Document List by Topic

DocDB Home ]  [ Search ] [ Recent Changes ]

These documents on Interferometer Sensing and Control (subtopic of Detector) and sub-topics are available:

JGW-Number
Title
Author(s)
Topic(s)
Last Updated
S1307462-v1 AA chassis Osamu Miyakawa Data Acquisition
KAGRA
Circuits
Digital Control
09 Jan 2024
T1910359-v1 ASC simulations for O3 SRM transmission, SRC Gouy phase shift and ITM transmission asymmetry Yuta Michimura Alignment Sensing and control
KAGRA
21 Jun 2019
P0500066-v0 干渉計型重力波検出器TAMA300 における変調復調系雑音 Koji Arai Interferometer Sensing and Control
Interferometer
Modulation
Laser
TAMA
Length Sensing and Control
Detector
12 Feb 2010
S1807794-v0 Newfocus8742 picomotor driver Yuta Michimura KAGRA
Digital Control
01 Nov 2021
T2112858-v4 Final design and implementation of the KAGRA green lock system Kiwamu Izumi KAGRA
Interferometer Sensing and Control
Interferometer
Length Sensing and Control
04 Oct 2021
L2113224-v2 Minutes for External Review for KAGRA Interferometer Alignment Controls Haoyu Wang et al. External Review
Alignment Sensing and control
KAGRA
26 Aug 2021
S1307459-v0 AA Chassis Osamu Miyakawa KAGRA
Data Acquisition
Digital Control
Circuits
03 Aug 2021
T2113073-v5 TMS polarization monitor plan Yuta Michimura et al. Interferometer Sensing and Control
Interferometer
KAGRA
Auxiliary IFO
13 Jul 2021
E1807769-v0 Document Tree for Arm Length Stabilization System Kiwamu Izumi et al. Interferometer Sensing and Control
KAGRA
30 Jun 2021
E2113026-v1 Test report for the phase frequency discriminator unit Kiwamu Izumi et al. Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
Length Sensing and Control
23 Jun 2021
S1808035-v0 AA chassis Osamu Miyakawa Circuits
Digital Control
Data Analysis
KAGRA
23 Jun 2021
T2112592-v6 Summary of Current Situation of In-vacuum Steering Mirrors Yuta Michimura Interferometer
Interferometer Sensing and Control
KAGRA
Optics
15 Jun 2021
D1808394-v14 ISC system circuit diagram (old title: ALS system circuit diagram) Kiwamu Izumi et al. Interferometer Sensing and Control
KAGRA
03 May 2021
S1402880-v0 Chassis Power Regulator Board S_No.(B_No.025) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
T2112594-v5 Sumary of Alignment Scheme of KAGRA in O3GK (~2020) Yuta Michimura et al. Interferometer
KAGRA
Alignment Sensing and control
15 Apr 2021
D1402607-v2 KAGRA用光学定盤の高さ Yuta Michimura Optics
KAGRA meeting
KAGRA
Interferometer Sensing and Control
06 Apr 2021
G1605913-v2 Hans-on lecture: MEDMとStriptoolの使い方について Yukitsugu Sasaki Digital Control
KAGRA F2F
KAGRA
06 Apr 2021
T2012132-v2 New GUI tool for interferometer modeling using Finesse simulation. Chiaki Hirose et al. Interferometer Sensing and Control
KAGRA
25 Jan 2021
T2012351-v4 Graphical user interface for Finesse simulation tool Naoki Koyama et al. Interferometer Sensing and Control
KAGRA
25 Jan 2021
G2012136-v0 CDS update for O4 in KAGRA Takahiro Yamamoto Interferometer Sensing and Control
KAGRA
Data Acquisition
14 Oct 2020
T2011755-v10 Estimated sensitivity for auxiliary degrees of freedom of the KAGRA interferometer Yuta Michimura et al. Suspensions
KAGRA
Interferometer
Interferometer Sensing and Control
12 Aug 2020
T2011661-v3 Actuator modification for cryopayload Yuta Michimura Cryogenic
Suspensions
KAGRA
Interferometer Sensing and Control
27 May 2020
S1402876-v0 Chassis Power Regulator Board S_No.(B_No.021) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
P1911103-v12 [Thesis] Interferometer Locking Scheme for Advanced Gravitational-Wave Detectors and Beyond Yutaro Enomoto Thesis
Interferometer Sensing and Control
KAGRA
R&D
17 Feb 2020
P1910539-v7 [Draft] An arm length stabilization system for KAGRA and future gravitational-wave detectors Yutaro Enomoto Interferometer Sensing and Control
KAGRA
14 Jan 2020
G1911057-v2 [F2F thesis presentation] Interferometer Locking Scheme for Advanced Gravitational-Wave Detectors and Beyond Yutaro Enomoto Interferometer Sensing and Control
R&D
KAGRA
KAGRA F2F
03 Dec 2019
G1910995-v1 Alternative control topology for ISC Tak Lun Terrence Tsang Interferometer Sensing and Control
Management
KAGRA
18 Nov 2019
S1808034-v0 AA chassis Osamu Miyakawa Data Analysis
Digital Control
Circuits
KAGRA
02 Oct 2019
S1909724-v1 Wenzel Harmonic Generator 500-31450 Chassis S_No.001 Ryosuke Sugimoto Modulation
Circuits
Interferometer Sensing and Control
KAGRA
21 Sep 2019
G1910807-v3 Report on Simulation Studies on Interferometer Configuration for O3 Yoichi Aso et al. Chief meeting
Interferometer Sensing and Control
KAGRA
18 Sep 2019
G1910789-v2 TAUP2019, IFO control Masayuki Nakano Others
KAGRA
Interferometer Sensing and Control
08 Sep 2019
T1910582-v1 Mode matching without PRM Kiwamu Izumi Optics
KAGRA
Interferometer Sensing and Control
Interferometer
25 Aug 2019
G1910579-v1 Commissioning report Masayuki Nakano Length Sensing and Control
KAGRA F2F
KAGRA
22 Aug 2019
T1605967-v7 Cartoon of the optical layout around SRs Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
20 Jul 2019
D1909844-v3 Rack design schematic for OMC1 Yutaro Enomoto et al. Interferometer Sensing and Control
Interferometer
KAGRA
Data Acquisition
Alignment Sensing and control
Digital Control
Calibration
Circuits
System Engineering
Length Sensing and Control
10 Jul 2019
D1808696-v6 Rack design schematic for ALSs 0 and 1 Kiwamu Izumi Interferometer Sensing and Control
KAGRA
10 Jul 2019
T1910396-v1 Proposal to put polarizers inside PRC and SRC Yutaro Enomoto et al. Interferometer Sensing and Control
