 ASC_AIR Enclosure PEEK insert alignment spacer Kohei Doi KAGRA
04 Nov 2015
D1402631-v4 iKAGRA RF QPD Yoichi Aso KAGRA
11 Jul 2015
T1503390-v1 RF PD Mass Production Request Yoichi Aso KAGRA
10 Mar 2015
S1403016-v3 KAGRA LSC RF PD S_No.(B_No.001) Yoichi Aso KAGRA
Circuits
28 Nov 2014
G1301555-v2 Mirror quality and interferometer performance Hiroaki Yamamoto Optics
KAGRA
07 Mar 2013
T1201106-v1 KAGRA RF PD検討 aLIGO Style Shigenori Hiramatsu Interferometer
Others
Circuits
KAGRA
13 Jun 2012
G1201067-v1 Current status of the collaboration research: Interferometer/Quantum Optics Seiji Kawamura KAGRA
SEO
29 May 2012
T1201013-v3 Strawman design Riccardo DeSalvo KAGRA
Interferometer
26 Apr 2012
T1100631-v1 鏡の形状・曲率半径測定に関する打ち合わせ(110912) Eiichi Hirose Optics
KAGRA
06 Oct 2011
T1100512-v2 Mode matching of the Recycling Cavitiesand the arm cavities of iLCGT Yoichi Aso Interferometer
Others
KAGRA
28 Jul 2011
G1100398-v1 Arm Length Stabilization at the 40m prototype Kiwamu Izumi R&D
Length Sensing and Control
Others
19 Mar 2011
T1100351-v1 LCGT test mass surface specification Hiroaki Yamamoto Optics
KAGRA
12 Feb 2011
G1000189-v1 Baseline Interferometer Status Report Akito Araya KAGRA
KAGRA meeting
Others
27 Sep 2010
G1000148-v1 Current Issues of LCGT Interferometer Design Yoichi Aso Alignment Sensing and control
Interferometer
KAGRA
Interferometer Sensing and Control
Length Sensing and Control
09 Aug 2010
T1000065-v1 Study report on LCGT interferometer observation band collaboration LCGT Detector
Policies
Executive Office
Management
KAGRA
Reviews
06 Feb 2010
G0900047-v1 Cryogenic Laser Interferometer Observatory CLIO (20) Kazuhiro Agatsuma Laser
CLIO
Conference
Interferometer
06 Sep 2009
T0800044-v1 CLIO RF intensity noise Kazuhiro Agatsuma Laser
Interferometer
CLIO
06 Sep 2009
Number of documents found: 47

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.43 usr + 0.05 sys = 0.48 CPU)