Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
D1808394-v14 ISC system circuit diagram (old title: ALS system circuit diagram) Kiwamu Izumi et al. KAGRA
Interferometer Sensing and Control
03 May 2021
G2011694-v1 KAGRA observation run: performance of the Type A suspensions Trozzo Lucia KAGRA
Seismic Isolation
Others
26 May 2020
G1909954-v1 Commissioning of the typeA suspension control of KAGRA Trozzo Lucia KAGRA
Seismic Isolation
JPS
14 Mar 2019
G1909593-v2 Commissioning Status of KAGRA (talk for KIW5) Kiwamu Izumi Interferometer Sensing and Control
KAGRA
Digital Control
Length Sensing and Control
Suspensions
Workshop
Alignment Sensing and control
14 Feb 2019
G1808463-v1 Chief meeting material: ALS schedule Kiwamu Izumi KAGRA
Interferometer Sensing and Control
Scheduling
KAGRA meeting
06 Jul 2018
T1808343-v2 Definitions for the X arm commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
10 Jun 2018
G1808254-v3 Commissioning of bKAGRA phase-I : Details Kiwamu Izumi Interferometer Sensing and Control
KAGRA
KAGRA F2F
23 May 2018
G1807772-v1 Material for the commissioning meeting on Feb 6 Kiwamu Izumi Seismic Isolation
Suspensions
Alignment Sensing and control
Interferometer
KAGRA
06 Feb 2018
T1707429-v2 Summary of the initial alignment closeout meeting Kiwamu Izumi Interferometer
KAGRA
16 Nov 2017
G1707417-v1 Meeting material: initial alignment closeout meeting, setting the stage Kiwamu Izumi KAGRA
Interferometer
14 Nov 2017
T1707079-v4 MIF Schedule Estimate for bKAGRA Phase 2 Yuta Michimura KAGRA
Interferometer Sensing and Control
06 Sep 2017
G1707104-v3 Selected Commissioning Topics Kiwamu Izumi Alignment Sensing and control
Interferometer
Other Groups
Interferometer Sensing and Control
Optics
Digital Control
Length Sensing and Control
KAGRA F2F
30 Aug 2017
T1301693-v1 Report from the June 2013 Scattering Workshop at GEO Tomotada Akutsu et al. KAGRA
Other Groups
02 Mar 2017
G1605545-v2 Summary of iKAGRA Run Yuta Michimura Interferometer
KAGRA
KAGRA F2F
21 Sep 2016
G1605563-v4 KAGRA MIF Status Report (F2F Aug 26, 2016) Yuta Michimura Interferometer
KAGRA
KAGRA F2F
26 Aug 2016
G1201308-v1 Commissioning history of TAMA Masaki Ando Management
TAMA
Detector
05 Oct 2012
G1201139-v1 コミッショニングの諸問題 Koji Arai KAGRA
KAGRA meeting
09 Jul 2012
Number of documents found: 17

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.38 usr + 0.03 sys = 0.41 CPU)