Interferometer
KAGRA
03 Jul 2019
T1910352-v6 On the effect of arm cavity finesse asymmetry to O3 sensitivity Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
25 Jun 2019
D1100425-v4 Position of digital system racks Osamu Miyakawa KAGRA
Data Acquisition
Circuits
Digital Control
06 Jun 2019
G1910211-v3 Topics on Commissioning of KAGRA Yutaro Enomoto KAGRA
Interferometer Sensing and Control
GWADW
Modulation
22 May 2019
T1909661-v0 Harmonic Generator Modification Plan Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
Modulation
Circuits
06 Feb 2019
T1910142-v2 Noise and range calculations for using High Power Coil Driver for the test mass stage of cryopayload Yuta Michimura Suspensions
Interferometer Sensing and Control
KAGRA
24 Apr 2019
G1910063-v2 Current Status of DGS Shoichi Oshino KAGRA
KAGRA F2F
Digital Control
18 Apr 2019
D1809177-v4 In-vacuum OMC DC PD Pre-amplifier Board Yuta Michimura et al. Circuits
Interferometer Sensing and Control
KAGRA
06 Apr 2019
T1909937-v2 How to deal with thick OSTM with wrong coating Yuta Michimura Optics
KAGRA
Interferometer
Interferometer Sensing and Control
01 Apr 2019
S1909725-v1 Wenzel Harmonic Generator 500-31450 Chassis S_No.002 Ryosuke Sugimoto Interferometer Sensing and Control
KAGRA
Modulation
Circuits
20 Mar 2019
S1808036-v0 AA chassis Osamu Miyakawa KAGRA
Data Analysis
Circuits
Digital Control
28 Feb 2019
T1909618-v7 Cartoon of AS Port Yuta Michimura et al. KAGRA
Interferometer Sensing and Control
23 Feb 2019
G1909593-v2 Commissioning Status of KAGRA (talk for KIW5) Kiwamu Izumi Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
Digital Control
Suspensions
Workshop
Length Sensing and Control
14 Feb 2019
T1707586-v12 List of RF Cables to Purchase for bKAGRA Yutaro Enomoto et al. Circuits
KAGRA
Interferometer Sensing and Control
31 Jan 2019
L1909582-v3 Request for tuning RF PD and RF QPD Yuta Michimura KAGRA
Interferometer Sensing and Control
Circuits
24 Jan 2019
T1909573-v2 Definitions for the DRMI commissioning Yutaro Enomoto et al. Interferometer Sensing and Control
KAGRA
23 Jan 2019
T1707038-v9 Latest estimated sensitivity of KAGRA (v201708) *APPROVED* Yutaro Enomoto et al. KAGRA
KSC
Interferometer Sensing and Control
07 Jan 2019
S1808039-v0 AI Chassis Osamu Miyakawa KAGRA
Data Analysis
Circuits
Digital Control
12 Dec 2018
S1808040-v0 AI chassis Osamu Miyakawa KAGRA
Data Analysis
Digital Control
Circuits
12 Dec 2018
S1604744-v1 Handmade RF Distribution Amplifier Chassis S_No.001 Masayuki Nakano KAGRA
Interferometer Sensing and Control
Modulation
Circuits
26 Nov 2018
G1808029-v1 MZI_SignalAcquisitionSystem_ver4 Kohei Yamamoto KAGRA
12 Mar 2018
G1808838-v2 Background image for ALS_OVERVIEW medm screen Yutaro Enomoto Interferometer Sensing and Control
KAGRA
13 Nov 2018
T1809260-v1 Request for circuit: EOM RF Amplifier Yuta Michimura KAGRA
Interferometer Sensing and Control
Modulation
Circuits
13 Nov 2018
D1504460-v5 Handmade RF Distribution Amplifier Top Assembly Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
Modulation
27 Oct 2018
T1605626-v3 ALS Sideband Frequency Yuta Michimura KAGRA
Interferometer Sensing and Control
15 Oct 2018
G1809017-v4 Issues on KAGRA CDS Osamu Miyakawa KAGRA
Digital Control
21 Sep 2018
T1807771-v3 Schematic of Arm Length Stabilization System Yuta Michimura Auxiliary IFO
Interferometer Sensing and Control
KAGRA
27 Aug 2018
T1808750-v1 [confidential] Data sheets for the green fibers for the ALS Kiwamu Izumi Interferometer Sensing and Control
KAGRA
21 Aug 2018
E1808724-v1 A list of MIF electronics Kiwamu Izumi Interferometer Sensing and Control
KAGRA
20 Aug 2018
G1808706-v1 Estimation of the cable length from PSL to ALS rack Kiwamu Izumi Interferometer Sensing and Control
KAGRA
15 Aug 2018
T1808460-v2 Estimation of clipping losses in a Fabry-Perot cavity Kiwamu Izumi KAGRA
Interferometer Sensing and Control
07 Aug 2018
G1808463-v1 Chief meeting material: ALS schedule Kiwamu Izumi Interferometer Sensing and Control
Scheduling
KAGRA
KAGRA meeting
06 Jul 2018
G1808441-v1 Thoughts on daily alignment procedure Yutaro Enomoto et al. Alignment Sensing and control
KAGRA
03 Jul 2018
G1808403-v1 LIGO-KAGRA CDS Meeting Takahiro Yamamoto Interferometer Sensing and Control
KAGRA
Others
Data Acquisition
21 Jun 2018
G1808390-v1 Lock Acquisition in Advanced Virgo (Part II): DC Readout, Noise Subtraction and Automation Diego Bersanetti Seminar
Interferometer Sensing and Control
16 Jun 2018
G1808389-v1 Lock Acquisition in Advanced Virgo (Part I): Guided Lock, SSFS and Automatic Alignment Julia Casanueva Seminar
Interferometer Sensing and Control
16 Jun 2018
G1808352-v2 Proposal for modification of the satellite box Kiwamu Izumi Interferometer Sensing and Control
KAGRA
Seismic Isolation
Cryogenic
15 Jun 2018
T1808388-v1 Notes on capacitor precision for satellite amplifier board Kiwamu Izumi Seismic Isolation
Suspensions
Cryogenic
Circuits
Interferometer Sensing and Control
KAGRA
15 Jun 2018
G1808375-v1 サブグループ紹介DGS Takahiro Yamamoto KAGRA
Data Acquisition
Interferometer Sensing and Control
KAGRA meeting
14 Jun 2018
G1808357-v2 ALS用ファイバーの位相雑音測定 Yutaro Enomoto KAGRA
Length Sensing and Control
12 Jun 2018
T1808343-v2 Definitions for the X arm commissioning Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
10 Jun 2018
D1808336-v1 (Tried to make a) bKAGRA ISC Cabling Diagram Yuta Michimura Circuits
Interferometer Sensing and Control
Interferometer
KAGRA
31 May 2018
G1808335-v1 Mach-Zehnder Modulation, in PSL design meeting, 2018.05.31 Kohei Yamamoto KAGRA
