JGW-Number
|
Title
|
Author(s)
|
Topic(s)
|
Last Updated
|
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
T1807753-v1 | Minutes of ALS meeting (2018.Jan.30) | Kohei Doi et al. | Interferometer Sensing and Control Length Sensing and Control KAGRA Interferometer |
31 Jan 2018 | ||||||||||
E1707416-v1 | ALS meeting material (2017.Nov.13) | Kohei Doi et al. | KAGRA Length Sensing and Control |
14 Nov 2017 | ||||||||||
G1707130-v1 | Status of PLL system of ALS | Shogo Kambara | KAGRA F2F Laser KAGRA |
30 Aug 2017 | ||||||||||
G1707060-v2 | Green systemの現状@拡大チーフ会議 | Shogo Kambara | Optics KAGRA Chief meeting |
21 Aug 2017 | ||||||||||
G1707059-v1 | グリーンシステムの現状@拡大チーフ会議 | Shogo Kambara | Optics KAGRA Chief meeting |
21 Aug 2017 | ||||||||||
T1605572-v1 | A study of Arm Length Stabilization in KAGRA | Shogo Kambara | KAGRA F2F Laser KAGRA |
26 Aug 2016 | ||||||||||
L1605485-v4 | ノイズバジェット合宿@安東研 | Shogo Kambara | Collaboration meeting Optics KAGRA |
08 Aug 2016 | ||||||||||
S1605229-v1 | Installation of Input mode cleaner of iKAGRA | Shogo Kambara | GWADW KAGRA MC |
21 May 2016 | ||||||||||
G1605019-v1 | Development of input optics for KAGRA | Shogo Kambara | KAGRA JPS MC |
21 Mar 2016 |
Number of documents found: 9
DocDB Version 8.7.10, contact
Document Database Administrators
Execution time: 0 wallclock secs ( 0.34 usr + 0.03 sys = 0.37 CPU)