Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
E2415857-v1 Proposal for modification of pumping unit between OMMT and OMC Nobuhiro Kimura KAGRA
KAGRA meeting
Vacuum
25 Jun 2024
G2214440-v1 The KAGRA Vacuum and Cryogenic and its upgrades Nobuhiro Kimura KAGRA
Vacuum
Workshop
03 Oct 2022
E1808952-v4 Present condition of the EXC, IXC and others Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
03 Sep 2018
T1807770-v1 Systematic error in an optical lever due to air/vacuum refractive index Kiwamu Izumi Interferometer
Alignment Sensing and control
KAGRA
Suspensions
Optics
03 Feb 2018
T1605692-v9 Commissioning Procedure for bKAGRA Phase 1 Yuta Michimura Cryogenic
KAGRA
Vacuum
Interferometer
12 Jun 2017
T1605385-v1 2nd stories chamber position_July2016 Yoshio Saito KAGRA
Chief meeting
Vacuum
18 Jul 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura MC
KAGRA
Chief meeting
Interferometer Sensing and Control
Interferometer
13 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura Laser
Vacuum
MC
KAGRA
Suspensions
Chief meeting
Interferometer Sensing and Control
22 Apr 2016
G1402932-v1 X&Y-end cryostat construction schedule Nobuhiro Kimura KAGRA
Chief meeting
Cryogenic
27 Oct 2014
T1301549-v1 Top filter pre-isolator tuning/performance evaluation Riccardo DeSalvo Seismic Isolation
KAGRA
21 Feb 2013
G1301520-v1 Status of KAGRA-SAS design, prototyping testing and production February 2013 Riccardo DeSalvo Seismic Isolation
KAGRA
14 Feb 2013
D1201051-v1 Type-A and Type-B SAS vacuum tanks Riccardo DeSalvo KAGRA
Seismic Isolation
17 Jan 2013
D1301484-v0 Tower-B external vacuum and vacuum tank drawings Riccardo DeSalvo KAGRA
Vacuum
17 Jan 2013
T1301483-v1 Finite Element Model analysis of Vacuum tanks for tower B1 and B2 Riccardo DeSalvo Vacuum
KAGRA
17 Jan 2013
D1100470-v6 specifications for Type-B seismic attenuation Riccardo DeSalvo KAGRA
Seismic Isolation
30 Jun 2011
G1100429-v1 LCGT seismic attenuation Riccardo DeSalvo Seismic Isolation
KAGRA
07 May 2011
T1000216-v1 Test Mass Optical Lever Rough Plan Yoichi Aso Vacuum
Others
Interferometer Sensing and Control
KAGRA
27 Oct 2010
Number of documents found: 17

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.41 usr + 0.04 sys = 0.45 CPU)