| E2415857-v1 |
Proposal for modification of pumping unit between OMMT and OMC |
Nobuhiro Kimura |
KAGRA
Vacuum
KAGRA meeting
|
25 Jun 2024 |
| G2214440-v1 |
The KAGRA Vacuum and Cryogenic and its upgrades |
Nobuhiro Kimura |
KAGRA
Vacuum
Workshop
|
03 Oct 2022 |
| E1808952-v4 |
Present condition of the EXC, IXC and others |
Nobuhiro Kimura |
Chief meeting
KAGRA
Cryogenic
|
03 Sep 2018 |
| T1807770-v1 |
Systematic error in an optical lever due to air/vacuum refractive index |
Kiwamu Izumi |
Alignment Sensing and control
Optics
Suspensions
KAGRA
Interferometer
|
03 Feb 2018 |
| T1605385-v1 |
2nd stories chamber position_July2016 |
Yoshio Saito |
Vacuum
KAGRA
Chief meeting
|
18 Jul 2016 |
| G1402932-v1 |
X&Y-end cryostat construction schedule |
Nobuhiro Kimura |
Cryogenic
KAGRA
Chief meeting
|
27 Oct 2014 |
| T1301549-v1 |
Top filter pre-isolator tuning/performance evaluation |
Riccardo DeSalvo |
Seismic Isolation
KAGRA
|
21 Feb 2013 |
| G1301520-v1 |
Status of KAGRA-SAS design, prototyping testing and production February 2013 |
Riccardo DeSalvo |
Seismic Isolation
KAGRA
|
14 Feb 2013 |
| D1201051-v1 |
Type-A and Type-B SAS vacuum tanks |
Riccardo DeSalvo |
KAGRA
Seismic Isolation
|
17 Jan 2013 |
| D1301484-v0 |
Tower-B external vacuum and vacuum tank drawings |
Riccardo DeSalvo |
KAGRA
Vacuum
|
17 Jan 2013 |
| T1301483-v1 |
Finite Element Model analysis of Vacuum tanks for tower B1 and B2 |
Riccardo DeSalvo |
KAGRA
Vacuum
|
17 Jan 2013 |
| D1100470-v6 |
specifications for Type-B seismic attenuation |
Riccardo DeSalvo |
Seismic Isolation
KAGRA
|
30 Jun 2011 |
| G1100429-v1 |
LCGT seismic attenuation |
Riccardo DeSalvo |
KAGRA
Seismic Isolation
|
07 May 2011 |
| T1000216-v1 |
Test Mass Optical Lever Rough Plan |
Yoichi Aso |
Interferometer Sensing and Control
KAGRA
Others
Vacuum
|
27 Oct 2010 |