Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
T2112592-v6 Summary of Current Situation of In-vacuum Steering Mirrors Yuta Michimura Interferometer
Interferometer Sensing and Control
KAGRA
Optics
15 Jun 2021
D1808394-v14 ISC system circuit diagram (old title: ALS system circuit diagram) Kiwamu Izumi et al. Interferometer Sensing and Control
KAGRA
03 May 2021
D1909967-v6 ISS Servo Kohei Doi et al. Circuits
KAGRA
02 Nov 2020
G2011694-v1 KAGRA observation run: performance of the Type A suspensions Trozzo Lucia Seismic Isolation
Others
KAGRA
26 May 2020
S1909929-v0 Second Loop ISS Servo Module Kohei Doi KAGRA
Circuits
30 Oct 2019
D1909987-v4 Second Loop ISS Servo Kohei Doi KAGRA
Circuits
06 Sep 2019
G1909954-v1 Commissioning of the typeA suspension control of KAGRA Trozzo Lucia Seismic Isolation
JPS
KAGRA
14 Mar 2019
G1909593-v2 Commissioning Status of KAGRA (talk for KIW5) Kiwamu Izumi Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
Workshop
Suspensions
Length Sensing and Control
Digital Control
14 Feb 2019
D1809404-v1 2nd loop ISS servo IO changer Kohei Doi Circuits
KAGRA
15 Jan 2019
E1909588-v2 PD保護継電器取扱説明書 Kohei Doi KAGRA
Circuits
11 Jan 2019
S1809223-v0 PD保護継電器 Kohei Doi Circuits
KAGRA
02 Nov 2018
S1809224-v0 PD保護継電器 Kohei Doi Circuits
KAGRA
02 Nov 2018
D1809226-v0 PD保護継電器 Kohei Doi KAGRA
Circuits
02 Nov 2018
D1809217-v2 ISS Servo I/O Kohei Doi KAGRA
Circuits
31 Oct 2018
D1809190-v1 ISS High Power PD Kohei Doi Circuits
KAGRA
19 Oct 2018
G1808463-v1 Chief meeting material: ALS schedule Kiwamu Izumi KAGRA meeting
KAGRA
Scheduling
Interferometer Sensing and Control
06 Jul 2018
T1808343-v2 Definitions for the X arm commissioning Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
10 Jun 2018
G1808254-v3 Commissioning of bKAGRA phase-I : Details Kiwamu Izumi Interferometer Sensing and Control
KAGRA F2F
KAGRA
23 May 2018
G1808242-v1 Optical performances and thermal noise measurements of crystalline coatings Raffaele Flaminio et al. GWADW
Optics
R&D
16 May 2018
G1807772-v1 Material for the commissioning meeting on Feb 6 Kiwamu Izumi Interferometer
Alignment Sensing and control
KAGRA
Suspensions
Seismic Isolation
06 Feb 2018
L1707441-v2 Report of the ISS review on Nov. 21, 2017 Yoichi Aso et al. Reviews
Laser
22 Nov 2017
T1707429-v2 Summary of the initial alignment closeout meeting Kiwamu Izumi KAGRA
Interferometer
16 Nov 2017
G1707417-v1 Meeting material: initial alignment closeout meeting, setting the stage Kiwamu Izumi KAGRA
Interferometer
14 Nov 2017
T1707079-v4 MIF Schedule Estimate for bKAGRA Phase 2 Yuta Michimura Interferometer Sensing and Control
KAGRA
06 Sep 2017
G1707104-v3 Selected Commissioning Topics Kiwamu Izumi Optics
Length Sensing and Control
Other Groups
Digital Control
Interferometer
Alignment Sensing and control
KAGRA F2F
Interferometer Sensing and Control
30 Aug 2017
T1301693-v1 Report from the June 2013 Scattering Workshop at GEO Tomotada Akutsu et al. Other Groups
KAGRA
02 Mar 2017
G1605545-v2 Summary of iKAGRA Run Yuta Michimura KAGRA F2F
KAGRA
Interferometer
21 Sep 2016
G1605563-v4 KAGRA MIF Status Report (F2F Aug 26, 2016) Yuta Michimura KAGRA
KAGRA F2F
Interferometer
26 Aug 2016
T1605575-v1 Intensity stabilization sys tem of KAGRA Yusuke Sugimoto Optics
KAGRA
KAGRA F2F
26 Aug 2016
T1503547-v5 bKAGRA PSL Design Study Yuta Michimura Laser
KAGRA
Interferometer Sensing and Control
Modulation
22 Jul 2016
D1503389-v6 Intensity Stabilization Servo Plan Yuta Michimura Circuits
Interferometer Sensing and Control
KAGRA
27 Mar 2015
D1402519-v8 Optical/Electrical Components Needed for iKAGRA IMC Servo Yuta Michimura KAGRA
Interferometer Sensing and Control
Alignment Sensing and control
MC
Seismic Isolation
Length Sensing and Control
04 Aug 2014
G1201308-v1 Commissioning history of TAMA Masaki Ando Detector
Management
TAMA
05 Oct 2012
G1201139-v1 コミッショニングの諸問題 Koji Arai KAGRA meeting
KAGRA
09 Jul 2012
Number of documents found: 34

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.45 usr + 0.05 sys = 0.50 CPU)