Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
G2415806-v1 Abstract withdrawn Yuta Michimura Data Analysis
Conference
18 Jul 2024
P2113400-v4 Ultralight dark matter searches with KAGRA gravitational wave telescope (Proceedings for TAUP2021) Yuta Michimura et al. Conference
Data Analysis
KAGRA
31 Oct 2021
G2113058-v6 Ultralight dark matter searches with KAGRA gravitational wave telescope (TAUP2021) Yuta Michimura et al. KAGRA
Data Analysis
Conference
28 Oct 2021
T2113073-v5 TMS polarization monitor plan Yuta Michimura et al. KAGRA
Auxiliary IFO
Interferometer Sensing and Control
Interferometer
13 Jul 2021
T1910189-v3 BS and SR TM optical lever (oplev) diagonalization matrix Tak Lun Terrence Tsang Suspensions
KAGRA
03 May 2021
T2112600-v4 Conceptual Design of Optical Table Cover for TRX and TRY Yuta Michimura Auxiliary IFO
KAGRA
Interferometer
05 Mar 2021
G2012371-v5 Discussion on exotic science using KAGRA Yuta Michimura KAGRA
KAGRA meeting
19 Dec 2020
E1808952-v4 Present condition of the EXC, IXC and others Nobuhiro Kimura Cryogenic
Chief meeting
KAGRA
03 Sep 2018
T1808397-v1 Request for modifying the satellite amplifier boards Kiwamu Izumi Seismic Isolation
Suspensions
KAGRA
19 Jun 2018
G1808352-v2 Proposal for modification of the satellite box Kiwamu Izumi Seismic Isolation
Interferometer Sensing and Control
Cryogenic
KAGRA
15 Jun 2018
T1808388-v1 Notes on capacitor precision for satellite amplifier board Kiwamu Izumi Suspensions
KAGRA
Circuits
Seismic Isolation
Interferometer Sensing and Control
Cryogenic
15 Jun 2018
T1807770-v1 Systematic error in an optical lever due to air/vacuum refractive index Kiwamu Izumi Interferometer
Alignment Sensing and control
Optics
KAGRA
Suspensions
03 Feb 2018
E1504443-v1 PR Suspension Part and Fastener List Mark Barton KAGRA
Suspensions
27 Oct 2015
D1503617-v2 EXA Suspension Cabling Mark Barton KAGRA
Suspensions
08 Oct 2015
G1402932-v1 X&Y-end cryostat construction schedule Nobuhiro Kimura KAGRA
Cryogenic
Chief meeting
27 Oct 2014
T1402783-v1 Cryostat-constraction-plan-for-Company-(EYC-EXC)-20140915-X-Y-end.pdf Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
16 Sep 2014
T1201358-v1 Insrtuctions on how to build a realtime model on the TAMA Linux machines Kiwamu Izumi KAGRA
Digital Control
26 Oct 2012
G1201196-v1 Internal and External Reviews Seiji Kawamura System Engineering
KAGRA
Reviews
15 Sep 2012
G1201009-v1 Main Interferometer External Review 2012 Yoichi Aso Interferometer
Reviews
KAGRA
18 Apr 2012
G1200970-v1 External review Seiji Kawamura KAGRA
Reviews
16 Apr 2012
T1200921-v2 External Review Document of KAGRA Main Interferometer Yoichi Aso KAGRA
Reviews
Interferometer
09 Apr 2012
G1200831-v1 LIGO 2.5 straw man design : given at LCGT f2f Hiroaki Yamamoto R&D
03 Feb 2012
G1200781-v1 Interferometer for LCGT Seiji Kawamura KAGRA
Interferometer
14 Jan 2012
T1100489-v1 Wedge angle error tolerance for core optics Yoichi Aso Others
Auxiliary IFO
KAGRA
Optics
23 Jun 2011
Number of documents found: 24

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.59 usr + 0.05 sys = 0.64 CPU)