Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
S1605841-v8 RF Distribution Amplifier Chassis S_No.003 Nariyasu Sugawara Circuits
KAGRA
17 Nov 2016
S1605840-v1 RF Distribution Amplifier Chassis S_No.002 Nozomi Kagawa Circuits
KAGRA
17 Nov 2016
E1807769-v0 Document Tree for Arm Length Stabilization System Kiwamu Izumi et al. Interferometer Sensing and Control
KAGRA
30 Jun 2021
T2112949-v5 Notes on IMMT1,2 Transmission Yuta Michimura Laser
KAGRA
Auxiliary IFO
MC
28 Jun 2021
T2112592-v6 Summary of Current Situation of In-vacuum Steering Mirrors Yuta Michimura KAGRA
Optics
Interferometer Sensing and Control
Interferometer
15 Jun 2021
G2112896-v3 Introduction to MIF (Main Interferometer) and IOO (Input and Output Optics) Groups etc. Yuta Michimura et al. KAGRA
Interferometer
14 May 2021
D1402607-v2 KAGRA用光学定盤の高さ Yuta Michimura KAGRA meeting
Interferometer Sensing and Control
Optics
KAGRA
06 Apr 2021
T2112603-v3 Conceptual Design of Optical Table Cover for IMC Yuta Michimura MC
Interferometer
KAGRA
14 Mar 2021
T1910352-v6 On the effect of arm cavity finesse asymmetry to O3 sensitivity Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
25 Jun 2019
T1910129-v4 Conceptual Design of Optical Table Cover Yuta Michimura KAGRA
Interferometer
23 May 2019
G1910090-v2 Status of Input Optics@22thF2F Keiko Kokeyama KAGRA
KAGRA F2F
Optics
05 May 2019
G1910069-v2 How to be a superhero in interferometric gravitational wave detection Yuta Michimura KAGRA
Interferometer
KAGRA F2F
18 Apr 2019
T1909937-v2 How to deal with thick OSTM with wrong coating Yuta Michimura KAGRA
Optics
Interferometer
Interferometer Sensing and Control
01 Apr 2019
T1909618-v7 Cartoon of AS Port Yuta Michimura et al. KAGRA
Interferometer Sensing and Control
23 Feb 2019
T1809211-v12 EOM RF Amplifier Plan Kiwamu Izumi et al. Modulation
Circuits
KAGRA
07 Feb 2019
T1707586-v12 List of RF Cables to Purchase for bKAGRA Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
Circuits
31 Jan 2019
T1809260-v1 Request for circuit: EOM RF Amplifier Yuta Michimura KAGRA
Modulation
Interferometer Sensing and Control
Circuits
13 Nov 2018
T1809210-v2 Request for circuit: Common Mode Servo Board Yutaro Enomoto et al. Modulation
Interferometer
MC
Circuits
KAGRA
29 Oct 2018
D1504460-v5 Handmade RF Distribution Amplifier Top Assembly Yuta Michimura KAGRA
Interferometer Sensing and Control
Modulation
Circuits
27 Oct 2018
T1605626-v3 ALS Sideband Frequency Yuta Michimura Interferometer Sensing and Control
KAGRA
15 Oct 2018
T1807771-v3 Schematic of Arm Length Stabilization System Yuta Michimura Interferometer Sensing and Control
Auxiliary IFO
KAGRA
27 Aug 2018
D1808336-v1 (Tried to make a) bKAGRA ISC Cabling Diagram Yuta Michimura KAGRA
Circuits
Interferometer
Interferometer Sensing and Control
31 May 2018
D1503189-v7 bKAGRA PSL EOM Layout Yuta Michimura KAGRA
Modulation
Interferometer Sensing and Control
30 May 2018
D1808155-v2 1 inch disc to attach mirror with piezoelectric transducer Yuta Michimura Modulation
Interferometer
KAGRA
18 Apr 2018
T1808093-v1 Measuring the Schnupp asymmetry in a simple Michelson interferometer Kiwamu Izumi et al. KAGRA
Length Sensing and Control
Interferometer Sensing and Control
Interferometer
20 Mar 2018
L1808047-v1 Proposal for updating PSL layout Yuta Michimura KAGRA
Modulation
Interferometer Sensing and Control
15 Mar 2018
T1807775-v5 Interferometer Layout for Both IR and Green Beams, With and Without ITMs Yuta Michimura Auxiliary IFO
Interferometer
