Document List by Group

DocDB Home ]  [ Search ] [ Recent Changes ]

These documents for admin are available:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
P1910539-v6 [Draft] An arm length stabilization system with vertex injection of auxiliary lasers: a new scheme scalable to longer-baseline gravitational wave detectors Yutaro Enomoto Interferometer Sensing and Control
KAGRA
02 Oct 2019
G1910388-v1 Polarization issue in the central IFO Yutaro Enomoto Chief meeting
KAGRA
05 Jul 2019
G1910262-v1 Status of the frequency dependent squeezing experiment at TAMA Yuhang Zhao Detector
GWADW
TAMA
28 May 2019
G1910250-v2 Errors not to be made again; the beauty of hindsights: a discussion of mis-steps in KAGRA Tomotada Akutsu GWADW
KAGRA
24 May 2019
G1910211-v3 Topics on Commissioning of KAGRA Yutaro Enomoto GWADW
Interferometer Sensing and Control
KAGRA
Modulation
22 May 2019
T1909661-v0 Harmonic Generator Modification Plan Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
Modulation
Circuits
06 Feb 2019
G1910156-v2 KSC report @ Program Advisory Board Review 2019 (May 9, 2019 @ Kashiwa) Hisaaki Shinkai Organization
01 May 2019
G1909902-v1 CDS Meeting (20190227) Takahiro Yamamoto KAGRA meeting
Data Acquisition
KAGRA
28 Feb 2019
G1909568-v4 Status of KAGRA: Recent progress towards O3 and future plans Yuta Michimura KAGRA
Conference
12 Jan 2019
G1809361-v1 Engineering Management for KAGRA upgrade Yoichi Aso KAGRA
03 Dec 2018
D1707077-v4 SR3 assy in vacuum chamber Yoichi Aso et al. Seismic Isolation
KAGRA
Others
30 Nov 2018
G1808924-v1 Report from the IBR meeting, conclding remark Takaaki Kajita IBR
KAGRA
28 Aug 2018
G1808719-v2 Fast localization with a heterogeneous network of gravitational wave detectors Yoshinori Fujii KAGRA F2F
Data Analysis
19 Aug 2018
T1808750-v1 [confidential] Data sheets for the green fibers for the ALS Kiwamu Izumi Interferometer Sensing and Control
KAGRA
21 Aug 2018
G1808425-v2 Commissioning works for KAGRA Osamu Miyakawa KAGRA
29 Jun 2018
G1808373-v1 KAGRAで回路を使うにあたって Osamu Miyakawa KAGRA
Circuits
14 Jun 2018
D1707397-v3 Chain SR3 Mark Barton et al. Seismic Isolation
KAGRA
Others
20 May 2018
G1707427-v1 LIGO-KAGRA CDS Meeting Takahiro Yamamoto Digital Control
Data Acquisition
16 Nov 2017
L1707146-v0 Minutes of the 17th KAGRA Face to Face Meeting (Aug 28-30, 2017) Yuta Michimura KAGRA F2F
KAGRA
04 Sep 2017
G1706736-v1 AELでの仕事 Osamu Miyakawa KAGRA
Circuits
19 May 2017
T1605846-v0 Installation Procedure for IMC REFL Optical Table Yuta Michimura KAGRA
Optics
Infrastructure
16 Nov 2016
M1201022-v4 KAGRA_Collaboration1304_j Shinji Miyoki Others
KAGRA
Organization
04 Nov 2016
G1605393-v4 iKAGRA 観測におけるデータ転送・保管システムの運用と性能評価 Kazuki Sakai Data Acquisition
KAGRA
JPS
21 Sep 2016
