| G1910445-v1 |
Commissioning and performance of the Signal Recycling suspensions of KAGRA |
Enzo Tapia |
Workshop
KAGRA
Suspensions
|
16 Jul 2019 |
| G1909624-v1 |
Status of KAGRA Type B Suspensions (KIW, 2019-02) |
Mark Barton et al. |
KAGRA
Suspensions
|
15 Feb 2019 |
| G1809006-v1 |
JPS Presentation. Status of the Signal Recycling Mirror Suspensions of KAGRA. Enzo Tapia |
Enzo Tapia |
Suspensions
KAGRA
JPS
|
14 Sep 2018 |
| G1808551-v2 |
Basic lecture for students 1: VIS Suspensions and digital system. |
Enzo Tapia |
KAGRA
Suspensions
Seminar
|
16 Aug 2018 |
| E1504235-v2 |
BS Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
13 Aug 2017 |
| T1605630-v1 |
BS Rotation |
Mark Barton |
KAGRA
Suspensions
|
08 Sep 2016 |
| G1605546-v1 |
Type B Installation Status, f2f Meeting, 8/25/16 |
Mark Barton |
Suspensions
KAGRA
|
25 Aug 2016 |
| G1605348-v2 |
Type B Installation Plan |
Mark Barton |
Suspensions
KAGRA
|
04 Jul 2016 |
| T1605106-v0 |
Wire selection for the optic suspensions of Type B and Type Bp payloads |
Fabian E Pena Arellano |
KAGRA
Suspensions
|
08 Apr 2016 |
| T1504420-v1 |
BS Assembly Frame Concept |
Mark Barton |
Suspensions
KAGRA
|
22 Oct 2015 |
| T1504271-v1 |
BS Standoffs |
Mark Barton |
Suspensions
KAGRA
|
24 Sep 2015 |
| E1503840-v2 |
PR2/PR3/PRM Suspension Final Assembly and Installation Procedure |
Mark Barton |
Suspensions
KAGRA
|
11 Aug 2015 |
| D1503382-v2 |
Type B Prototype Cabling |
Mark Barton et al. |
KAGRA
Suspensions
|
31 May 2015 |
| T1403040-v0 |
Procedure for Installation of Type B Prototype at TAMA |
Mark Barton |
KAGRA
Suspensions
|
04 Dec 2014 |