KAGRA
07 Mar 2018
L1707441-v2 Report of the ISS review on Nov. 21, 2017 Yoichi Aso et al. Laser
Reviews
22 Nov 2017
G1707422-v1 Review of initial alignment from the point of view of Type-C Naoko Ohishi KAGRA
Suspensions
15 Nov 2017
E1707416-v1 ALS meeting material (2017.Nov.13) Kohei Doi et al. Length Sensing and Control
KAGRA
14 Nov 2017
D1402984-v13 iKAGRA ISC Cabling Diagram Yuta Michimura KAGRA
Modulation
Interferometer Sensing and Control
MC
13 Oct 2017
D1402986-v20 KAGRA ISC Electrical Components Layout Yuta Michimura Interferometer Sensing and Control
Modulation
MC
KAGRA
11 Sep 2017
T1706953-v3 Cartoon of the optical layout around IMC, IFI and IMM Yuta Michimura KAGRA
Interferometer Sensing and Control
18 Jul 2017
T1605692-v9 Commissioning Procedure for bKAGRA Phase 1 Yuta Michimura Cryogenic
KAGRA
Interferometer
Vacuum
12 Jun 2017
T1605986-v2 Request for circuit: Optical Lever QPD Amplifier Yuta Michimura Circuits
KAGRA
26 Dec 2016
T1605839-v2 Request for circuit: Universal Whitening Filter with DC Power Yuta Michimura KAGRA
Circuits
26 Dec 2016
S1605990-v0 Agilent N5181B MXG X-Series RF Analog Signal Generator Yuta Michimura Circuits
Modulation
KAGRA
26 Dec 2016
T1605353-v12 Arm Length Stabilizaton Conceptual Design Yuta Michimura Interferometer Sensing and Control
Length Sensing and Control
KAGRA
16 Dec 2016
T1605846-v0 Installation Procedure for IMC REFL Optical Table Yuta Michimura KAGRA
Optics
Infrastructure
16 Nov 2016
D1504268-v4 RF Patch Panel for KAGRA Yuta Michimura KAGRA
Interferometer Sensing and Control
14 Nov 2016
T1605595-v12 Interferometer design for bKAGRA Phase 1 and Beyond Yuta Michimura Interferometer Sensing and Control
KAGRA
26 Sep 2016
T1605493-v2 bKAGRA IMC sideband frequency Yuta Michimura KAGRA
Modulation
Length Sensing and Control
MC
31 Aug 2016
G1605563-v4 KAGRA MIF Status Report (F2F Aug 26, 2016) Yuta Michimura Interferometer
KAGRA F2F
KAGRA
26 Aug 2016
T1605491-v1 Request for circuit: Common Mode Servo Board Yuta Michimura Circuits
KAGRA
09 Aug 2016
T1605489-v1 Request for circuit: High Power Coil Driver Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605490-v1 Request for circuit: RF Distribution Amplifier Yuta Michimura Circuits
KAGRA
09 Aug 2016
T1605488-v1 Request for circuit: Quad IQ Demodulator ASC Yuta Michimura KAGRA
Circuits
09 Aug 2016
T1605487-v1 Request for circuit: Quad IQ Demodulator LSC Yuta Michimura Circuits
KAGRA
09 Aug 2016
T1503547-v5 bKAGRA PSL Design Study Yuta Michimura Laser
KAGRA
Interferometer Sensing and Control
Modulation
22 Jul 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura Chief meeting
MC
Interferometer
Interferometer Sensing and Control
KAGRA
13 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura Interferometer Sensing and Control
Chief meeting
Vacuum
MC
Suspensions
KAGRA
Laser
22 Apr 2016
G1605000-v5 重力波望遠鏡KAGRAにおける主干渉計制御 Yuta Michimura JPS
KAGRA
Interferometer Sensing and Control
22 Mar 2016
G1605019-v1 Development of input optics for KAGRA Shogo Kambara MC
KAGRA
JPS
21 Mar 2016
T1604823-v10 Initial Alignment Procedure for iKAGRA Yuta Michimura Vacuum
Interferometer
KAGRA
01 Mar 2016
T1503190-v8 RF and AF Cabling Policy for KAGRA ISC Yuta Michimura Interferometer Sensing and Control
Circuits
KAGRA
12 Jan 2016
D1403028-v12 Cable Lengths for iKAGRA ISC Yuta Michimura Circuits
KAGRA
06 Nov 2015
D1504461-v7 RF Distribution Amplifier Front Panel Kentaro Komori Circuits
Interferometer Sensing and Control
Modulation
KAGRA
05 Nov 2015
