Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
T1910359-v1 ASC simulations for O3 SRM transmission, SRC Gouy phase shift and ITM transmission asymmetry Yuta Michimura Alignment Sensing and control
KAGRA
21 Jun 2019
D1503615-v2 PR3 Suspension Cabling (bKAGRA) Mark Barton KAGRA
Suspensions
25 May 2022
G1910351-v1 Current status and future prospects of KAGRA gravitational wave telescope Yuta Michimura KAGRA
Seminar
R&D
17 Jun 2019
T1809078-v10 *APPROVED* KAGRA Sensitivity for Observation Scenario Paper 2018 Sadakazu Haino et al. KAGRA
30 May 2019
P1909567-v2 Master Thesis (Ryohei Kozu) Ryohei Kozu Theory
Thesis
Suspensions
31 Jan 2019
D1809594-v3 Sketch of OpLev setup for SR mirrors Simon Zeidler Optics
KAGRA
Others
19 Jan 2019
G1808874-v1 Lecture 4_b: OPLEV setup for SRM suspensions. Enzo Tapia Seminar
KAGRA
Suspensions
24 Aug 2018
E1808836-v3 SR3 Oplev setup, calibration and diagonalization Enzo Tapia Others
Suspensions
KAGRA
22 Aug 2018
T1808546-v1 Sketch of OpLev setup SR3 Simon Zeidler Others
KAGRA
Optics
30 Jul 2018
G1808317-v1 Material for Extended Chief meeting: Thoughts on inviting foreign experts Kiwamu Izumi Chief meeting
KAGRA
28 May 2018
G1808281-v1 Updates from MIF Subgroup (F2F May 20, 2018) Yoichi Aso et al. KAGRA F2F
Interferometer
Interferometer Sensing and Control
KAGRA
18 May 2018
T1808172-v9 O3 Estimated Sensivitiy for FPMI, PRFPMI and RSE Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
02 May 2018
T1808090-v3 O3 Sky Localization Calculation Comparison between MCMC and Fisher Analysis Yuta Michimura KAGRA
Data Analysis
19 Mar 2018
T1503941-v1 PR2/PR3/PRM First Contact Pattern Mark Barton Optics
Suspensions
KAGRA
03 Sep 2017
E1503830-v11 Procedure for hanging the test and recoil masses Fabian E Pena Arellano KAGRA
Suspensions
02 Dec 2016
E1503840-v2 PR2/PR3/PRM Suspension Final Assembly and Installation Procedure Mark Barton KAGRA
Suspensions
11 Aug 2015
G1201308-v1 Commissioning history of TAMA Masaki Ando Detector
TAMA
Management
05 Oct 2012
D1100709-v2 Specification of PR3 (Power Recycling Mirror 3) for polishing Eiichi Hirose Optics
KAGRA
28 Feb 2012
D1100712-v2 Specification of SR3 (Signal Recycling Mirror 3) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
Number of documents found: 19

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.43 usr + 0.05 sys = 0.48 CPU)