Length Sensing and Control
31 May 2018
D1503189-v7 bKAGRA PSL EOM Layout Yuta Michimura Interferometer Sensing and Control
KAGRA
Modulation
30 May 2018
G1808254-v3 Commissioning of bKAGRA phase-I : Details Kiwamu Izumi KAGRA F2F
KAGRA
Interferometer Sensing and Control
23 May 2018
G1808281-v1 Updates from MIF Subgroup (F2F May 20, 2018) Yoichi Aso et al. KAGRA
Interferometer
Interferometer Sensing and Control
KAGRA F2F
18 May 2018
G1808244-v1 GWADW_Poster_KoheiYamamoto Kohei Yamamoto Interferometer Sensing and Control
KAGRA
16 May 2018
T1808243-v1 Note on filter cavity part of KAGRA+ sensitivity calculation code Yutaro Enomoto Length Sensing and Control
KAGRA
Interferometer Sensing and Control
16 May 2018
G1808225-v7 Sensitivity Optimization of Cryogenic Gravitational Wave Detectors Yuta Michimura Data Analysis
KAGRA
Interferometer Sensing and Control
GWADW
15 May 2018
T1808172-v9 O3 Estimated Sensivitiy for FPMI, PRFPMI and RSE Yutaro Enomoto et al. KAGRA
Interferometer Sensing and Control
02 May 2018
D1808129-v4 bKAGRA phase 1 LSC cabling Yutaro Enomoto et al. Length Sensing and Control
Interferometer Sensing and Control
KAGRA
01 May 2018
P1707051-v2 Mirror actuation design for the interferometer control of the KAGRA gravitational wave telescope Yuta Michimura Suspensions
Seismic Isolation
Length Sensing and Control
KAGRA
12 Apr 2018
T1808126-v7 PRFPMI or RSE for Joining O3 Yuta Michimura Interferometer
KAGRA
Length Sensing and Control
10 Apr 2018
T1808117-v1 Alignment Plan for TRY Optical Table in bKAGRA Phase 1 Yuta Michimura Auxiliary IFO
Interferometer Sensing and Control
KAGRA
26 Mar 2018
T1808093-v1 Measuring the Schnupp asymmetry in a simple Michelson interferometer Kiwamu Izumi et al. Interferometer Sensing and Control
Interferometer
KAGRA
Length Sensing and Control
20 Mar 2018
L1808047-v1 Proposal for updating PSL layout Yuta Michimura KAGRA
Interferometer Sensing and Control
Modulation
15 Mar 2018
S1808038-v0 AI chassis Osamu Miyakawa KAGRA
Data Analysis
Digital Control
Circuits
12 Mar 2018
S1808037-v0 AI Chassis Osamu Miyakawa Circuits
Digital Control
Data Analysis
KAGRA
12 Mar 2018
S1808033-v0 AA chassis Osamu Miyakawa KAGRA
Digital Control
Circuits
Data Analysis
12 Mar 2018
G1807876-v1 LK CDS Meeting (Feb. 28, 2018) Takahiro Yamamoto Data Acquisition
KAGRA
Digital Control
01 Mar 2018
G1807772-v1 Material for the commissioning meeting on Feb 6 Kiwamu Izumi Seismic Isolation
Suspensions
KAGRA
Alignment Sensing and control
Interferometer
06 Feb 2018
T1807770-v1 Systematic error in an optical lever due to air/vacuum refractive index Kiwamu Izumi Alignment Sensing and control
KAGRA
Interferometer
Optics
Suspensions
03 Feb 2018
T1807753-v1 Minutes of ALS meeting (2018.Jan.30) Kohei Doi et al. Length Sensing and Control
Interferometer Sensing and Control
Interferometer
KAGRA
31 Jan 2018
L1807726-v1 ALS: where to add offset Yutaro Enomoto Length Sensing and Control
KAGRA
29 Jan 2018
E1807703-v1 Proposal for updating the test mass realtime control library Kiwamu Izumi Digital Control
Seismic Isolation
Suspensions
KAGRA
Interferometer
24 Jan 2018
G1807653-v1 Proposal for changing the BS real time model for hierarchical optical lever control Kiwamu Izumi Interferometer
KAGRA
Alignment Sensing and control
15 Jan 2018
G1707573-v2 Material for beam centering brainstorm v2 Kiwamu Izumi KAGRA
Alignment Sensing and control
27 Dec 2017
G1707572-v0 Material for beam centering brainstorm Kiwamu Izumi KAGRA
Alignment Sensing and control
27 Dec 2017
S1402879-v0 Chassis Power Regulator Board S_No.(B_No.024) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1307461-v0 AA chassis Osamu Miyakawa Circuits
Digital Control
KAGRA
Data Acquisition
29 Nov 2017
S1307460-v0 AA chassis Osamu Miyakawa Data Analysis
KAGRA
Circuits
Digital Control
29 Nov 2017
S1307458-v0 AI Chassis Osamu Miyakawa Circuits
Alignment Sensing and control
KAGRA
Data Acquisition
29 Nov 2017
S1307456-v0 AI chassis Osamu Miyakawa Circuits
Interferometer Sensing and Control
KAGRA
Data Acquisition
29 Nov 2017
S1307455-v0 AI chassis Osamu Miyakawa Data Acquisition
KAGRA
Circuits
Digital Control
29 Nov 2017
S1402874-v0 Chassis Power Regulator Board S_No.(B_No.019) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
G1707427-v1 LIGO-KAGRA CDS Meeting Takahiro Yamamoto Digital Control
Data Acquisition
16 Nov 2017
E1707416-v1 ALS meeting material (2017.Nov.13) Kohei Doi et al. Length Sensing and Control
KAGRA
14 Nov 2017
D1402984-v13 iKAGRA ISC Cabling Diagram Yuta Michimura MC
Modulation
Interferometer Sensing and Control
KAGRA
13 Oct 2017
G1706968-v4 重力波望遠鏡KAGRAの主干渉計高度化 Yuta Michimura JPS
Interferometer Sensing and Control
Interferometer
Data Analysis
13 Sep 2017
D1402986-v20 KAGRA ISC Electrical Components Layout Yuta Michimura Interferometer Sensing and Control
KAGRA
MC
Modulation
11 Sep 2017
T1707079-v4 MIF Schedule Estimate for bKAGRA Phase 2 Yuta Michimura Interferometer Sensing and Control
KAGRA
06 Sep 2017
P1707084-v2 iKAGRAのロックロス診断 Yuki Miyazaki KAGRA
Interferometer Sensing and Control
Thesis
05 Sep 2017
G1707104-v3 Selected Commissioning Topics Kiwamu Izumi Interferometer
Interferometer Sensing and Control
Alignment Sensing and control
Other Groups
Digital Control
KAGRA F2F
Optics
Length Sensing and Control
30 Aug 2017
T1706953-v3 Cartoon of the optical layout around IMC, IFI and IMM Yuta Michimura KAGRA
Interferometer Sensing and Control
18 Jul 2017