M1100356-v2 AGREEMENT ON ACADEMIC EXCHANGE BETWEEN THE INSTITUTE FOR COSMIC RAY RESEARCH THE UNIVERSITY OF TOKYO AND EUROPEAN GRAVITATIONAL OBSERVATORY/THE VIRGO COLLABORATION collaboration LCGT MOU
30 Aug 2016
M1503931-v1 国立大学法人東京大学宇宙線研究所と国立大学法人富山大学大学院理工学教育部、理学部、工学部及び大学院理工学研究部との重力波研究推進のための教育・研究協力に関する覚え書き Takaaki Kajita KAGRA
MOU
06 Aug 2015
M1503930-v1 4th extension of MOU among ICRR, NAO and KEK Takaaki Kajita KAGRA
MOU
06 Aug 2015
M1503929-v1 東京大学宇宙線研究所とカリフォルニア工科大学LIGO研究所との間における学術交流に関する協定書に関する修正1 Takaaki Kajita KAGRA
MOU
06 Aug 2015
T1402845-v4 KAGRA緊急連絡先 Naoko Ohishi Others
KAGRA
Safety
17 Oct 2014
G1402860-v0 DGS & AEL report for KAGRA domestic collaboration meeting Shinji Miyoki KAGRA meeting
Digital Control
KAGRA
Circuits
Domestic
15 Oct 2014
M0702424-v2 MOU among ICRR, NAO and KEK Takaaki Kajita MOU
23 May 2014
M1000274-v1 Attachment to the MOU between ICRR and LIGO Kazuaki Kuroda MOU
08 May 2014
G1301773-v1 KAGRA AOS f2f status report (20130802) Tomotada Akutsu KAGRA F2F
KAGRA
Auxiliary IFO
01 Apr 2014
T1301998-v0 Status Report on Nov.19th, Modeling of Type-A Vibration Isolation System Takanori Sekiguchi Cryogenic
Seismic Isolation
KAGRA
Suspensions
19 Nov 2013
G1301851-v1 Real Time Control for KAGRA 3km Cryogenic Gravitational Wave Detector in Japan Osamu Miyakawa International
Digital Control
KAGRA
Conference
15 Oct 2013
G1301660-v2 Lessons from commissioning cryogenic systems underground Osamu Miyakawa GWADW
KAGRA
21 May 2013
D1200900-v2 Rack Layout for Standalone Digital System at Kamioka branch Osamu Miyakawa Digital Control
KAGRA
06 Mar 2013
D1100404-v0 Network diagram of standalone Real-Time system at Kamioka Osamu Miyakawa Digital Control
KAGRA
28 Mar 2011
G1201206-v1 DGS and AEL report for KAGRA f2f meeting on 7/31/2012 Osamu Miyakawa Digital Control
KAGRA F2F
KAGRA
Circuits
15 Sep 2012
G1200792-v2 Internal Review for Digital system subgroup Osamu Miyakawa Reviews
Digital Control
KAGRA
13 Mar 2012
G1200863-v2 Reduction of thermal radiation through a shield pipe for KAGRA Yusuke Sakakibara KAGRA meeting
Cryogenic
KAGRA
07 Feb 2012
G1200807-v3 Internal review of detector characterization Kazuhiro Hayama Reviews
Data Acquisition
KAGRA
09 Feb 2012
G1100610-v1 LCGTと他の検出器を用いた背景重力波探索の検討 Hirotaka Yuzurihara KAGRA
JPS
Data Analysis
22 Sep 2011
G1100529-v2 Status of International Collaboration Kazuaki Kuroda KAGRA F2F
MOU
03 Aug 2011
G1100528-v1 Project Status Ichiro Nakatani SEMP
Management
02 Aug 2011
M1000171-v3 Guideline of the membership of LCGT Collaboration Kazuaki Kuroda Executive Office
Management
KAGRA
13 Dec 2010
G1000133-v2 Report from management group Takaaki Kajita et al. KAGRA meeting
KAGRA
Policies
19 Jul 2010

Number of documents found: 46

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 5 wallclock secs ( 2.20 usr + 0.41 sys = 2.61 CPU)