JGW-T1605177-v2
[
DocDB Home
] [
Search
] [
Recent Changes
]
Summary of iKAGRA Test Run Apr 2016
Document #:
JGW-T1605177-v2
Document type:
T
Submitted by:
Yuta Michimura
Updated by:
Yuta Michimura
Document Created:
09 May 2016, 09:57
Contents Revised:
09 May 2016, 13:58
DB Info Revised:
09 May 2016, 13:58
Viewable by:
Public document
JGW-T1605177-v2
Modifiable by:
admin
kagra
Other Versions:
JGW-T1605177-v3
13 May 2016, 09:57
JGW-T1605177-v1
09 May 2016, 13:35
JGW-T1605177-v0
09 May 2016, 10:23
Abstract:
iKAGRA test run on Apr 11-25, 2016 is summarized.
Presented at the Chief Meeting on May 5, 2016.
Summarizes the change between March run and April run, and some detector characterization results. Also discusses issues found during the commissioning.
Files in Document:
iKAGRATestRunSummaryApr2016.pdf
(1.2 MB)
iKAGRATestRunSummaryApr2016.ppt
(1.0 MB)
Topics:
Management
:
Collaboration meeting
:
Chief meeting
Detector
:
Interferometer
Detector
:
MC
Detector
:
Interferometer Sensing and Control
Activity
:
KAGRA
Authors:
Yuta Michimura
Keywords:
MIF
VAC
IOO
ISC
calibration
test
run
DetChar
Related Documents:
JGW-T1605101:
Summary of iKAGRA Test Run March 2016
Referenced by:
JGW-G1605296:
Lessons from iKAGRA
JGW-G1605545:
Summary of iKAGRA Run
[
DocDB Home
] [
Search
] [
Recent Changes
]
DocDB
Version 8.7.10, contact
Document Database Administrators