T1504459-v9 Magnetic noise calculation for BS (and ETM/ITM, PRM/SRM) Tomofumi Shimoda Interferometer Sensing and Control
KAGRA
Suspensions
02 Jul 2017
T1503453-v16 Actuator Noise Modeling Report Yuta Michimura Length Sensing and Control
Seismic Isolation
Suspensions
KAGRA
12 Jun 2017
T1706748-v5 Re-considering bKAGRA EOM layout Yutaro Enomoto Modulation
KAGRA
Interferometer Sensing and Control
02 Jun 2017
G1706729-v1 MIFなどの紹介 (KAGRA合同サブグループ説明会) Yuta Michimura Interferometer Sensing and Control
KAGRA
17 May 2017
G1706333-v12 重力波望遠鏡KAGRAの低温動作に向けた主干渉計開発 Yuta Michimura KAGRA meeting
Length Sensing and Control
KAGRA
JPS
31 Mar 2017
G1706378-v5 KAGRA MIF Status Report (F2F Mar 29, 2017) Yuta Michimura KAGRA F2F
KAGRA
Interferometer Sensing and Control
31 Mar 2017
T1706077-v1 Basic Idea of iKAGRA Calibration Yuta Michimura KAGRA
Interferometer Sensing and Control
20 Jan 2017
T1605353-v12 Arm Length Stabilizaton Conceptual Design Yuta Michimura KAGRA
Interferometer Sensing and Control
Length Sensing and Control
16 Dec 2016
S1402877-v0 Chassis Power Regulator Board S_No.(B_No.022) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402883-v0 Chassis Power Regulator Board S_No.(B_No.028) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402878-v0 Chassis Power Regulator Board S_No.(B_No.023) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
S1402875-v1 Chassis Power Regulator Board S_No.(B_No.020) Masahiro Kamiizumi KAGRA
Digital Control
Circuits
05 Dec 2016
D1504268-v4 RF Patch Panel for KAGRA Yuta Michimura KAGRA
Interferometer Sensing and Control
14 Nov 2016
L1605744-v1 Acceptance for PRM transmission 10.35 % Yoichi Aso et al. KAGRA
Alignment Sensing and control
Interferometer Sensing and Control
Optics
Length Sensing and Control
14 Oct 2016
T1605595-v12 Interferometer design for bKAGRA Phase 1 and Beyond Yuta Michimura KAGRA
Interferometer Sensing and Control
26 Sep 2016
T1605274-v5 MIF Commissioning Schedule Estimate for bKAGRA Phase 1 Yuta Michimura KAGRA meeting
KAGRA
Interferometer
Interferometer Sensing and Control
13 Sep 2016
T1605362-v4 bKAGRA phase1のPRMIとそのASCについて Yutaro Enomoto KAGRA
Alignment Sensing and control
01 Sep 2016
T1605493-v2 bKAGRA IMC sideband frequency Yuta Michimura Modulation
MC
Length Sensing and Control
KAGRA
31 Aug 2016
T1605413-v0 BS/SR2 Rack Location Mark Barton KAGRA
Data Acquisition
Digital Control
Suspensions
29 Jul 2016
M1605401-v1 MIF Schedule for bKAGRA Phase 1 Yuta Michimura System Engineering
Interferometer Sensing and Control
KAGRA
25 Jul 2016
T1503547-v5 bKAGRA PSL Design Study Yuta Michimura Laser
Modulation
Interferometer Sensing and Control
KAGRA
22 Jul 2016
T1504450-v7 BS Actuator Design (including design for SRs and PRs) Yuta Michimura KAGRA
Interferometer Sensing and Control
Circuits
KAGRA meeting
Suspensions
16 Jun 2016
T1605261-v1 Cartoon of the optical layout around PRs Yuta Michimura Interferometer Sensing and Control
Alignment Sensing and control
KAGRA
03 Jun 2016
T1605177-v3 Summary of iKAGRA Test Run April 2016 Yuta Michimura Chief meeting
MC
KAGRA
Interferometer Sensing and Control
Interferometer
13 May 2016
T1605101-v12 Summary of iKAGRA Test Run March 2016 Yuta Michimura Interferometer Sensing and Control
KAGRA
Vacuum
MC
Laser
Suspensions
Chief meeting
22 Apr 2016
T1402346-v3 Noise Requirement for QPDs on TMS Yuta Michimura KAGRA
Alignment Sensing and control
19 Apr 2016
T1605109-v1 iKAGRA online calibration for April test run 2016 Yuta Michimura KAGRA
Interferometer Sensing and Control
09 Apr 2016
G1605000-v5 重力波望遠鏡KAGRAにおける主干渉計制御 Yuta Michimura Interferometer Sensing and Control
KAGRA
JPS
22 Mar 2016
T1503190-v8 RF and AF Cabling Policy for KAGRA ISC Yuta Michimura Circuits
Interferometer Sensing and Control
KAGRA
12 Jan 2016
T1201105-v12 Signal channel list Keiko Kokeyama et al. Digital Control
Interferometer
Data Acquisition
KAGRA
15 Dec 2015
D1504461-v7 RF Distribution Amplifier Front Panel Kentaro Komori Modulation
Circuits
KAGRA
Interferometer Sensing and Control
05 Nov 2015
D1504463-v3 RF Distribution Amplifier Rear Panel Kentaro Komori Interferometer Sensing and Control
KAGRA
Modulation
Circuits
05 Nov 2015
D1504240-v9 Breakout Cable for TTFSS Interface Yuta Michimura KAGRA
Interferometer Sensing and Control
Circuits
16 Oct 2015
S1402881-v0 Chassis Power Regulator Board S_No.(B_No.026) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402882-v0 Chassis Power Regulator Board S_No.(B_No.027) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
L1504365-v1 Visiting Report by Kristof Kremer (KAGRA Visitor Program) Yutaka Shikano Digital Control
Others
KAGRA
12 Oct 2015
G1504334-v1 DGS & AEL report for KAGRA domestic collaboration meeting Osamu Miyakawa Circuits
KAGRA meeting
Digital Control
KAGRA
07 Oct 2015
G1504275-v3 重力波望遠鏡KAGRAの主干渉計制御設計II Yuta Michimura Interferometer Sensing and Control
JPS
KAGRA
Circuits
27 Sep 2015
G1504270-v1 計算機を利用したKAGRAの制御(Ⅶ) Kyosuke Awai et al. JPS
KAGRA
Digital Control
25 Sep 2015
G1504215-v2 iKAGRA ISC Analog Electronics Readiness Status Yuta Michimura Interferometer Sensing and Control
KAGRA
KAGRA meeting
Circuits
07 Sep 2015
S1503423-v0 DAC board Yuta Michimura Data Acquisition
KAGRA
Digital Control
03 Sep 2015
G1504030-v3 KAGRA MIF Status Report (F2F Aug 27, 2015) Yuta Michimura KAGRA F2F
KAGRA
Interferometer Sensing and Control
27 Aug 2015
G1503863-v1 Bayesian approach to the locking problem for high-finesse optical cavities Manuel Marchio Length Sensing and Control
Theory
24 Jul 2015
