JGW-G1402812-v1
- Document #:
- JGW-G1402812-v1
- Document type:
- G
- Submitted by:
- Fabian E Pena Arellano
- Updated by:
- Fabian E Pena Arellano
- Document Created:
- 25 Sep 2014, 09:51
- Contents Revised:
- 25 Sep 2014, 09:51
- DB Info Revised:
- 25 Sep 2014, 09:51
- The presentation describes the main challenges in the assembly of the type B suspension payload prototype and also the changes required to ease the assembly during the construction of KAGRA. A first measurement of the intermediate mass movement using the OSEMs is shown.
DocDB Version 8.7.10, contact
Document Database Administrators