MIF Schedule Estimate for bKAGRA Phase 2
Document #:
JGW-T1707079-v3
Document type:
T
Submitted by:
Yuta Michimura
Updated by:
Yuta Michimura
Document Created:
24 Aug 2017, 19:18
Contents Revised:
27 Aug 2017, 16:02
DB Info Revised:
27 Aug 2017, 16:07
Viewable by:
Public document
JGW-T1707079-v3
Modifiable by:
admin
kagra
Other Versions:
JGW-T1707079-v4
06 Sep 2017, 13:51
JGW-T1707079-v2
26 Aug 2017, 01:24
JGW-T1707079-v1
24 Aug 2017, 19:18
Abstract:
Shows estimated timeline for the main interferometer locking based on Advanced LIGO, Advanced Virgo, iKAGRA experience.
Files in Document:
bKAGRAPhase2MIFScheduleEstimate.pdf
(401.1 kB)
Topics:
Activity
:
KAGRA
Detector
:
Interferometer Sensing and Control
Authors:
Yuta Michimura
Keywords:
MIF
commissioning
locking
Related Documents:
JGW-T1605274:
MIF Commissioning Schedule Estimate for bKAGRA Phase 1
JGW-G1707078:
Expected Sensitivity Growth and Signal Recycling
Referenced by:
JGW-T1707334:
Main Interferometer Configuration for Early Phase of bKAGRA
[