Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
D1808155-v2 1 inch disc to attach mirror with piezoelectric transducer Yuta Michimura Interferometer
KAGRA
Modulation
18 Apr 2018
D1100713-v1 Drawing of BS (Beam Splitter) Substrate Eiichi Hirose KAGRA
Optics
23 Nov 2011
P1504245-v1 Calculations on the Recoupling of Scattering Light of a Mirror Setup with a Recoil Mass into a Laser-Field Simon Zeidler et al. KAGRA
Optics
Paper
23 Sep 2015
G1605403-v2 Development and test of an absorption bench to characterize the KAGRA mirrors Raffaele Flaminio et al. Optics
JPS
KAGRA
25 Jul 2016
G1605018-v1 Development and test of an absorption bench to characterize the KAGRA mirrors Manuel Marchio Optics
KAGRA
JPS
21 Mar 2016
G1504205-v1 Mirror absorption bench setup and commissioning Manuel Marchio KAGRA
KAGRA F2F
Optics
02 Sep 2015
T1402265-v1 Design features of the KAGRA seismic attenuation system. Riccardo DeSalvo Seismic Isolation
KAGRA
19 Mar 2014
T1402264-v1 Mirror suspensions hierarchy for beam splitter and recyclers Riccardo DeSalvo Suspensions
KAGRA
19 Mar 2014
G1301659-v1 KAGRA 用高性能ミラー評価:散乱角度分布測定装置の開発 Mitsuru Musha et al. Optics
KAGRA
JPS
14 May 2013
T1301588-v1 Construction of Type-B seismic attenuation chain and Mirror assembly tooling Riccardo DeSalvo Suspensions
KAGRA
27 Mar 2013
G1301555-v2 Mirror quality and interferometer performance Hiroaki Yamamoto Optics
KAGRA
07 Mar 2013
T1201320-v1 Minutes of discussion following on cryogenic suspensions meeting of Oct. 10th Riccardo DeSalvo KAGRA
System Engineering
12 Oct 2012
T1201317-v1 Summary of Oct. 11th meeting on cryogenic suspensions. Riccardo DeSalvo KAGRA
Suspensions
12 Oct 2012
T1201215-v1 AFM_super-polish Daisuke Tatsumi et al. Others
KAGRA
Optics
01 Aug 2012
G1201214-v1 Reducing Thermal Noise in Advanced Gravitational Wave Detector Mirror Coatings Innocenzo Pinto KAGRA
KAGRA F2F
Optics
01 Aug 2012
G1201101-v5 Proposal: Composite mirror suspensions Riccardo DeSalvo Cryogenic
KAGRA meeting
KAGRA
31 Jul 2012
G1201029-v4 Nano-coatings the reasoning and the R&D status Riccardo DeSalvo R&D
Optics
15 May 2012
G1200918-v1 2012年春 天文学会 ”重力波検出器LCGT のための低損失ミラー開発” Daisuke Tatsumi et al. Conference
Optics
KAGRA
20 Mar 2012
D1100707-v2 Specification of PRM (Power Recycling MIrror) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
D1100708-v2 Specification of PR2 (Power Recycling Mirror 2) for polishing Eiichi Hirose Optics
KAGRA
28 Feb 2012
D1100709-v2 Specification of PR3 (Power Recycling Mirror 3) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
D1100710-v2 Specification of SRM (Signal Recycling Mirror) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
D1100711-v2 Specification of SR2 (Signal Recycling MIrror 2) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
D1100712-v2 Specification of SR3 (Signal Recycling Mirror 3) for polishing Eiichi Hirose KAGRA
Optics
28 Feb 2012
T1200888-v1 Memorandum about how to make specifications for Recycling Mirrors Eiichi Hirose et al. KAGRA
Optics
23 Feb 2012
D1100704-v3 Specification of BS (Beam Splitter) for polishing Eiichi Hirose Optics
KAGRA
09 Jan 2012
G1100749-v1 BS and Mirrors for the LCGT Eiichi Hirose et al. Optics
KAGRA
15 Dec 2011
D1100718-v2 Drawing of 25cm-dia. Silica Substrate Eiichi Hirose Optics
KAGRA
05 Dec 2011
D1100717-v2 Drawing of TM (Test Mass) Substrate Eiichi Hirose KAGRA
Optics
02 Dec 2011
D1100706-v1 Specification of ETM (End Test Mass) for polishing Eiichi Hirose KAGRA
Optics
23 Nov 2011
D1100705-v1 Specification of ITM (Input Test Mass) for polishing Eiichi Hirose KAGRA
Optics
23 Nov 2011
T1100637-v5 Recycler and Beam Splitter mirror suspension assembly sequence Riccardo DeSalvo KAGRA
Suspensions
11 Nov 2011
T1100631-v1 鏡の形状・曲率半径測定に関する打ち合わせ(110912) Eiichi Hirose Optics
KAGRA
06 Oct 2011
T1100629-v1 Visiting GT Crystal Systems Eiichi Hirose KAGRA
Optics
04 Oct 2011
T1100500-v1 MC Mirrors Over View Souichi Telada KAGRA
Others
MC
19 Jul 2011
G1100437-v4 Present Design of LCGT Cryogenics Payload Nobuhiro Kimura KAGRA
GWADW
Cryogenic
24 May 2011
Number of documents found: 36

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.49 usr + 0.05 sys = 0.54 CPU)