JGW-G1909593-v1

DocDB Home ]  [ Search ] [ Recent Changes ]

Commissioning Status of KAGRA (talk for KIW5)

Document #:
JGW-G1909593-v1
Document type:
G
Submitted by:
Kiwamu Izumi
Updated by:
Kiwamu Izumi
Document Created:
17 Jan 2019, 05:44
Contents Revised:
09 Feb 2019, 04:46
DB Info Revised:
09 Feb 2019, 04:46
Viewable by:
Modifiable by:
Other Versions:
JGW-G1909593-v2
14 Feb 2019, 15:37
JGW-G1909593-v0
17 Jan 2019, 05:59
Abstract:
As KAGRA is planning to join O3 in its later phase, a number of commissioning experiments are planned beforehand in order to bring the interferometer online as quick as possible in a tactical manner. We have so far successfully concluded two major commissioning experiments in 2018, that are the operation of the cryogenic Michelson interferometer and one-arm test with the X arm at room temperature. These tests assessed the readiness of a variety of hardware and software necessary for proceeding with the subsequent commissioning experiments. While we haven't found a major obstacle so far, we were able to identify critical components. In this talk, I will report on those commissioning activities together with latest status with the upcoming experiments towards participating in the terrestrial detector network during O3.
Authors:
DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators