Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
T1808963-v2 Diagonalization of Optical Lever signals for Type B suspensions Tak Lun Terrence Tsang Suspensions
Seismic Isolation
KAGRA
03 May 2021
T2011661-v3 Actuator modification for cryopayload Yuta Michimura Suspensions
Interferometer Sensing and Control
KAGRA
Cryogenic
27 May 2020
G2011694-v1 KAGRA observation run: performance of the Type A suspensions Trozzo Lucia KAGRA
Others
Seismic Isolation
26 May 2020
G1910445-v1 Commissioning and performance of the Signal Recycling suspensions of KAGRA Enzo Tapia KAGRA
Suspensions
Workshop
16 Jul 2019
T1910142-v2 Noise and range calculations for using High Power Coil Driver for the test mass stage of cryopayload Yuta Michimura KAGRA
Suspensions
Interferometer Sensing and Control
24 Apr 2019
G1909954-v1 Commissioning of the typeA suspension control of KAGRA Trozzo Lucia Seismic Isolation
JPS
KAGRA
14 Mar 2019
G1909624-v1 Status of KAGRA Type B Suspensions (KIW, 2019-02) Mark Barton et al. KAGRA
Suspensions
15 Feb 2019
G1809006-v1 JPS Presentation. Status of the Signal Recycling Mirror Suspensions of KAGRA. Enzo Tapia Enzo Tapia JPS
KAGRA
Suspensions
14 Sep 2018
G1808551-v2 Basic lecture for students 1: VIS Suspensions and digital system. Enzo Tapia Seminar
Suspensions
KAGRA
16 Aug 2018
G1707422-v1 Review of initial alignment from the point of view of Type-C Naoko Ohishi Suspensions
KAGRA
15 Nov 2017
E1504235-v2 BS Installation Procedure Mark Barton Suspensions
KAGRA
13 Aug 2017
T1605630-v1 BS Rotation Mark Barton Suspensions
KAGRA
08 Sep 2016
G1605546-v1 Type B Installation Status, f2f Meeting, 8/25/16 Mark Barton KAGRA
Suspensions
25 Aug 2016
G1605348-v2 Type B Installation Plan Mark Barton Suspensions
KAGRA
04 Jul 2016
T1605106-v0 Wire selection for the optic suspensions of Type B and Type Bp payloads Fabian E Pena Arellano Suspensions
KAGRA
08 Apr 2016
T1504420-v1 BS Assembly Frame Concept Mark Barton Suspensions
KAGRA
22 Oct 2015
D1504338-v1 Assembly and hanging frames for the PR suspensions (production drawings) Yoichi Aso KAGRA
08 Oct 2015
T1504271-v1 BS Standoffs Mark Barton Suspensions
KAGRA
24 Sep 2015
E1503840-v2 PR2/PR3/PRM Suspension Final Assembly and Installation Procedure Mark Barton KAGRA
Suspensions
11 Aug 2015
D1503382-v2 Type B Prototype Cabling Mark Barton et al. KAGRA
Suspensions
31 May 2015
T1403040-v0 Procedure for Installation of Type B Prototype at TAMA Mark Barton KAGRA
Suspensions
04 Dec 2014
G1301899-v1 Status of Cryogenics for domestic f2f 20131009 Toshikazu Suzuki Cryogenic
KAGRA
KAGRA meeting
09 Oct 2013
G1100437-v4 Present Design of LCGT Cryogenics Payload Nobuhiro Kimura GWADW
KAGRA
Cryogenic
24 May 2011
Number of documents found: 23

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.40 usr + 0.04 sys = 0.44 CPU)