JGW-D1808129-v4
[
DocDB Home
] [
Search
] [
Recent Changes
]
bKAGRA phase 1 LSC cabling
Document #:
JGW-D1808129-v4
Document type:
D
Submitted by:
Kiwamu Izumi
Updated by:
Kiwamu Izumi
Document Created:
04 Apr 2018, 06:19
Contents Revised:
01 May 2018, 16:34
DB Info Revised:
01 May 2018, 16:34
Viewable by:
Public document
JGW-D1808129-v4
Modifiable by:
admin
kagra
Other Versions:
JGW-D1808129-v3
01 May 2018, 16:31
JGW-D1808129-v2
05 Apr 2018, 06:10
JGW-D1808129-v1
05 Apr 2018, 05:29
JGW-D1808129-v0
04 Apr 2018, 06:19
Abstract:
This is a note for the cabling configuration for the length sensing and control (LSC) system that will be used during phase 1 of bKAGRA. This configuration is temporary and will be removed at some point after phase 1.
Files in Document:
D1808129_LSCcabling_phase1_v4.pdf
(63.5 kB)
Other Files:
D1808129_LSCcabling_phase1_v4.graffle.zip
(18.6 kB)
Topics:
Activity
:
KAGRA
Detector
:
Interferometer Sensing and Control
Detector
:
Interferometer Sensing and Control
:
Length Sensing and Control
Authors:
Yutaro Enomoto
Kiwamu Izumi
Masayuki Nakano
Keywords:
KAGRA
bKAGRA
MIF
LSC
cable
RF
Notes and Changes:
fixed some minor typo
Referenced by:
JGW-D1808394:
ISC system circuit diagram (old title: ALS system circuit diagram)
[
DocDB Home
] [
Search
] [
Recent Changes
]
DocDB
Version 8.7.10, contact
Document Database Administrators