G1503843-v1 Control system and DAQ system using Real time computers and Analog electronics Osamu Miyakawa Circuits
Digital Control
KAGRA
PAB
17 Jul 2015
T1503330-v1 KAGRA Frequency Stabilization Servo Modeling Report (preliminary) Yuta Michimura Interferometer Sensing and Control
KAGRA
MC
Laser
Length Sensing and Control
03 Jun 2015
G1503582-v3 KAGRA MIF Status Report (May 26, 2015) Yuta Michimura KAGRA meeting
Suspensions
Interferometer Sensing and Control
KAGRA
26 May 2015
G1503555-v1 KAGRA Lock Acquisition in One Slide Yuta Michimura GWADW
KAGRA
Interferometer Sensing and Control
20 May 2015
T1503546-v1 KAGRA デジタル制御スクリーンの作成シフトメモ Kazuhiro Hayama Digital Control
Others
KAGRA
14 May 2015
T1503387-v4 Production request for RF QPD Interface Yoichi Aso et al. KAGRA
Interferometer Sensing and Control
Circuits
30 Mar 2015
T1503388-v1 Production request for RF PD Interface Yoichi Aso et al. Interferometer Sensing and Control
KAGRA
Circuits
30 Mar 2015
D1503389-v6 Intensity Stabilization Servo Plan Yuta Michimura Circuits
Interferometer Sensing and Control
KAGRA
27 Mar 2015
G1503433-v2 重力波望遠鏡KAGRAの主干渉計制御設計 Yuta Michimura Interferometer Sensing and Control
KAGRA
JPS
22 Mar 2015
T1503395-v6 Noise Requirement for IMC QPDs Yuta Michimura MC
Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
13 Mar 2015
T1402332-v3 Beam Jitter Requirements for PSL Beam Yuta Michimura MC
KAGRA
Interferometer Sensing and Control
12 Mar 2015
T1503386-v2 Production request for DC QPD Yoichi Aso et al. Circuits
KAGRA
Interferometer Sensing and Control
09 Mar 2015
T1503327-v7 Positive-g bKAGRA Arm Cavity: ASC Point of View Yuta Michimura Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
25 Feb 2015
G1503331-v7 Optomechanical Instability in the KAGRA Gravitational Wave Telescope Yuta Michimura Alignment Sensing and control
KAGRA
Workshop
20 Feb 2015
G1503267-v3 New iKAGRA Configuration Yuta Michimura KAGRA F2F
Interferometer Sensing and Control
KAGRA
06 Feb 2015
T1503255-v5 Modification Plan for Common Mode Servo Board Yuta Michimura MC
Modulation
KAGRA
Interferometer Sensing and Control
23 Jan 2015
D1403111-v2 Differential or Single-Ended, Which Should We Use for FSS Yuta Michimura Interferometer Sensing and Control
KAGRA
Circuits
16 Dec 2014
S1402873-v0 Chassis Power Regulator Board S_No.(B_No.018) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402872-v0 Chassis Power Regulator Board S_No.(B_No.017) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402871-v0 Chassis Power Regulator Board S_No.(B_No.016) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402870-v0 Chassis Power Regulator Board S_No.(B_No.015) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
S1402869-v0 Chassis Power Regulator Board S_No.(B_No.014) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
G1402961-v1 oplevに用いるQPDの評価 Kentaro Komori et al. Alignment Sensing and control
KAGRA
25 Nov 2014
T1402913-v7 Requirements for IMC Mirror Placement Yuta Michimura KAGRA
Interferometer Sensing and Control
20 Nov 2014
T1402941-v3 Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura MC
Interferometer Sensing and Control
KAGRA
31 Oct 2014
D1402908-v3 IMC Servo Topology Yuta Michimura KAGRA
Interferometer Sensing and Control
MC
KAGRA meeting
30 Oct 2014
S1402905-v0 Chassis Power Regulator Board S_No.(B_No.050) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402904-v0 Chassis Power Regulator Board S_No.(B_No.049) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402903-v0 Chassis Power Regulator Board S_No.(B_No.048) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402894-v0 Chassis Power Regulator Board S_No.(B_No.039) Masahiro Kamiizumi KAGRA
Digital Control
Circuits
20 Oct 2014
S1402902-v0 Chassis Power Regulator Board S_No.(B_No.047) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402893-v0 Chassis Power Regulator Board S_No.(B_No.038) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402901-v0 Chassis Power Regulator Board S_No.(B_No.046) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
S1402892-v0 Chassis Power Regulator Board S_No.(B_No.037) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402900-v0 Chassis Power Regulator Board S_No.(B_No.045) Masahiro Kamiizumi KAGRA
Digital Control
Circuits
20 Oct 2014
S1402891-v0 Chassis Power Regulator Board S_No.(B_No.036) Masahiro Kamiizumi KAGRA
Digital Control
Circuits
20 Oct 2014
S1402899-v0 Chassis Power Regulator Board S_No.(B_No.044) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402898-v0 Chassis Power Regulator Board S_No.(B_No.043) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402890-v0 Chassis Power Regulator Board S_No.(B_No.035) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402897-v0 Chassis Power Regulator Board S_No.(B_No.042) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402889-v0 Chassis Power Regulator Board S_No.(B_No.034) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402896-v0 Chassis Power Regulator Board S_No.(B_No.041) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402888-v0 Chassis Power Regulator Board S_No.(B_No.033) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402895-v0 Chassis Power Regulator Board S_No.(B_No.040) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402887-v0 Chassis Power Regulator Board S_No.(B_No.032) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
20 Oct 2014
S1402886-v0 Chassis Power Regulator Board S_No.(B_No.031) Masahiro Kamiizumi KAGRA
Circuits
Digital Control
20 Oct 2014