D1504240-v9 Breakout Cable for TTFSS Interface Yuta Michimura KAGRA
Circuits
Interferometer Sensing and Control
16 Oct 2015
G1504215-v2 iKAGRA ISC Analog Electronics Readiness Status Yuta Michimura KAGRA
Circuits
KAGRA meeting
Interferometer Sensing and Control
07 Sep 2015
G1504030-v3 KAGRA MIF Status Report (F2F Aug 27, 2015) Yuta Michimura KAGRA F2F
Interferometer Sensing and Control
KAGRA
27 Aug 2015
T1503330-v1 KAGRA Frequency Stabilization Servo Modeling Report (preliminary) Yuta Michimura Interferometer Sensing and Control
Length Sensing and Control
MC
KAGRA
Laser
03 Jun 2015
G1503582-v3 KAGRA MIF Status Report (May 26, 2015) Yuta Michimura Interferometer Sensing and Control
KAGRA meeting
Suspensions
KAGRA
26 May 2015
T1503387-v4 Production request for RF QPD Interface Yoichi Aso et al. Circuits
Interferometer Sensing and Control
KAGRA
30 Mar 2015
T1503388-v1 Production request for RF PD Interface Yoichi Aso et al. KAGRA
Interferometer Sensing and Control
Circuits
30 Mar 2015
D1503389-v6 Intensity Stabilization Servo Plan Yuta Michimura Circuits
Interferometer Sensing and Control
KAGRA
27 Mar 2015
T1503395-v6 Noise Requirement for IMC QPDs Yuta Michimura Interferometer Sensing and Control
MC
Alignment Sensing and control
KAGRA
13 Mar 2015
T1402332-v3 Beam Jitter Requirements for PSL Beam Yuta Michimura MC
Interferometer Sensing and Control
KAGRA
12 Mar 2015
T1503386-v2 Production request for DC QPD Yoichi Aso et al. KAGRA
Interferometer Sensing and Control
Circuits
09 Mar 2015
G1503267-v3 New iKAGRA Configuration Yuta Michimura Interferometer Sensing and Control
KAGRA F2F
KAGRA
06 Feb 2015
T1503255-v5 Modification Plan for Common Mode Servo Board Yuta Michimura KAGRA
MC
Interferometer Sensing and Control
Modulation
23 Jan 2015
D1403111-v2 Differential or Single-Ended, Which Should We Use for FSS Yuta Michimura Interferometer Sensing and Control
Circuits
KAGRA
16 Dec 2014
D1403033-v5 Extra Cable Racks We Need for IOO+MIF+VIS+AOS Yuta Michimura Infrastructure
Circuits
KAGRA
04 Dec 2014
T1402913-v7 Requirements for IMC Mirror Placement Yuta Michimura KAGRA
Interferometer Sensing and Control
20 Nov 2014
T1402941-v3 Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura KAGRA
Interferometer Sensing and Control
MC
31 Oct 2014
D1402908-v3 IMC Servo Topology Yuta Michimura KAGRA
KAGRA meeting
Interferometer Sensing and Control
MC
30 Oct 2014
D1402519-v8 Optical/Electrical Components Needed for iKAGRA IMC Servo Yuta Michimura Alignment Sensing and control
Seismic Isolation
KAGRA
Interferometer Sensing and Control
MC
Length Sensing and Control
04 Aug 2014
T1402349-v3 Study on iKAGRA PMC Yuta Michimura MC
KAGRA
Laser
19 Apr 2014
G1402319-v3 新潟大学IMC WFS打ち合せ資料 Yuta Michimura MC
Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
18 Apr 2014
G1201429-v1 Toyama Univ. IOO meeting Souichi Telada KAGRA
Others
Optics
14 Dec 2012
G1201428-v1 Niigata Univ. IOO meeting Souichi Telada Optics
Others
KAGRA
14 Dec 2012
G1201156-v1 IOO presentation for Toyama Univ. and KAGRA Workshop on July 7 2012 Souichi Telada MC
Collaboration meeting
Optics
KAGRA
09 Jul 2012
T1200846-v1 f2f meeting 201202013 IOO Souichi Telada KAGRA F2F
Optics
KAGRA
02 Feb 2012
M1200801-v1 Internal Review IOO on 24th Jan. 2012 Souichi Telada Reviews
MC
KAGRA
24 Jan 2012
G1100539-v1 IOO report for f2f 110805 Souichi Telada KAGRA F2F
MC
Optics
KAGRA
03 Aug 2011
Number of documents found: 84

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.57 usr + 0.06 sys = 0.63 CPU)