Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
P2214296-v3 Optimizing Active Vibration Isolation Systems in Ground-Based Interferometric Gravitational-Wave detectors Tak Lun Terrence Tsang KAGRA
Thesis
Seismic Isolation
Suspensions
30 Sep 2022
G2112918-v3 [Amaldi14] Optimal Sensor Fusion using H-infinity Methods - Synthesizing Complementary Filters for Active Seismic Noise Isolation Systems in KAGRA Tak Lun Terrence Tsang KAGRA
Suspensions
Seismic Isolation
16 Nov 2021
G2113243-v2 [KAGRA 27th F2F poster] Optimal Sensor Fusion using H-infinity Synthesis Tak Lun Terrence Tsang Seismic Isolation
KAGRA F2F
Suspensions
KAGRA
27 Aug 2021
E1605111-v1 BS Suspension Electronic Items List Mark Barton Suspensions
Circuits
Data Acquisition
KAGRA
18 May 2021
T1808963-v2 Diagonalization of Optical Lever signals for Type B suspensions Tak Lun Terrence Tsang KAGRA
Suspensions
Seismic Isolation
03 May 2021
G2011889-v4 Optimal Control and Optimization for KAGRA Vibration Isolation system Tak Lun Terrence Tsang Suspensions
Management
KAGRA
04 Sep 2020
T2011764-v4 Kontrol: KAGRA Control Python Library for VIS Control Systems Tak Lun Terrence Tsang KAGRA
Management
Suspensions
20 Jun 2020
T2011622-v1 Frequency Dependent Diagonalization Matrices of Payload Actuation for Local Feedback Control Tak Lun Terrence Tsang Suspensions
KAGRA
Management
18 Apr 2020
T2011606-v1 Discussion on VIS Inertial Sensor Sensitivity Requirement for Post-O3 Upgrade Tak Lun Terrence Tsang KAGRA
Others
Seismic Isolation
11 Apr 2020
G1911004-v1 Adaptive Robust Control Systems for KAGRA Vibration Isolation System Tak Lun Terrence Tsang Management
KAGRA
Suspensions
22 Nov 2019
E1706046-v0 SR3 Suspension Electronic Items List Enzo Tapia KAGRA
Data Acquisition
Circuits
Suspensions
08 Aug 2019
D1503600-v16 Type B Suspension Cabling Mark Barton et al. KAGRA
Suspensions
Circuits
16 Jun 2019
G1809265-v3 Commissioning and performance of the beam splitter and signal recycling suspensions for the KAGRA gravitational wave detector. Enzo Tapia Suspensions
KAGRA
JPS
22 Mar 2019
E1706047-v0 SRM Suspension Electronic Items List Mark Barton KAGRA
Suspensions
Circuits
Data Acquisition
20 Mar 2019
G1909832-v3 presentation in 5th KIW (Type B status and master thesis) Ryohei Kozu KAGRA
Workshop
Suspensions
16 Feb 2019
G1909624-v1 Status of KAGRA Type B Suspensions (KIW, 2019-02) Mark Barton et al. KAGRA
Suspensions
15 Feb 2019
E1605886-v0 SR2 Suspension Electronic Items List Mark Barton Data Acquisition
Suspensions
Circuits
KAGRA
05 Feb 2019
P1909567-v2 Master Thesis (Ryohei Kozu) Ryohei Kozu Thesis
Theory
Suspensions
31 Jan 2019
G1808835-v3 VIS Type B SUSs status report in F2F(Aug. 2018) Ryohei Kozu KAGRA
KAGRA F2F
Suspensions
25 Aug 2018
G1808873-v1 Lecture 4: Use of OSEMs for VIS Enzo Tapia Seminar
Suspensions
KAGRA
24 Aug 2018
G1808551-v2 Basic lecture for students 1: VIS Suspensions and digital system. Enzo Tapia KAGRA
Seminar
Suspensions
16 Aug 2018
G1808352-v2 Proposal for modification of the satellite box Kiwamu Izumi Interferometer Sensing and Control
Seismic Isolation
KAGRA
Cryogenic
15 Jun 2018
T1808388-v1 Notes on capacitor precision for satellite amplifier board Kiwamu Izumi Seismic Isolation
Interferometer Sensing and Control
Suspensions
Circuits
KAGRA
Cryogenic
15 Jun 2018
P1707051-v2 Mirror actuation design for the interferometer control of the KAGRA gravitational wave telescope Yuta Michimura Suspensions
Seismic Isolation
Length Sensing and Control
KAGRA
