| D1808394-v14 |
ISC system circuit diagram (old title: ALS system circuit diagram) |
Kiwamu Izumi et al. |
Interferometer Sensing and Control
KAGRA
|
03 May 2021 |
| G2011694-v1 |
KAGRA observation run: performance of the Type A suspensions |
Trozzo Lucia |
Seismic Isolation
Others
KAGRA
|
26 May 2020 |
| G1909954-v1 |
Commissioning of the typeA suspension control of KAGRA |
Trozzo Lucia |
KAGRA
JPS
Seismic Isolation
|
14 Mar 2019 |
| G1909593-v2 |
Commissioning Status of KAGRA (talk for KIW5) |
Kiwamu Izumi |
Suspensions
Length Sensing and Control
Interferometer Sensing and Control
Digital Control
Alignment Sensing and control
Workshop
KAGRA
|
14 Feb 2019 |
| G1808463-v1 |
Chief meeting material: ALS schedule |
Kiwamu Izumi |
Interferometer Sensing and Control
KAGRA
KAGRA meeting
Scheduling
|
06 Jul 2018 |
| T1808343-v2 |
Definitions for the X arm commissioning |
Yutaro Enomoto et al. |
KAGRA
Interferometer Sensing and Control
|
10 Jun 2018 |
| G1808254-v3 |
Commissioning of bKAGRA phase-I : Details |
Kiwamu Izumi |
KAGRA
Interferometer Sensing and Control
KAGRA F2F
|
23 May 2018 |
| G1807772-v1 |
Material for the commissioning meeting on Feb 6 |
Kiwamu Izumi |
Alignment Sensing and control
KAGRA
Interferometer
Suspensions
Seismic Isolation
|
06 Feb 2018 |
| T1707429-v2 |
Summary of the initial alignment closeout meeting |
Kiwamu Izumi |
KAGRA
Interferometer
|
16 Nov 2017 |
| G1707417-v1 |
Meeting material: initial alignment closeout meeting, setting the stage |
Kiwamu Izumi |
KAGRA
Interferometer
|
14 Nov 2017 |
| T1707079-v4 |
MIF Schedule Estimate for bKAGRA Phase 2 |
Yuta Michimura |
Interferometer Sensing and Control
KAGRA
|
06 Sep 2017 |
| G1707104-v3 |
Selected Commissioning Topics |
Kiwamu Izumi |
Optics
Interferometer
KAGRA F2F
Other Groups
Length Sensing and Control
Interferometer Sensing and Control
Alignment Sensing and control
Digital Control
|
30 Aug 2017 |
| T1301693-v1 |
Report from the June 2013 Scattering Workshop at GEO |
Tomotada Akutsu et al. |
KAGRA
Other Groups
|
02 Mar 2017 |
| G1605545-v2 |
Summary of iKAGRA Run |
Yuta Michimura |
KAGRA
KAGRA F2F
Interferometer
|
21 Sep 2016 |
| G1605563-v4 |
KAGRA MIF Status Report (F2F Aug 26, 2016) |
Yuta Michimura |
KAGRA F2F
Interferometer
KAGRA
|
26 Aug 2016 |
| G1201308-v1 |
Commissioning history of TAMA |
Masaki Ando |
Management
TAMA
Detector
|
05 Oct 2012 |
| G1201139-v1 |
コミッショニングの諸問題 |
Koji Arai |
KAGRA meeting
KAGRA
|
09 Jul 2012 |