S1402885-v0 Chassis Power Regulator Board S_No.(B_No.030) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
S1402884-v0 Chassis Power Regulator Board S_No.(B_No.029) Masahiro Kamiizumi KAGRA
Digital Control
Circuits
20 Oct 2014
D1301561-v2 Rack Layout for Small Network System Osamu Miyakawa Digital Control
KAGRA
28 Oct 2014
T1201168-v4 Resource list for digital control system Osamu Miyakawa Digital Control
KAGRA
28 Oct 2014
S1402906-v0 Chassis Power Regulator Board S_No.(B_No.051) Masahiro Kamiizumi Circuits
Digital Control
KAGRA
20 Oct 2014
G1402860-v0 DGS & AEL report for KAGRA domestic collaboration meeting Shinji Miyoki Domestic
KAGRA
Digital Control
KAGRA meeting
Circuits
15 Oct 2014
S1402766-v0 Chassis Power Regulator Board S_No.(B_No.013) Masahiro Kamiizumi Digital Control
Circuits
KAGRA
11 Sep 2014
T1402615-v1 ホワイトニングフィルタの測定に関するレポート Masato Toritani Digital Control
KAGRA
Others
18 Aug 2014
D1402519-v8 Optical/Electrical Components Needed for iKAGRA IMC Servo Yuta Michimura Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
Seismic Isolation
MC
Length Sensing and Control
04 Aug 2014
T1202403-v1 KAGRAでは光てこをどうするか Yuta Michimura KAGRA
Alignment Sensing and control
KAGRA meeting
19 May 2014
G1402319-v3 新潟大学IMC WFS打ち合せ資料 Yuta Michimura MC
Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
18 Apr 2014
G1402342-v0 DGS report for KAGRA domestic collaboration meeting Osamu Miyakawa Domestic
Interferometer Sensing and Control
Data Acquisition
KAGRA
KAGRA meeting
Digital Control
16 Apr 2014
G1402327-v3 Hafordに行ってきました~2014冬~ Yuta Michimura KAGRA
Seminar
Other Groups
Interferometer Sensing and Control
11 Apr 2014
G1402278-v3 KAGRA 3rd External review for DiGital System subgroup Osamu Miyakawa Digital Control
KAGRA
Reviews
01 Apr 2014
T1200913-v6 KAGRA Main Interferometer Design Document Yoichi Aso et al. Interferometer
Interferometer Sensing and Control
Others
KAGRA
Alignment Sensing and control
Length Sensing and Control
19 Feb 2014
G1402171-v1 Some calculations for BRT design Yuta Michimura Alignment Sensing and control
KAGRA
30 Jan 2014
G1301943-v1 How to design feedback filters for a given system? Osamu Miyakawa Interferometer Sensing and Control
Seminar
28 Oct 2013
G1301851-v1 Real Time Control for KAGRA 3km Cryogenic Gravitational Wave Detector in Japan Osamu Miyakawa Digital Control
KAGRA
International
Conference
15 Oct 2013
G1301893-v2 News from LIGO - October 2013 Koji Arai MC
Other Groups
Interferometer Sensing and Control
09 Oct 2013
G1301802-v1 Alignment Sensing and Control for KAGRA Interferometer Yuta Michimura Workshop
Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
16 Aug 2013
G1301779-v2 WFS Shot Noise Requirement Yuta Michimura KAGRA F2F
Alignment Sensing and control
KAGRA
02 Aug 2013
G1301664-v1 WFS信号への要求値 Yuta Michimura Data Analysis
Alignment Sensing and control
28 May 2013
G1301633-v2 Alignment Sensing and Control for KAGRA Yuta Michimura Workshop
KAGRA
Alignment Sensing and control
19 Apr 2013
G1301624-v2 Status report from DGS and AEL for KAGRA collaboration meeting Osamu Miyakawa Circuits
KAGRA meeting
Digital Control
KAGRA
Domestic
17 Apr 2013
D1200900-v2 Rack Layout for Standalone Digital System at Kamioka branch Osamu Miyakawa Digital Control
KAGRA
06 Mar 2013
G1301538-v2 KAGRA OMC Kentaro Somiya Interferometer Sensing and Control
16 Feb 2013
T1301495-v1 OMC length noise contribution Kentaro Somiya KAGRA
Interferometer Sensing and Control
28 Jan 2013
T1301492-v3 Feed-forward error due to the rms fluctuation of the recycling cavities Kentaro Somiya Length Sensing and Control
KAGRA
25 Jan 2013
G1201442-v1 DGS and AEL report for KAGRA domestic collaboration meeting on 12/18/2012 Osamu Miyakawa Data Acquisition
KAGRA
Circuits
KAGRA meeting
Digital Control
16 Dec 2012
D1100404-v0 Network diagram of standalone Real-Time system at Kamioka Osamu Miyakawa Digital Control
KAGRA
28 Mar 2011
G1201380-v1 大型重力波検出器KAGRAにおける計測と制御 Osamu Miyakawa Digital Control
Data Acquisition
Collaboration meeting
KAGRA
Interferometer Sensing and Control
06 Nov 2012
T1201358-v1 Insrtuctions on how to build a realtime model on the TAMA Linux machines Kiwamu Izumi KAGRA
Digital Control
26 Oct 2012
T1201345-v6 CLIO試験運転でのDetector Characterizationの活動報告 Kazuhiro Hayama et al. CLIO
Others
Data Acquisition
Data Analysis
Digital Control
22 Oct 2012
G1101303-v1 Alignment Sensing and Control for LCGT Yuta Michimura Alignment Sensing and control
KAGRA
Conference
02 Oct 2012
T1201286-v1 周波数安定化の概念設計(検討) Daisuke Tatsumi et al. KAGRA meeting
KAGRA
Interferometer Sensing and Control
24 Sep 2012
G1201206-v1 DGS and AEL report for KAGRA f2f meeting on 7/31/2012 Osamu Miyakawa KAGRA F2F
Circuits
Digital Control
KAGRA
15 Sep 2012
G1201264-v2 計算機を利用したKAGRAの制御(Ⅲ) Osamu Miyakawa Digital Control
KAGRA
JPS
12 Sep 2012
G1201268-v1 補助ロックシステム設計 Daisuke Tatsumi Length Sensing and Control
Conference
KAGRA
10 Sep 2012
G1201152-v1 DGS and AEL report for KAGRA domestic collaboration meeting on 7/7/2012 Osamu Miyakawa Domestic
KAGRA
Digital Control
Circuits
KAGRA meeting
08 Jul 2012
G1201131-v1 KAGRAの制御 (富山大とのワークショップ) Osamu Miyakawa KAGRA
Conference
Interferometer Sensing and Control
06 Jul 2012
T1201108-v1 Transmission Monitoring Telescope Strawman design; Discussion of June 14-2012 Riccardo DeSalvo Interferometer Sensing and Control
KAGRA
15 Jun 2012
T1100689-v2 Channel numbers for VIS Osamu Miyakawa et al. KAGRA
Data Acquisition
Circuits
Digital Control
Suspensions
Seismic Isolation
08 Jun 2012
T1100714-v1 Terminator list for Pre-isolator Osamu Miyakawa et al. Digital Control