12 Apr 2018
E1706105-v0 Revised geophone cabling Mark Barton Circuits
Suspensions
KAGRA
30 Jan 2017
G1807857-v1 Proposal for organizing the VIS measurements Yutaro Enomoto et al. Others
Organization
KAGRA
Suspensions
System Engineering
Seismic Isolation
14 Feb 2018
E1807703-v1 Proposal for updating the test mass realtime control library Kiwamu Izumi KAGRA
Digital Control
Suspensions
Interferometer
Seismic Isolation
24 Jan 2018
G1807653-v1 Proposal for changing the BS real time model for hierarchical optical lever control Kiwamu Izumi KAGRA
Interferometer
Alignment Sensing and control
15 Jan 2018
T1707429-v2 Summary of the initial alignment closeout meeting Kiwamu Izumi KAGRA
Interferometer
16 Nov 2017
E1504235-v2 BS Installation Procedure Mark Barton KAGRA
Suspensions
13 Aug 2017
D1707018-v1 BS First Contact Pattern Mark Barton Optics
KAGRA
Suspensions
30 Jul 2017
T1503453-v16 Actuator Noise Modeling Report Yuta Michimura KAGRA
Length Sensing and Control
Seismic Isolation
Suspensions
12 Jun 2017
G1706333-v12 重力波望遠鏡KAGRAの低温動作に向けた主干渉計開発 Yuta Michimura KAGRA
Length Sensing and Control
JPS
KAGRA meeting
31 Mar 2017
E1706308-v1 VIS Engineering Change Order Template Yoichi Aso KAGRA
05 Mar 2017
T1605986-v2 Request for circuit: Optical Lever QPD Amplifier Yuta Michimura Circuits
KAGRA
26 Dec 2016
T1605839-v2 Request for circuit: Universal Whitening Filter with DC Power Yuta Michimura Circuits
KAGRA
26 Dec 2016
D1605845-v4 Photo sensor assembly for VIS installation Yoichi Aso KAGRA
19 Nov 2016
E1605760-v2 WDS PCB Design Draft version. Nobuyuki Tanaka KAGRA
10 Nov 2016
G1605667-v1 KAGRA重力波検出器防振系におけるクラックリングノイズの研究(3) Shin Kirii Seismic Isolation
KAGRA
JPS
19 Sep 2016
G1605348-v2 Type B Installation Plan Mark Barton KAGRA
Suspensions
04 Jul 2016
G1605273-v4 VIS presentation for PAB 2016 June Yoichi Aso KAGRA
21 Jun 2016
E1604817-v1 BS Payload Assembly Procedure Mark Barton et al. Suspensions
KAGRA
13 May 2016
T1605106-v0 Wire selection for the optic suspensions of Type B and Type Bp payloads Fabian E Pena Arellano Suspensions
KAGRA
08 Apr 2016
G1604993-v3 KAGRA用防振装置の開発XVIII(制御系) Koki Okutomi Suspensions
KAGRA
JPS
21 Mar 2016
G1604772-v1 KAGRA用防振装置の開発 XVIII(制御系) Koki Okutomi JPS
KAGRA
Suspensions
Seismic Isolation
27 Jan 2016
G1504659-v1 About Company's Cleaning of the Clean Booth Koki Okutomi KAGRA
04 Dec 2015
E1504443-v1 PR Suspension Part and Fastener List Mark Barton Suspensions
KAGRA
27 Oct 2015
T1504420-v1 BS Assembly Frame Concept Mark Barton KAGRA
Suspensions
22 Oct 2015
L1504365-v1 Visiting Report by Kristof Kremer (KAGRA Visitor Program) Yutaka Shikano Digital Control
KAGRA
Others
12 Oct 2015
T1504271-v1 BS Standoffs Mark Barton KAGRA
Suspensions
24 Sep 2015
G1504047-v1 attendance at kagra visitor program Takashi Wakamatsu KAGRA
Data Analysis
KAGRA F2F
28 Aug 2015
E1503840-v2 PR2/PR3/PRM Suspension Final Assembly and Installation Procedure Mark Barton KAGRA
Suspensions
11 Aug 2015
E1503922-v1 VIS Cable Summary Mark Barton Circuits
Suspensions
KAGRA
04 Aug 2015
D1503415-v4 Summary of Suspension Configurations Yuta Michimura KAGRA
Suspensions
Seismic Isolation
24 Jul 2015
D1403033-v5 Extra Cable Racks We Need for IOO+MIF+VIS+AOS Yuta Michimura Infrastructure
Circuits
KAGRA
04 Dec 2014
T1403040-v0 Procedure for Installation of Type B Prototype at TAMA Mark Barton Suspensions
KAGRA
04 Dec 2014
Number of documents found: 56

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 2 wallclock secs ( 0.64 usr + 0.07 sys = 0.71 CPU)