JGW-Number
|
Title
|
Author(s)
|
Topic(s)
|
Last Updated
|
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
T1808963-v2 | Diagonalization of Optical Lever signals for Type B suspensions | Tak Lun Terrence Tsang | Seismic Isolation KAGRA Suspensions |
03 May 2021 | ||||||||||
T1910189-v3 | BS and SR TM optical lever (oplev) diagonalization matrix | Tak Lun Terrence Tsang | KAGRA Suspensions |
03 May 2021 | ||||||||||
G1809006-v1 | JPS Presentation. Status of the Signal Recycling Mirror Suspensions of KAGRA. Enzo Tapia | Enzo Tapia | KAGRA Suspensions JPS |
14 Sep 2018 | ||||||||||
G1808874-v1 | Lecture 4_b: OPLEV setup for SRM suspensions. | Enzo Tapia | Suspensions KAGRA Seminar |
24 Aug 2018 | ||||||||||
E1808836-v3 | SR3 Oplev setup, calibration and diagonalization | Enzo Tapia | Suspensions Others KAGRA |
22 Aug 2018 |
DocDB Version 8.7.10, contact
Document Database Administrators
Execution time: 1 wallclock secs ( 0.33 usr + 0.02 sys = 0.35 CPU)