Seismic Isolation
KAGRA
Data Acquisition
08 Jun 2012
T1201095-v3 KAGRA RF PD検討 Shigenori Hiramatsu KAGRA
Others
Interferometer Sensing and Control
Circuits
04 Jun 2012
G1201064-v1 Status report from DGS group for KAGRA international collaboration meeting Osamu Miyakawa Digital Control
KAGRA meeting
KAGRA
28 May 2012
G1201046-v1 グリーンロック実験報告 Kiwamu Izumi Other Groups
Seminar
Length Sensing and Control
25 May 2012
G1200989-v1 KAGRA 2nd External review for digital system subgroup Osamu Miyakawa Reviews
KAGRA
Digital Control
17 Apr 2012
G1200967-v1 Status report from DGS group in domestic KAGRA collaboration meeting Osamu Miyakawa KAGRA meeting
Digital Control
Domestic
KAGRA
16 Apr 2012
G1200925-v1 計算機を利用したLCGTの制御(II) Osamu Miyakawa JPS
KAGRA
Digital Control
22 Mar 2012
T1200910-v3 Document of Digital System Subgroup for 2nd External Review Osamu Miyakawa Digital Control
KAGRA
Reviews
21 Mar 2012
G1200792-v2 Internal Review for Digital system subgroup Osamu Miyakawa Reviews
KAGRA
Digital Control
13 Mar 2012
D1200894-v1 Standalone Digital System for VIS Rack Layout Osamu Miyakawa KAGRA
Seismic Isolation
Suspensions
Digital Control
06 Mar 2012
G1200884-v1 低温重力波検出器KAGRAの制御 Osamu Miyakawa Digital Control
KAGRA
Interferometer Sensing and Control
Interferometer
20 Feb 2012
G1200854-v1 Status of MIF 2012/2/3 Yoichi Aso KAGRA F2F
Length Sensing and Control
Interferometer Sensing and Control
KAGRA
03 Feb 2012
G1200817-v1 Lecture of Standalone Digital system for VIS Osamu Miyakawa Seismic Isolation
Suspensions
Digital Control
KAGRA
31 Jan 2012
G1200809-v1 MIF Internal Review 2012/1/27 Yoichi Aso KAGRA
Reviews
Interferometer
Interferometer Sensing and Control
26 Jan 2012
G1200808-v1 LCGT ASC Recap Yuta Michimura Alignment Sensing and control
KAGRA
Special Working Group
26 Jan 2012
T1200788-v1 Green Lock の制御設計 Koji Arai et al. KAGRA
KAGRA meeting
Length Sensing and Control
18 Jan 2012
G1100740-v1 MIF Status 2011 -12-12 Yoichi Aso KAGRA meeting
KAGRA
Interferometer Sensing and Control
Interferometer
12 Dec 2011
G1100726-v2 Status report from DGS group in domestic LCGT collaboration meeting Osamu Miyakawa Data Acquisition
KAGRA
Data Analysis
Digital Control
Circuits
KAGRA meeting
12 Dec 2011
G1100724-v2 Lecture for Standalone system at NAOJ Osamu Miyakawa Data Analysis
KAGRA
Data Acquisition
Digital Control
12 Dec 2011
G1100680-v1 Digital system status report Osamu Miyakawa Digital Control
KAGRA meeting
KAGRA
International
08 Nov 2011
G1100677-v1 Status of Main Interferometer Subsystem 2011 Nov. Yoichi Aso KAGRA
Interferometer
Interferometer Sensing and Control
KAGRA meeting
08 Nov 2011
G1100627-v1 計算機を利用したレーザー干渉計型重力波検出器の制御 Osamu Miyakawa KAGRA
Interferometer Sensing and Control
Digital Control
04 Oct 2011
G1100608-v1 LCGTのアラインメント制御 Yuta Michimura KAGRA
Alignment Sensing and control
JPS
21 Sep 2011
G1100604-v1 LCGTの主干渉計設計 Yoichi Aso Length Sensing and Control
KAGRA
JPS
Interferometer
Interferometer Sensing and Control
20 Sep 2011
G1100596-v3 計算機を利用したLCGTの制御 Osamu Miyakawa JPS
KAGRA
Digital Control
18 Sep 2011
D1100588-v1 LCGT digital system layer map Osamu Miyakawa KAGRA
Digital Control
07 Sep 2011
D1100585-v1 AA/AI 1U box Bottm and Side Panel Osamu Miyakawa KAGRA
Digital Control
Circuits
05 Sep 2011
D1100584-v1 Anti-Alies Chassis Rear Panel Osamu Miyakawa Digital Control
Circuits
KAGRA
05 Sep 2011
D1100583-v1 Anti-Alies Chassis Front Panel Osamu Miyakawa KAGRA
Digital Control
05 Sep 2011
G1100511-v3 Digital system report Osamu Miyakawa KAGRA F2F
Digital Control
KAGRA
04 Aug 2011
G1100533-v1 Current Status of ASC Design for LCGT Yuta Michimura KAGRA F2F
KAGRA
Alignment Sensing and control
03 Aug 2011
D1000102-v1 ADC differential driver Shinji Miyoki CLIO
Circuits
Digital Control
22 Jul 2011
G1100496-v2 デジタル月例ミーティング20110706 解析ソフト Kazuhiro Hayama Collaboration meeting
Digital Control
Data Analysis
06 Jul 2011
G1100459-v1 Current Status of the MIF working group 2011/6/13 Yoichi Aso Length Sensing and Control
KAGRA meeting
Alignment Sensing and control
KAGRA
Interferometer Sensing and Control
13 Jun 2011
G1100458-v1 Dangers of controls from the cryogenic links Riccardo DeSalvo Alignment Sensing and control
KAGRA
13 Jun 2011
G1100413-v1 Analog Electronics report 2011-04-08 Shigenori Moriwaki KAGRA
KAGRA meeting
Digital Control
08 Apr 2011
G1100398-v1 Arm Length Stabilization at the 40m prototype Kiwamu Izumi Others
R&D
Length Sensing and Control
19 Mar 2011
G1100388-v2 Review document for Digital subgroup Osamu Miyakawa Digital Control
Reviews
KAGRA
02 Mar 2011
G1100379-v3 Main Interferometer Subsystem Type B Review Yoichi Aso Length Sensing and Control
Interferometer Sensing and Control
Interferometer
Alignment Sensing and control
KAGRA
Reviews
28 Feb 2011
T1100363-v1 LCGT Main Interferometer Design Yoichi Aso Optics
Length Sensing and Control
KAGRA
Reviews
Alignment Sensing and control
Interferometer Sensing and Control
Interferometer
21 Feb 2011
T1100359-v2 External review for digital system Osamu Miyakawa KAGRA
Reviews
Digital Control
21 Feb 2011
T1100350-v3 Down-selection of SB frequencies for LCGT Kentaro Somiya KAGRA
Interferometer Sensing and Control
15 Feb 2011
G1100343-v2 MIF Meeting Feb 9 2011 Yoichi Aso KAGRA
Collaboration meeting
Alignment Sensing and control
Interferometer
Interferometer Sensing and Control
Optics
Length Sensing and Control
10 Feb 2011
G1100324-v3 Status report from digital system subgroup Osamu Miyakawa KAGRA
KAGRA F2F
Digital Control
04 Feb 2011
