Search Results

DocDB Home ]  [ Search ] [ Recent Changes ]

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
P2214296-v3 Optimizing Active Vibration Isolation Systems in Ground-Based Interferometric Gravitational-Wave detectors Tak Lun Terrence Tsang KAGRA
Seismic Isolation
Suspensions
Thesis
30 Sep 2022
P2213991-v2 Optimal sensor fusion method for active vibration isolation systems in ground-based gravitational-wave detectors Tak Lun Terrence Tsang Seismic Isolation
KAGRA
Paper
Suspensions
08 Aug 2022
T1808963-v2 Diagonalization of Optical Lever signals for Type B suspensions Tak Lun Terrence Tsang Suspensions
Seismic Isolation
KAGRA
03 May 2021
G1911004-v1 Adaptive Robust Control Systems for KAGRA Vibration Isolation System Tak Lun Terrence Tsang Management
KAGRA
Suspensions
22 Nov 2019
G1910639-v1 High-frequency broadband H1-detector response to a M4.1 earthquake in LIGO O2 Maurice H.P.M van Putten Data Analysis
KAGRA F2F
Seismic Isolation
24 Aug 2019
P1809044-v2 MultiSAS, a six degrees of freedom vibration isolation system for Advanced Virgo Kazuhiro Agatsuma et al. Paper
R&D
Suspensions
25 Sep 2018
G1807857-v1 Proposal for organizing the VIS measurements Yutaro Enomoto et al. System Engineering
KAGRA
Organization
Seismic Isolation
Suspensions
Others
14 Feb 2018
G1301592-v1 movie of Pre-isolator top filter oscillation Riccardo DeSalvo KAGRA
Seismic Isolation
30 Mar 2013
G1301591-v1 demonstrator movies for GAS filter and Inverted Pendulum seismic attenuators Riccardo DeSalvo Seismic Isolation
KAGRA
30 Mar 2013
G1301580-v2 cantilever blade pre-tensioning movie Riccardo DeSalvo Seismic Isolation
KAGRA
26 Mar 2013
T1301579-v1 Top filter assembly procedures Riccardo DeSalvo KAGRA
Seismic Isolation
24 Mar 2013
T1301549-v1 Top filter pre-isolator tuning/performance evaluation Riccardo DeSalvo Seismic Isolation
KAGRA
21 Feb 2013
G1301520-v1 Status of KAGRA-SAS design, prototyping testing and production February 2013 Riccardo DeSalvo KAGRA
Seismic Isolation
14 Feb 2013
T1301483-v1 Finite Element Model analysis of Vacuum tanks for tower B1 and B2 Riccardo DeSalvo Vacuum
KAGRA
17 Jan 2013
Number of documents found: 14

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.35 usr + 0.03 sys = 0.38 CPU)