Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-doc-# Title Author(s) Topic(s) Last Updated
G2517020-v1 Status report for in-vac RF PDs and RF QPDs (Extended chief meeting on Dec 9, 2025) Yuta Michimura Circuits
Vacuum
Interferometer Sensing and Control
KAGRA
Chief meeting
04 Dec 2025
G2516769-v2 Status report for in-vac PD and QPD enclosure and layout design (O5 upgrade strategy meeting on Aug 6, 2025) Yuta Michimura Vacuum
Circuits
Interferometer Sensing and Control
KAGRA
04 Dec 2025
D1909964-v6 MC_REFL_Table Layout Guiguo Ge KAGRA
MC
15 Apr 2019
D1910144-v1 MC_TRANS_Table Layout Guiguo Ge MC
KAGRA
24 Apr 2019
T1807775-v5 Interferometer Layout for Both IR and Green Beams, With and Without ITMs Yuta Michimura Interferometer
KAGRA
Auxiliary IFO
07 Mar 2018
T1807652-v1 Notes on the beam layout without the ITMs Kiwamu Izumi Interferometer
KAGRA
13 Jan 2018
D1402379-v1 MIF optical layout for bKAGRA Yoichi Aso KAGRA
08 May 2014
D1402380-v1 MIF layout for iKAGRA Yoichi Aso KAGRA
08 May 2014
T1200913-v6 KAGRA Main Interferometer Design Document Yoichi Aso et al. Length Sensing and Control
Interferometer Sensing and Control
Others
Alignment Sensing and control
KAGRA
Interferometer
19 Feb 2014
T1201094-v1 aLIGO参照球を利用したリサイクリング共振器の可能性 Yoichi Aso KAGRA
Interferometer
Others
01 Jun 2012
T1100489-v1 Wedge angle error tolerance for core optics Yoichi Aso Optics
Others
Auxiliary IFO
KAGRA
23 Jun 2011
G1100343-v2 MIF Meeting Feb 9 2011 Yoichi Aso KAGRA
Interferometer
Alignment Sensing and control
Collaboration meeting
Interferometer Sensing and Control
Optics
Length Sensing and Control
10 Feb 2011
G1100322-v1 Current Status of Main Interferometer Design Yoichi Aso KAGRA F2F
KAGRA
Interferometer
Alignment Sensing and control
Interferometer Sensing and Control
Length Sensing and Control
04 Feb 2011
Number of documents found: 13

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.8.12, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.15 usr + 0.01 sys = 0.16 CPU)