G1100322-v1 Current Status of Main Interferometer Design Yoichi Aso Interferometer
Interferometer Sensing and Control
Alignment Sensing and control
KAGRA
KAGRA F2F
Length Sensing and Control
04 Feb 2011
M0900010-v4 ICD of Digital Control Subsystem Osamu Miyakawa Digital Control
ICD
KAGRA
23 Dec 2010
G1000268-v1 LCGT ISC Review 2010/12/7 Yoichi Aso KAGRA
Reviews
Interferometer Sensing and Control
Length Sensing and Control
07 Dec 2010
G1000178-v2 Status report from digital system subgroup Osamu Miyakawa KAGRA
KAGRA F2F
Digital Control
16 Nov 2010
G1000235-v2 Review A for digital system subgroup Osamu Miyakawa Reviews
KAGRA
Digital Control
06 Nov 2010
T1000209-v2 デジタルシステムの各サブグループへの配布 Osamu Miyakawa Digital Control
Reviews
KAGRA
28 Oct 2010
T1000208-v2 LCGT digital system -システム全体- Osamu Miyakawa Digital Control
Reviews
KAGRA
28 Oct 2010
T1000216-v1 Test Mass Optical Lever Rough Plan Yoichi Aso Interferometer Sensing and Control
Others
KAGRA
Vacuum
27 Oct 2010
G0900049-v2 低温レーザー干渉計CLIO(25)デジタルシステムの導入 Osamu Miyakawa Digital Control
JPS
CLIO
20 Oct 2010
G1000191-v1 Current Status of the LCGT Interferometer Design Yoichi Aso KAGRA
Alignment Sensing and control
Interferometer
Interferometer Sensing and Control
Length Sensing and Control
KAGRA F2F
27 Sep 2010
G1000175-v1 IFO Desing related topics - Chief Meeting Sept 21 Yoichi Aso KAGRA
Alignment Sensing and control
Interferometer Sensing and Control
Interferometer
Length Sensing and Control
21 Sep 2010
G1000172-v3 低温レーザー干渉計CLIO(30)デジタル制御IV Osamu Miyakawa CLIO
JPS
Digital Control
10 Sep 2010
G1000148-v1 Current Issues of LCGT Interferometer Design Yoichi Aso Length Sensing and Control
Interferometer Sensing and Control
Interferometer
Alignment Sensing and control
KAGRA
09 Aug 2010
D1000139-v1 DAC interface box Naoko Ohishi et al. KAGRA
CLIO
Circuits
Digital Control
27 Jul 2010
D1000132-v1 Whitening Filter Daisuke Tatsumi CLIO
Circuits
Digital Control
13 Jul 2010
T1000122-v6 LCGT folded PRC design Daisuke Tatsumi Special Working Group
Alignment Sensing and control
KAGRA
21 Jun 2010
G1000112-v1 干渉計制御作業部会の現状報告 Yoichi Aso Interferometer Sensing and Control
KAGRA
Alignment Sensing and control
KAGRA F2F
Length Sensing and Control
14 Jun 2010
G1000111-v1 作業部会報告 Digital Osamu Miyakawa KAGRA
Digital Control
KAGRA F2F
14 Jun 2010
T1000093-v3 LCGT RSEのためのR&Dの現状について Osamu Miyakawa R&D
KAGRA
Collaboration meeting
Interferometer Sensing and Control
Interferometer
01 Jun 2010
G1000098-v2 Commissioning work on the low temperature interferometer collaboration CLIO et al. Digital Control
Cryogenic
CLIO
Conference
16 May 2010
D1000097-v1 Binary output differential receiver Daisuke Tatsumi CLIO
Digital Control
14 May 2010
G1000095-v1 LCGT RSE ロードマップ特別作業班 Masaki Ando R&D
Collaboration meeting
KAGRA
Interferometer
Interferometer Sensing and Control
10 May 2010
T1000092-v2 LCGTのRCを折り返すかどうか Kentaro Somiya Alignment Sensing and control
KAGRA
30 Apr 2010
G1000081-v2 低温レーザー干渉計CLIO(28)デジタルシステムの導入III Koji Arai et al. JPS
CLIO
Digital Control
22 Mar 2010
G1000076-v3 Digital systemの現状 Osamu Miyakawa Digital Control
CLIO
Seminar
04 Mar 2010
G1000069-v3 PLUS-2009年度の活動状況 Masaki Ando et al. TAMA
Infrastructure
Optics
Cryogenic
KAGRA meeting
Auxiliary IFO
Laser
Suspensions
Seismic Isolation
R&D
Reviews
CLIO meeting
KAGRA
Interferometer Sensing and Control
CLIO
Interferometer
25 Feb 2010
D0900067-v1 Differential reciever Daisuke Tatsumi CLIO
Digital Control
Circuits
14 Feb 2010
D0900061-v4 AA/AI filter Daisuke Tatsumi Circuits
Digital Control
CLIO
09 Feb 2010
D0900059-v1 AA to ADC adapter Daisuke Tatsumi Digital Control
Circuits
CLIO
25 Nov 2009
D0900060-v1 DAC adapter Daisuke Tatsumi Digital Control
Circuits
CLIO
25 Nov 2009
G0900055-v3 digital system Osamu Miyakawa Digital Control
Others
CLIO
10 Oct 2009
G0900053-v1 Matlab上で動くOptickleを使った干渉計シミュレーション Osamu Miyakawa Collaboration meeting
KAGRA
Interferometer Sensing and Control
01 Oct 2009
T0500048-v1 LCGT制御法検討レポート Kentaro Somiya Length Sensing and Control
KAGRA
08 Sep 2009
G0900042-v1 LCGTにおけるloop coupling noiseの検証 Osamu Miyakawa Interferometer Sensing and Control
Collaboration meeting
KAGRA
20 Aug 2009
G0900041-v1 LCGTにおける帯域幅可変の可能性 Osamu Miyakawa KAGRA
Collaboration meeting
Length Sensing and Control
06 Aug 2009
T0900040-v1 Offset locking with transmitted light Osamu Miyakawa et al. Length Sensing and Control
KAGRA
27 Jul 2009
G0900037-v1 LCGTにoffset lockを適用した場合の考察 Osamu Miyakawa et al. KAGRA
Collaboration meeting
Length Sensing and Control
22 Jul 2009
G0900035-v2 2005年のLCGTデザインの検証 Osamu Miyakawa Length Sensing and Control
KAGRA
Collaboration meeting
16 Jul 2009
G0900032-v1 LCGT制御法のアップデート Kentaro Somiya KAGRA
Interferometer Sensing and Control
Interferometer
15 Jul 2009
G0900027-v1 光路長制御の各自由度間のカップリングによるノイズ Osamu Miyakawa KAGRA
Collaboration meeting
Length Sensing and Control
02 Jul 2009
G0900024-v1 SPI検証のためのロックアクイジションの考察 Osamu Miyakawa KAGRA
Collaboration meeting
Interferometer Sensing and Control
30 Jun 2009
M0900009-v1 ICD of Interferometer Sensing And Control Subsystem Yoichi Aso Interferometer Sensing and Control
KAGRA
ICD
24 Jun 2009
G0900006-v1 Digital systemを利用した干渉計制御 Osamu Miyakawa CLIO
Collaboration meeting
Digital Control
22 Jun 2009
G0900005-v1 低温干渉計CLIO(19)デジタル制御 Osamu Miyakawa CLIO
Digital Control
22 Jun 2009

Number of documents found: 339

DocDB Home ]  [ Search ] [ Recent Changes ]

DocDB Version 8.7.10, contact Document Database Administrators
Execution time: 9 wallclock secs ( 2.76 usr + 0.44 sys = 3.20 CPU)